Date
  | 
	Hours
  | 
	Work Log Summary 
		 
  | 
	Details 
		 
  | 
	
		
	
	 10-03-2016
  | 
	4.50
  | 
	Finishing the Flaps
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-02-2016
  | 
	4.50
  | 
	Atart assembly of Flap parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-01-2016
  | 
	2.50
  | 
	All Flap internal parts Alodined
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 09-30-2016
  | 
	5.00
  | 
	Flaps attachment rib bracket
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-20-2016
  | 
	4.50
  | 
	Test fit all parts for both Flaps
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-19-2016
  | 
	4.50
  | 
	Finished riveting Ailerons
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-18-2016
  | 
	6.00
  | 
	Ailerons continued
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-18-2016
  | 
	6.00
  | 
	Aileron counterweight installation
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-17-2016
  | 
	6.50
  | 
	Preassembly of Aileron parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-16-2016
  | 
	7.50
  | 
	Prefit all aileron parts/ preped for primer
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-11-2016
  | 
	4.00
  | 
	preparing the ailerons
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-05-2016
  | 
	8.00
  | 
	Decided to install the Pitot tube mounting bracket
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 09-01-2016
  | 
	4.00
  | 
	Riveted both the Aileron an Flap braces on the rea
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-31-2016
  | 
	5.00
  | 
	Deburred and primed the aileron and flap braces
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-31-2016
  | 
	6.50
  | 
	Aileron hinge bracket installation both wings
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-30-2016
  | 
	3.00
  | 
	Temporarily installed, match drilled, deburred Hin
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-30-2016
  | 
	7.00
  | 
	Removed right wing from wing stand onto work bench
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-29-2016
  | 
	4.00
  | 
	riveted the top skins on the Left wing
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-27-2016
  | 
	5.50
  | 
	Finished Riveting  the Right wing top skins
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-26-2016
  | 
	3.50
  | 
	Start of riveting the top skins on Right wing
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-25-2016
  | 
	6.50
  | 
	Leak test Left tank, Install access panels an nutp
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-24-2016
  | 
	1.50
  | 
	2nd attempt to leak test tanks
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-23-2016
  | 
	2.00
  | 
	First attempt to leak test Right wing tank
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-22-2016
  | 
	12.00
  | 
	Process of sealing the Left wing tank, ( duplicate
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-22-2016
  | 
	8.00
  | 
	Final assembly of left wing tank
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-21-2016
  | 
	6.00
  | 
	Final installation of right tank parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-21-2016
  | 
	8.00
  | 
	Closing up right wing tank with baffle
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-20-2016
  | 
	8.00
  | 
	Cont' build on right wing tank
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-19-2016
  | 
	6.00
  | 
	Started the rib installation on right fuel tank
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 08-18-2016
  | 
	6.00
  | 
	Start of wing tank sealant
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-18-2016
  | 
	4.00
  | 
	Installing stiffners with sealant right fuel tank
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-17-2016
  | 
	7.00
  | 
	Riveting leading edge ribs to main spar/ row of ri
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-16-2016
  | 
	6.00
  | 
	Finished riveting Right wing leading edge
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-15-2016
  | 
	8.00
  | 
	Final assembly of the left wing leading edge
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-14-2016
  | 
	4.00
  | 
	Dimpling the skins and clecoing in place on wing f
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-14-2016
  | 
	4.00
  | 
	Dimpled the top skins for the Left wing
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-13-2016
  | 
	9.00
  | 
	Preparing the top and bottom skins for Wash Coat p
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-11-2016
  | 
	6.00
  | 
	Temporarily assembled both leading edges.
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 08-11-2016
  | 
	6.00
  | 
	Riveted the Right wing ribs to main spar an rear s
  | 
	
			Details 
		 | 
	
	 		  
				 
