KitLog pro

Powered By Kitlog Pro v2.0

Tims Web Site
' style=
Date:  2-10-2016
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Final check gear measurements/ Drilled one side

Final check on gear measurements. Drilled first outboard forward gear attachment 3/8" hole. Reamed to final size. Dropped a 3/8" bolt in the hole and took a new measurement from the string. Measurement stayed the same. Procedded on and drilled the aft 3/8" hole. Got a late start, plus getting over the knee surgery is still in play. At this time, all I can master is about 3.5 to 4 hours before I have to take a break or just quit for the day.
' style=

Final measurement check

Final measurement check

' style=

Location of aluminum yard sticks

Location of aluminum yard sticks

' style=

Drilled first forward 3/8 hole

Drilled first forward 3/8 hole

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.