N144GP Lancair Super ES
Work Logs Found: 1812
Category Work Time: 3847 Hours
 Date
Hours
Work Log Summary

Details

 12-07-2020
1.30
Flight test and in air calibration
Details
     

 11-23-2020
3.50
final ground check out and re-install interior etc
Details
       

 11-21-2020
2.25
continue ground testing - no pics
Details

 11-19-2020
4.00
fix pin 45; install PFD; begin set up
Details
       

 11-16-2020
2.00
Most instruments back in; tidy up
Details
       

 11-12-2020
2.75
make trim wire connectors to pitch servo; tidy up
Details
       

 11-12-2020
1.25
Can Bus Hi/Lo to P4X02 on PFD
Details
       

 11-09-2020
1.50
trace elev trim cable, open up at pitch servo
       

 11-09-2020
0.25
think through splicing can bus wires in
Details
       

 11-09-2020
1.75
the big cut
Details
       

 11-09-2020
0.75
splice into elev trim cable; run to pitch servo
Details
       

 11-09-2020
1.75
mount rack; drill new hole for clip nutplate, Tig
Details
       

 11-09-2020
1.00

Details
       

 10-27-2020
4.25
Run new harnesses; install servos
       

 10-27-2020
2.00
pull old wiring and servos
       

 10-27-2020
1.50
fool w fit; remove autotrim
Details
       

 10-27-2020
2.00
connect power, AP disc and ground wires
Details
       

 10-19-2020
1.25
remove old TT Sorcerer AP
Details
       

 12-09-2019
0.00
split cowling install cont'd
       

 12-09-2019
1.00
install new split cowling
Details
       

 12-09-2019
0.50
finish up split cowl install
       

 12-08-2019
0.50
fill pinholes and prime
Details
       

 12-04-2019
0.00
begin lower cowling nose repair 4
       

 12-04-2019
0.00
begin lower cowling nose repair 3
       

 12-04-2019
0.00
begin lower cowling nose repair 2
Details
       

 12-04-2019
2.00
begin lower cowling nose repair 1
Details
       

 11-24-2019
1.50
cowl split mod - split and install receptacles
       

 11-24-2019
0.00
cowl split
       

 11-18-2019
2.50
split bottom cowl mod
Details
       

 11-18-2019
0.00
cowl mod layup
Details
       

 07-08-2019
1.00
try alternate strut ball placement
Details
       

 07-08-2019
1.00
re-install baggae door
Details
       

 07-06-2019
2.00
flox in bracket; add 2 BID
Details
       

 07-06-2019
2.00
fab strut attach bracket
Details
       

 06-27-2019
1.25
plan placement' drill hinge for stud; fab phenolic
Details

 06-26-2019
0.00
Order parts for baggage door strut mod
Details

 02-23-2019
2.00
AOA calibration & 4 way TAS calculation
Details
       

 08-11-2018
2.50
SB install switch, test, finalize
Details
       

 08-06-2018
1.00
SB J1 control cable wiring
Details
       

 08-06-2018
2.00
SB install 3A breaker; run ground wire
Details
       

 08-06-2018
0.75
SB couldn't access ground lug properly; butt splic
     

 08-06-2018
1.00
SB bundle up wires; reinstall some of interior
Details
       

 08-06-2018
0.75
SB drill holes in panel for switch and LED
Details
       

 08-02-2018
2.25
SB; work on wiring
Details
       

 08-02-2018
1.00
SB; did final install of SB units in wing pockets
Details
       

 07-30-2018
0.50
SB; mount ALC unit
     

 07-30-2018
1.00
SB; make CPC connections at both wing pockets
       

 07-30-2018
1.50
SB; J1 CPC connector at ALC
Details
       

 07-30-2018
1.50
SB; CPC connectors under front seat at ALC
Details
       

 07-30-2018
0.00
SB cable routing on R side
Details
       

 07-30-2018
0.00
SB cable routing L side