		       | 
 
	
  | 
	
	
	 08-07-2016
  | 
	5.00
  | 
	Start of Wing assembly of ribs and rear spar to ma
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-06-2016
  | 
	5.50
  | 
	Start of wash coat primer on wing parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-06-2016
  | 
	4.00
  | 
	Final steps of Wash Coat primer on wing parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-30-2016
  | 
	6.50
  | 
	Finished the access opening on the left wing/ adde
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-26-2016
  | 
	6.00
  | 
	Final prep of wing ribs before primer
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-24-2016
  | 
	5.50
  | 
	Prep for primer wing ribs and rear spar
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-23-2016
  | 
	6.00
  | 
	Finished pre assembly of fuel tanks
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-23-2016
  | 
	8.00
  | 
	Final prep of both wing tanks
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-22-2016
  | 
	4.50
  | 
	Dimpled for fuel caps, test fit flop tube in tank 
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-22-2016
  | 
	6.50
  | 
	bent and prefit vent tube for left wing tank, alon
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-21-2016
  | 
	2.00
  | 
	Test fit the usher tank cap right wing tank, drill
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-21-2016
  | 
	7.50
  | 
	Fly cut rear baffle for left tank, dibpled skin, p
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-21-2016
  | 
	1.50
  | 
	Drilled the attachment angle Left wing tank for fl
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-20-2016
  | 
	6.50
  | 
	Attaching the attachment ring to right wing tank r
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-19-2016
  | 
	7.50
  | 
	Making attachment angles and checking for vent tub
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-19-2016
  | 
	4.50
  | 
	Fly cutting access for Right wing tank sender and 
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-17-2016
  | 
	8.00
  | 
	Made the tank splice plates for both tanks an asse
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-15-2016
  | 
	8.50
  | 
	First assembly of Right wing tank stiffners and ri
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-11-2016
  | 
	4.00
  | 
	Same procedure as Left leading edge on Right wing
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-10-2016
  | 
	6.50
  | 
	Temporarily installed left leading edge to match d
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-10-2016
  | 
	4.50
  | 
	Preparing the left wing leading edge
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-10-2016
  | 
	4.50
  | 
	Made jig for the leading edge and tank constructio
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 07-09-2016
  | 
	8.50
  | 
	Clecoed the top and bottom wing skins on the wing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-08-2016
  | 
	3.50
  | 
	Setting up Wing jig with spars and ribs checking f
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-06-2016
  | 
	4.00
  | 
	Drilled angle for wing jigs, attached and placed l
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-04-2016
  | 
	3.00
  | 
	Preassembled wing spars and ribs left wing
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-03-2016
  | 
	3.50
  | 
	Seperated, straightened  all wing ribs
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-03-2016
  | 
	2.50
  | 
	Finish right rear wing spar parts and scotch brite
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 07-02-2016
  | 
	3.50
  | 
	Getting wing rear spar parts together
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-02-2016
  | 
	3.50
  | 
	Finish the deburing and prefit of rear wing spar c
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 07-01-2016
  | 
	6.50
  | 
	Fabricated Tie down attachment brackets and spacer
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-30-2016
  | 
	1.50
  | 
	Final installation of main wing spar nutplates
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-29-2016
  | 
	5.50
  | 
	Installation of nutplates on main wing spar
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-27-2016
  | 
	3.00
  | 
	Drilled, deburred, countersink #8 screw holes
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 06-25-2016
  | 
	3.00
  | 
	Made wing spar support blocks for work table
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-24-2016
  | 
	3.50
  | 
	Installed 4x4 posts floor to ceiling for wing buil
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-22-2016
  | 
	3.50
  | 
	added stainless steel to floor area for wear plate
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-21-2016
  | 
	3.50
  | 
	Temporarily installed front skin and baggage door 
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-19-2016
  | 
	3.50
  | 
	Assembly of the forward baggage door
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-18-2016
  | 
	1.50
  | 
	Com antenna and transponder antenna doubler plates
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 06-17-2016
  | 
	3.50
  | 
	counter sink all doubler plates and fuselage for a
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-11-2016
  | 
	2.50
  | 
	Doubler plates for Com antenna and Transponder Ant
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-06-2016
  | 
	2.50
  | 
	Finished riveting Turtle deck
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-04-2016
  | 
	1.00
  | 
	View from the left side of the turtle deck. Bulkhe
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 06-04-2016
  | 
	5.00
  | 
	Start of riveting on the Turtle deck
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-03-2016
  | 
	2.00
  | 
	Used pro seal to attach the items listed in the pi
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-03-2016
  | 
	2.50
  | 
	Temporarily installed the rear turtle deck
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-03-2016
  | 
	3.00
  | 
	Placed moving blankets inside the floor area to be
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-03-2016
  | 
	3.50
  | 
	Fabricated avionics shelf behind panel
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 06-03-2016
  | 
	2.50
  | 
	Drilled and installed the rudder cable fairings
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-30-2016
  | 
	2.50
  | 
	Finish paint on Forward baggage, and rear skin
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-29-2016
  | 
	2.50
  | 
	Primmed rear skin, step and front skin parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-29-2016
  | 
	2.50
  | 
	Primmed panel, forward skin, baggage parts and rea
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-28-2016
  | 
	2.50
  | 
	Assemble mounting rings and brackets on panel
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-27-2016
  | 
	2.50
  | 
	Received the mounting kit for the Garmin G3X scree
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-19-2016
  | 
	3.50
  | 
	Installation of front throttle quadrant and tempor
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-18-2016
  | 
	2.50
  | 
	Received the Panel from Stein Air
