Brief Description: Placed moving blankets inside the floor area to be
I installed the turtle deck with clecoes getting ready for the final installation of the riveting process. This will be a two person process. I have a friend that is building an RV4, planning on helping with this process. Since I could only cleco on the top skin, I decided then to install for the, I hope, last time, the rear throttle quadrant. I got out all the throttle quadrant parts and reassembled and installed into the final resting place.
checking for accessability of how far back the rivets can be reached from the inside.