Details
       

 07-29-2018
2.25
speed brakes - pull L and R wing wires
Details
       

 07-29-2018
0.50
flox pad for ALC unit in- SB
Details
       

 07-21-2018
1.25
move fuel line adel clamps
Details
       

 07-21-2018
1.25
locate and drill drain holes
       

 07-21-2018
1.25
flox in 8-32 screws for ALC mounting pad
Details
       

 07-21-2018
1.25
ALC mounting location
Details
       

 07-16-2018
0.00
speed brake install planning
       

 07-16-2018
1.75
Beg planning/work on speed brakes
Details
       

 07-03-2018
3.00
adj K factor; adj elev trim indic.; rewire elev tr
Details
       

 06-24-2018
0.00
Fully clean ADSB report - PASS
Details

 04-30-2018
0.50
adj AP VRT and pitch trim speed
Details
       

 04-25-2018
0.00
ADSB pass e-mail
Details
     

 04-23-2018
1.50
replace front door spindle & adjust latches
       

 04-23-2018
0.20
K factor adjustment #1
Details
     

 04-11-2018
1.50
attempt to repair spindle in door handle
Details
       

 04-07-2018
1.00
update GNS 530W with correct, current SW
Details
       

 04-07-2018
1.00
install LED status light for TT autotrim; and cali
Details
       

 04-02-2018
0.50
switch wires for Dynon power in....now +5v as it s

 04-02-2018
0.00
install new GPS ground plane
Details
       

 04-02-2018
1.00
get SW version; T Jason no pics...some on phone
Details

 04-02-2018
2.50
fab, fit and install ground plane for GDU 460 and
Details
       

 03-05-2018
2.00
xponder antenna cont'd
       

 03-05-2018
2.00
testing ADSB-530W communication per Garmin
Details
       

 03-05-2018
2.00
Dynon D1 power supply
Details
       

 03-05-2018
2.00
change out transponder antenna
Details
       

 03-05-2018
2.00
AP autotrim trim
Details
       

 12-24-2017
2.50
static ins and outs
Details

 12-23-2017
5.00
pitot-static all good; ARINC 429 good
Details
       

 12-18-2017
3.00
more pitot troubleshooting
Details
       

 12-16-2017
3.00
more troubleshooting ADSB and pitot issues
Details

 12-12-2017
3.00
more TX troubleshooting
Details

 12-11-2017
3.00
more troubleshooting
Details
       

 12-11-2017
0.00
door seal pump; pitot-static test tool
       

 11-29-2017
2.00
T Jason troubleshooting issues
Details
       

 11-29-2017
1.00
redo pitot and AOA fittings at wing tip
Details
       

 11-29-2017
1.00
Adjust prop govenor to stop; was only getting ~250
       

 11-19-2017
7.00
1st flight; troubleshoot squawks
Details
       

 10-19-2017
3.00
fix tach sensor wiring; clear up remaining open it
Details

 10-15-2017
2.25
rewire RPM and FF
Details
       

 10-15-2017
6.00
many Misc items
Details
       

 10-09-2017
3.00
pull R mag; install Garmin RPM sensor
Details
       

 10-09-2017
2.25
Misc. finalizing items
Details
       

 10-09-2017
2.50
misc cont'd
Details
       

 10-03-2017
4.00
pitot-static-xponder cert test
Details
     

 10-02-2017
5.75
engine start; magnetometer cal., misc
Details
       

 09-25-2017
0.50
partial fix of mount rub
Details
       

 09-25-2017
2.00
mag interference test; calibrate fuel tanks
Details
       

 09-25-2017
2.50
fix P8 flap control; ELT
Details

 09-23-2017
1.50
wire up ELT connection; help hangar neighbor with
Details
       

 09-23-2017
0.50
Batts (2014) A=27.3v, B (2012) =26.2 volts
Details
       

 09-16-2017
1.50
Study P-8 wires CP stick; rewire pitot; zip ties
Details
       

 09-16-2017
1.50
secure all wires mid and aft.
       

