Brief Description: Final check gear measurements/ Drilled one side
Final check on gear measurements. Drilled first outboard forward gear attachment 3/8" hole. Reamed to final size. Dropped a 3/8" bolt in the hole and took a new measurement from the string. Measurement stayed the same. Procedded on and drilled the aft 3/8" hole. Got a late start, plus getting over the knee surgery is still in play. At this time, all I can master is about 3.5 to 4 hours before I have to take a break or just quit for the day.