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-15-2016
  | 
	1.50
  | 
	Installed rear throttle quadrant
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 05-14-2016
  | 
	3.50
  | 
	Drilled all floor holes to install nut plates
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-07-2016
  | 
	2.00
  | 
	Alodine GMU and Elt mounts
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 05-05-2016
  | 
	3.50
  | 
	Magnotometer and Elt antenna mount
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 05-02-2016
  | 
	2.50
  | 
	Sent panel off to Stein Air
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 05-01-2016
  | 
	3.00
  | 
	Fit forward baggage door and instrument panel
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-30-2016
  | 
	3.50
  | 
	Final installation of landing gear weldment screws
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-23-2016
  | 
	2.00
  | 
	Terminal at firewall and firewall pass thru
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-22-2016
  | 
	2.50
  | 
	Installed master contactor and firewall pass thru
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-21-2016
  | 
	2.50
  | 
	run battery cable from aft battery location to fir
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-20-2016
  | 
	2.00
  | 
	Forward skin roll edge and dimple
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 04-19-2016
  | 
	3.50
  | 
	Prep forward baggage door
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-18-2016
  | 
	4.00
  | 
	prepped front skin for attachment
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-17-2016
  | 
	4.50
  | 
	Install forward wind screen roll bar
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-16-2016
  | 
	3.50
  | 
	Panel clecoed, then riveted
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-15-2016
  | 
	5.50
  | 
	Prep parts for instrument panel
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-10-2016
  | 
	3.50
  | 
	Front wind screen roll bar fit and drilling
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-08-2016
  | 
	4.50
  | 
	Prepare turtle deck skin
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-07-2016
  | 
	2.50
  | 
	Static line install
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-04-2016
  | 
	2.50
  | 
	Rear seat back bulkhead storage bracket gussets
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 04-03-2016
  | 
	4.00
  | 
	Parking brake process #2
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 04-02-2016
  | 
	2.00
  | 
	Parking brake installation ( Grove valve)
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-31-2016
  | 
	6.50
  | 
	Rear bulkhead prep for paint and installation
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-30-2016
  | 
	3.50
  | 
	Brake lines to landing gear fabrication
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-29-2016
  | 
	1.00
  | 
	fuel selector cover plate and valve handle
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-29-2016
  | 
	3.50
  | 
	Fuel pump installation with fuel filter
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-29-2016
  | 
	3.00
  | 
	Final fuel line installation in Fuselage
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-28-2016
  | 
	6.50
  | 
	Tank Vent lines installation with vent farings
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-27-2016
  | 
	3.00
  | 
	Prep for top coat interior fuselage
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-26-2016
  | 
	3.50
  | 
	Applied Polyurethane primer to fuselage interior
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-25-2016
  | 
	4.50
  | 
	Prep for paint interior fuselage
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-23-2016
  | 
	1.50
  | 
	temporarily installed rear bulkheads and turtle de
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-21-2016
  | 
	3.25
  | 
	Test step and hardware for fit
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 03-20-2016
  | 
	2.00
  | 
	Final installation requirements for rear throttle
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-19-2016
  | 
	3.00
  | 
	Rear throttle quadrant pushrod and mounting plate
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-18-2016
  | 
	3.50
  | 
	Rear seat throttle quadrant install
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-18-2016
  | 
	3.50
  | 
	Another modification/ Map pocket
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-17-2016
  | 
	2.00
  | 
	Fuel Gauge housing test fit, First time in Fuselag
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-16-2016
  | 
	4.50
  | 
	Mechanical fuel gauges modification
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-04-2016
  | 
	2.50
  | 
	Painted front baggage floor, repainted seat back
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-03-2016
  | 
	3.50
  | 
	Front baggage floor modification for master cylind
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-02-2016
  | 
	2.50
  | 
	More parts of fuselage painting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-01-2016
  | 
	2.50
  | 
	Type of paint used and first parts painted
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-29-2016
  | 
	6.50
  | 
	Battery tray modification for transponder/ELT
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-28-2016
  | 
	2.50
  | 
	Installed and riveted Panel access door
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-27-2016
  | 
	5.50
  | 
	Cont' panel access door
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-26-2016
  | 
	4.50
  | 
	Rear panel access door
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-25-2016
  | 
	2.50
  | 
	Map, or what ever pocket under switch tray
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-23-2016
  | 
	5.00
  | 
	Baggage door battery access
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-22-2016
  | 
	5.50
  | 
	Baggage door battery access modification
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-19-2016
  | 
	2.50
  | 
	Battery tray assembly/ Marked shelf for access
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-18-2016
  | 
	3.00
  | 
	Alieron trim servo brackets/ battery tray
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-17-2016
  | 
	4.00
  | 
	Drill, install garmin pitch servo brackets
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-11-2016
  | 
	3.50
  | 
	Final drilling of grove gear legs
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-10-2016
  | 
	2.50
  | 
	Final check gear measurements/ Drilled one side
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-09-2016
  | 
	1.50
  | 
	Plumb bob locations
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-08-2016
  | 
	3.50
  | 
	Leveled Fuselage, Prep for gear attachment
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-07-2016
  | 
	2.00
  | 
	Outboard brackets trim adjustments
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-06-2016
  | 
	1.50
  | 
	Installed gear legs for setup
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-31-2016
  | 
	2.00
  | 
	Grove gear mounting brackets set up
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-14-2015
  | 
	3.00
  | 