 09-11-2017
1.75
troubleshoot co-pilot stick grip issues
Details
       

 09-11-2017
1.25
pitot and ELT
Details
       

 09-11-2017
1.25
load Sorcerer settings; more pitot fooling
Details
       

 09-11-2017
3.00
cont. check out of G3 install
Details

 09-09-2017
3.25
W&B; connect batteries
Details
       

 09-09-2017
1.50
Power up
Details
       

 09-04-2017
3.75
vent hose, adels, shunt, cb cover
Details
       

 09-04-2017
2.00
G3X screens & radios back in. MILESTONE!
Details
     

 09-04-2017
1.50
CB plate; pitot-aoa-static lines
Details
       

 09-04-2017
1.25
adels behind panel; GPS & XM antennae
       

 08-31-2017
0.00
pics 3
Details
       

 08-31-2017
0.00
pics 2
Details
       

 08-31-2017
3.75
numerous small items
Details
       

 08-31-2017
0.00
firewall schematic drawing-behind panel connection
Details

 08-31-2017
0.00
add 1A fuse to shunt leads
Details
       

 08-17-2017
1.00
work on co-pilot vent hose
Details
       

 08-17-2017
1.00
move ground block to a different, more accessible
Details
       

 08-17-2017
0.00
L side so far
       

 08-17-2017
1.00
Attempt to make main power connection
Details
       

 08-15-2017
2.75
pull GMU 22 cable-run opposite direction, repin
Details

 08-14-2017
3.00
Relocate dimmer; pilot side rails; route and conne
Details

 08-13-2017
1.00
hang panel; install GPS/XM ant.shelf; CR2 batt to
Details
       

 08-13-2017
5.25
begin reconnecting everything
Details
       

 08-13-2017
0.00
additional pics
Details
       

 08-07-2017
1.00
sort & secure wires on panel; clean front window

 08-07-2017
0.00
part 2
Details
       

 08-07-2017
6.00
many final small tasks before hanging panel back o
Details
       

 08-07-2017
0.50
make rough schematic of what needs to be connector
Details
     

 08-03-2017
2.00
ring out P-2,3; ground block strap, main buss term
       

 08-03-2017
2.00
figure GPS & XM antennas; fab shelf, set 1st click
Details
       

 08-03-2017
0.00
figure ant. shelf; locate, set 1st click bond
Details
       

 08-03-2017
0.00
buss to CB
Details
     

 08-03-2017
2.50
adels, zip ties, RTV... tidy up wire runs
Details
       

 07-30-2017
1.00
wig-wag wiring to P-1, pin 14; pull some old VP wi
Details
       

 07-30-2017
0.00
P-13 plug end.
Details
     

 07-30-2017
2.00
P-1-0 fuel probes, ELT, VR #2 sense wires, door se
Details
     

 07-30-2017
2.25
GTX 345 cable and antenna cable
Details
       

 07-30-2017
0.50
clean up hangar a bit and blow out.

