KitLog pro

Powered By Kitlog Pro v2.0

Tims Web Site
' style=
Date:  2-11-2016
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Final drilling of grove gear legs

Finished drilling outboard bracket main 3/8" bolts. checked for alignment. All within 1/16". Drilled both inboard bracket 5/16" holes and reamed to final 5/16". Opened the outboard wear plate 1/4" access holes to 3/8". Drilled thru wear plates into and thru lower longeron. Match drilled the 1/4" inboard wear plate holes an reamed all 1/4" holes to final size. Removed Landing gear, Marked location of brackets to Right and Left gear legs an stored away in original shipping crate. Will be awhile before ready to final install gear.
' style=

both brackets drilled

both brackets drilled

' style=

seting up to drill 1/4

seting up to drill 1/4" holes

' style=

All gear bracket holes drilled

All gear bracket holes drilled

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.