KitLog pro

Powered By Kitlog Pro v2.0

Tims Web Site
' style=
Date:  6-3-2016
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Temporarily installed the rear turtle deck

Temporarily installed the turtle deck to check the clearance of the brackets. I then removed after inspection, as to allow for the installation of the rudder cables. At the location of the battery shelf that I had modified, I didn't want the possibility of the rudder cables rubbing against the bottom of the battery tray. I Unrouted the rudder cables and insalled vinyl tubing over the cables, just as supplied by vans at the foot well location for the same purpose, to avoid contact with the metal footwells. I attached the same way. Cut a small slot at the aft end of the installed tuybing and used tie wraps to attach to rear most smap bushing. this way , if the rudder cables do make contact with the battery modified shelf, it will be protected by the vinyl tubing. Now, wiring and cables are installed in the fuselage, time to reinstall the trutle deck and rivet on.
' style=

View of magnatometer an elt antenna

View of magnatometer an elt antenna

' style=

Turtle deck attached and drilled for the almost last time

Turtle deck attached and drilled for the almost last time

' style=

placed the wood flooring boards in the rear after installation of the rudder cables

placed the wood flooring boards in the rear after installation of the rudder cables

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.