 07-29-2017
1.50
run GMU 22 magnetometer cable - left side
Details
       

 07-29-2017
1.50
re-install RAM air cable
Details
       

 07-29-2017
1.00
plan GTX wiring run; drill holes. No pics yet.
Details

 07-24-2017
0.50
re-install parking brake cable

 07-24-2017
1.25
re-install oil cooler, heat and defrost cables
Details
       

 07-24-2017
0.75
mount magnetometer shelf
Details
       

 07-24-2017
1.25
install power plug for Dynon D1
Details
       

 07-24-2017
1.50
hall effect sensor to Alt 2 B lead
Details
       

 07-24-2017
0.00
3 cables + parking in; just ram air left to do
     

 07-17-2017
0.40
voltage sense jumper VR1 to VR2
Details
       

 07-17-2017
2.25
final mounting of av fan, dimmer, and 12V converte
       

 07-17-2017
1.25
add alternate static valve and related plumbing
Details
       

 07-16-2017
1.75
replumb pitot-static AOA with SafeAir fittings
Details
       

 07-16-2017
0.50
add 2nd click bonds for avionics fan & dimmer
       

 07-02-2017
1.00
pull new 3C shielded wire in R wing for OAT
Details

 07-02-2017
0.75
place dimmer/fan/inverter; click bond 1
Details
       

 07-02-2017
0.75
misc shop

 07-02-2017
1.00
flox in GTX45R rack under R rear seat
Details
       

 07-02-2017
1.25
finish wiring all connectors for OAT tips & fusela

 07-02-2017
2.00
Figure out and Fab mounting brackets for GTX45R
       

 06-26-2017
2.00
wire VR1 and VR2, ammeter shunt
       

 06-26-2017
2.00
wire up molex for FF and RPM
     

 06-26-2017
1.50
wire up GTP 59 OAT
Details
       

 06-26-2017
1.75
ring out wig-wag wires and wire up tip ends of bot
Details
       

 06-26-2017
1.50
misc adels and zip ties; plan GTX45R mounting loca
Details

 06-26-2017
1.25
fool with turning mag to get new tach sensor on
Details
       

 06-26-2017
1.00
finish up pitot and AOA plumbing/wiring
       

 06-19-2017
2.50
wire up oil temp, fuel psi, oil psi, map, adels le
Details
       

 06-18-2017
5.75
wire up EGT and CHT; route
       

 06-18-2017
2.00
unpack & inventory panel box
       

 06-18-2017
2.00
sensor manifold
Details
       

 06-18-2017
0.00
sensor manifold
     

 05-25-2017
1.00
Oil temp sensor
Details
       

 05-25-2017
0.00
GMU 44 bracket final assembly
Details
       

 05-25-2017
3.00
finish GMU 22 bracket & platform
Details
       

 05-23-2017
2.50
work on GMU 22 magnetometer shelf
Details
       

 05-23-2017
1.00
ring out J243 tach wires
Details
     

 05-22-2017
3.25
Garmin GAP 26 pitot/AOA
Details
       

 05-21-2017
4.75
Begin G3X install
Details
       

 05-08-2017
2.50
install defroster; adels for wire run; ready for i
Details
       

 04-10-2017
4.50
add last click bond for defrost plenum; reroute &
Details

 04-03-2017
0.00
VR #2 cont'd
       

 04-03-2017
1.25
Voltage Reg #2; add SB1B-28, pull LS-1
Details
       

 04-03-2017
1.25
run AOA tubing; verify sync wires for Rec LIghts
Details
       

 04-03-2017
0.00
Rec Light wiring cont'd
       

 04-03-2017
1.00
defroster fit cont'd; add 3 more clic bonds

 12-30-2016
3.50
pull all control cables; ALT, OIL, HEAT, DEFROST,
Details

 12-24-2016
3.50
rang out 3 RG400 lines; run new wire, vac.
Details
       

 12-19-2016
0.00
weigh-in
Details
       

 12-19-2016
1.00
Pul old magnetometer and xponder cable; tidy up wi

 12-19-2016
1.00
plan out mag shelf extension; cut phenolic, drill
Details
       

 12-19-2016
0.00
panel ready for boxing up
       

 12-19-2016
3.00
finish boxing up panel for shipment
       

 12-12-2016
3.25
Continue cleaning up wires; remove rest of interio
Details

 11-30-2016
2.00
Pull remaining parts/wires; ready to pack up
Details
       

 11-14-2016
5.75
pull parts, seats & side panels out, panel out
Details
       

 11-08-2016
2.50
pull ARINC, EM wiring, Cables etc
Details

 11-07-2016
5.75
Pull AFS sensors and VP200 CU unit
Details

 10-31-2016
0.00
Pulling Day 1, part 3
       

 10-31-2016
6.75
Begin removal of original panel for Upgrade
Details
     

 10-31-2016
0.00
Begin pulling panel
Details
       

 08-04-2015
6.00
Cut foam and wrap armrests in leather
Details

 07-26-2015
3.00
make armrest templates & fab/micro pre-preg
Details
       

 06-11-2015
949.00
6 months in paint shop; final bodywork and paint
Details
       

 12-24-2014
6.00
cover interior panels