	Disassembly of interior parts to allow for paint
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-13-2015
  | 
	2.00
  | 
	Final adjustment of Elevator travel. ( no pics)
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-12-2015
  | 
	4.00
  | 
	Installed rudder cables/rear seat pedal assembly
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-11-2015
  | 
	2.00
  | 
	Pedal assembly slide lock
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-06-2015
  | 
	1.50
  | 
	Master cylinder installation
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-05-2015
  | 
	4.50
  | 
	Rudder/brake pedals
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-04-2015
  | 
	2.50
  | 
	Rudder installation and  tavel set
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 12-02-2015
  | 
	1.00
  | 
	Additional views of control sticks, pushrods
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-01-2015
  | 
	6.00
  | 
	Finished vertical forward mount/ forward controls
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-30-2015
  | 
	3.00
  | 
	finished riveting elevator pushrods/bell crank
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 11-29-2015
  | 
	4.00
  | 
	Seperated control lever parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-28-2015
  | 
	5.50
  | 
	Set height for front vertical stabilizer. Drilled
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-26-2015
  | 
	3.50
  | 
	setup of vertical stabilizer
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-25-2015
  | 
	1.00
  | 
	Finished attaching horizontal to aft deck
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 11-19-2015
  | 
	3.00
  | 
	Leveled fuselage, prepped for empennage install
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-18-2015
  | 
	3.00
  | 
	Installation of remaining forward nut plates
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-16-2015
  | 
	4.00
  | 
	Rear baggage shelf, forward bulkhead parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-15-2015
  | 
	5.00
  | 
	Throttle cable ahchor/ front bulkhead covers
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-12-2015
  | 
	4.00
  | 
	Mounting bracket for Andair Fuel Valve
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-09-2015
  | 
	4.00
  | 
	Made troughs for alumi-prep/alodine
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-08-2015
  | 
	3.50
  | 
	Stiffiners to flooring/ floor panels to fuselage
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-07-2015
  | 
	3.00
  | 
	Front, rear seatback. Foot well final assembly
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-06-2015
  | 
	2.00
  | 
	Primed all seat back/floor parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-05-2015
  | 
	1.50
  | 
	Alumi-prep/alodine, seat/floor parts
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 11-04-2015
  | 
	2.00
  | 
	Scotch brite all seat parts an flooring parts
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 11-01-2015
  | 
	7.00
  | 
	Main floor stiffners/ foot well parts assembly
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-31-2015
  | 
	8.00
  | 
	floor parts installed temporarily
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-30-2015
  | 
	6.50
  | 
	Seperated front and rear seat back parts.
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-26-2015
  | 
	6.50
  | 
	Verifying quick build assembly from factory
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 10-24-2015
  | 
	1.00
  | 
	Fuselage rolled 180 degrees, shop setup for assem
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 10-23-2015
  | 
	3.50
  | 
	Checked off pic ticket for the fuselage
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 10-23-2015
  | 
	7.50
  | 
	Built mounting arms for engine stand to attach to
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-22-2015
  | 
	3.00
  | 
	Checked off pic ticked of wing kit
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 10-21-2015
  | 
	2.50
  | 
	Fuselage in shop
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-21-2015
  | 
	1.00
  | 
	Fuselage arrives.
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 10-16-2015
  | 
	4.50
  | 
	Added lights to shop/new roll around mobile cart
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 08-03-2015
  | 
	1.00
  | 
	Additional items along with purchase from Seattle.
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 08-01-2015
  | 
	1.00
  | 
	Found Quick Build Fuselage In Seattle.
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-02-2015
  | 
	3.50
  | 
	Installation of elevator trim tab servo
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 03-02-2015
  | 
	1.00
  | 
	Finished the empennage, wrapped with clear  plasti
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 03-01-2015
  | 
	6.00
  | 
	Temporarily installed both elevators on horizontal
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-28-2015
  | 
	2.50
  | 
	Rolling leading edge of right elevator
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-28-2015
  | 
	2.00
  | 
	Rolled edge of Left elevator leading edge
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-27-2015
  | 
	2.50
  | 
	Trim tab assembly and riveting
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-27-2015
  | 
	3.00
  | 
	Insallation of rear spar on Horizontal, with inbou
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-26-2015
  | 
	1.50
  | 
	Scuffed with scotch brite ready for pre treatment
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 02-26-2015
  | 
	6.00
  | 
	Attaching skin on Horizontal stabilizer
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-25-2015
  | 
	2.50
  | 
	Fit hinge to elevator trim tab, trim tab to elevat
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-24-2015
  | 
	2.50
  | 
	Finished riveting skin on Left elevator
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-23-2015
  | 
	3.50
  | 
	Left elevator assembled to frame
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-23-2015
  | 
	2.00
  | 
	Finished Main skin riveting right elevator
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-22-2015
  | 
	8.50
  | 
	Riveted Horizontal stabilizer frame with replaceme
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-22-2015
  | 
	3.50
  | 
	Right elevator frame/stiffiners on skin
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-22-2015
  | 
	1.50
  | 
	Attached skin to right elevator/ bent with 2 x 8 t
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-21-2015
  | 
	4.00
  | 
	Left Elevator frame with SB Parts
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 02-19-2015
  | 
	1.00
  | 
	Finished thru Primer elevator skins
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 02-17-2015
  | 
	4.50
  | 
	Alumi-prep, alodine, prime P60-G2
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-18-2015
  | 
	2.50
  | 
	Edge bending frame for trailing edges of elevators
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-11-2015
  | 
	2.50
  | 
	Elevator trim tab
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-10-2015
  | 
	6.50
  | 
	Left elevator trim tab assembly
  | 
	
