KitLog pro

Powered By Kitlog Pro v2.0

Tims Web Site
' style=
Date:  12-14-2015
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Disassembly of interior parts to allow for paint

I have gotten to a point where it is time to prep the interior for paint, or to roll the fuselage and start the installation of the Grove landing gear.
I removed all flooring/pedals/controls/and pushrods from the interior. I then removed the total empennage an stored away. Rolled the fuselage for the next step. (LANDING GEAR). Stay tuned, as it will be awhile before I can get back to the build. I have Knee Surgery scheduled 12/17/2015. Have no idea as to how long for recovery, since it is both knees.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.