			Details 
		 | 
	
			      
				  
		        | 
 
	
  | 
	
	
	 01-10-2015
  | 
	2.50
  | 
	Dissasembled Horizontal for replacement front spar
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-09-2015
  | 
	1.50
  | 
	left elevator counter weight assembly
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-05-2015
  | 
	1.50
  | 
	Deburred remaining  left elevator parts
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 01-04-2015
  | 
	5.50
  | 
	final prep elevators before alumi-prep thru primer
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 01-01-2015
  | 
	8.50
  | 
	Elevator parts before corrosion protection
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-30-2014
  | 
	5.00
  | 
	Temporarily assemblied elevator frames
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-13-2014
  | 
	6.50
  | 
	Skin to rudder
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-12-2014
  | 
	5.00
  | 
	Rudder frame assembly
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-11-2014
  | 
	6.00
  | 
	Rudder
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-10-2014
  | 
	10.00
  | 
	Rudder
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-09-2014
  | 
	7.00
  | 
	Assembly of verical stabilizer
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-08-2014
  | 
	8.00
  | 
	Back to vertical stabiizer
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-06-2014
  | 
	6.50
  | 
	Replacement parts an primer received
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-04-2014
  | 
	9.00
  | 
	horizontal stabilizer
  | 
	
			Details 
		 | 
	
	          | 
 
	
  | 
	
	
	 12-03-2014
  | 
	8.00
  | 
	continued with horizontal stab
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 12-01-2014
  | 
	8.50
  | 
	vertical stabalizer
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       | 
 
	
  | 
	
	
	 11-24-2014
  | 
	2.00
  | 
	Carpet an filler on work tables
  | 
	
			Details 
		 | 
	
			      
		         | 
 
	
  | 
	
	
	 11-23-2014
  | 
	4.00
  | 
	Work table
  | 
	
			Details 
		 | 
	
			      
				  
				 
		       |