Details
       

 12-16-2013
3.50
swap COM1 and COM 2 antenna
Details

 12-16-2013
2.00
install air/oil separator
Details
       

 10-07-2013
1.00
add capacitor to try to quiet ALT noise
Details
       

 09-09-2013
3.25
prep and micro inside of fuselage
Details
       

 09-09-2013
0.25
clean up flox release at seat pans
       

 05-28-2013
3.00
Dynamic prop balance
Details
     

 03-18-2013
3.50
rehang door and adjust pump
       

 03-18-2013
0.00
mess with door seal pump; adjust, troubleshoot
Details
       

 03-17-2013
0.00
turn 1/2 turn CCW
Details
     

 03-17-2013
4.00
pull door; prep to install door seal
       

 03-17-2013
0.00
modify caulk gun to apply silicone
Details
       

 03-17-2013
2.50
Install door seal with silicone adhesive
Details
       

 03-17-2013
0.00
door seal install continued
       

 02-11-2013
0.00
spinner gap after shimming mount out with 1 flat w
       

 02-11-2013
0.00
Offending Airwolf parts that caused engine failur
       

 02-11-2013
3.25
finish punch list to restart Phase 1 test flying
Details

 02-11-2013
1.00
check brake fluid level - top off
Details
       

 02-11-2013
1.00
add spacer to see if shake goes away
Details
       

 02-10-2013
1.00
test circuits over Carlisle Airport, N94
Details
       

 02-10-2013
1.00
reconnect fuel drain hose...what a bear.
Details
       

 02-10-2013
1.00
ground run and start test flight over N94 airport
       

 02-10-2013
1.00
Back home at Capital City, KCXY
       

 02-09-2013
4.25
safety baffle, mount prop, torque, safety, spinner
Details
       

 02-09-2013
4.25
ready for ground run tomorrow
       

 02-04-2013
5.00
exhaust, cht, egt, wiring Day 3
Details
       

 02-04-2013
4.75
baffling Day 3
       

 02-03-2013
3.50
results of today's engine work - day 2
       

 02-03-2013
4.00
continue hanging engine - reconnect things
Details
       

 02-02-2013
4.00
Receive & rehang rebuit engine
Details
       

 02-02-2013
4.00
continue engine re-install
Details
       

 10-27-2012
2.50
belly antenna; replace B battery
Details
       

 10-20-2012
5.25
cowl, aileron hinges, B battery
Details

 10-17-2012
0.00
fair in cowling front edge; reattach spinner backi
Details
       

 10-17-2012
0.00
cowl inlet measurements
       

 10-17-2012
4.00
continue work on cowl inlets
Details
       

 10-14-2012
4.50
ground plane strips to belly; continue cowl inlet

 10-08-2012
4.00
sand & shape cowl inlets; coat #2 of Super-fill
Details
       

 09-23-2012
2.00
prep and add super-fill antenna ground plane
Details
     

 09-23-2012
2.50
bodywork cowl inlets
Details
       

 09-17-2012
4.25
modify cowl inlets
Details
       

 09-17-2012
3.75
1 BID to COM belly antenna copper strips
Details
       

 09-05-2012
2.00
3 BID to opposite cowl inlet halves
       

 09-03-2012
2.00
3 BID to half of cowling inlets
Details
       

 08-27-2012
3.00
WLS primer to rest of parts/fuselage
Details
       

 08-27-2012
5.75
WLS primer to interior
Details
       

 08-27-2012
0.75
pull back plate off prior to prop flush
Details
       

 08-27-2012
2.25
begin work to modify cowl inlets
Details
       

 08-20-2012
4.00
work on adding COM 2 to belly & misc.
Details
       

 08-20-2012
3.00
mount bolts. trim door flange, skybolt 4 nose gear
Details
       

 08-06-2012
6.00
work on plane while engine is rebuilt
Details
       

 07-30-2012
6.50
crate up engine to ship back to Barrett
Details
       

 07-29-2012
11.00
pull engine at N94...to KCXY to crate
       

 07-25-2012
1.29
Flight #10, engine failure, emergency landing
Details
       

 07-16-2012
5.50
Flt test #9 and squawks - flt = 2.57 hours T=12.76
Details
       

 07-09-2012
2.50
Misc. squawks
Details
       

 07-04-2012
5.00
Flt #8 and clear squawks; misc. maintenance
Details

 07-02-2012
2.75
Flight test #7
Details

 07-02-2012
5.00
clear squawks for flight 7 & misc
       

 06-18-2012
1.75
replace static line; work on MG wheel pants covers
Details
       

 06-18-2012
3.00
Misc avionics settings & troubleshooting
Details

 06-17-2012
4.00
test flight #6 and fix squawks
Details
       

 06-17-2012
2.25
misc. - try new cover - recowl
Details
       

 06-04-2012
2.50
troubleshoot XM WX not working
Details
       

 06-04-2012
0.75
re-rig left aileron
Details
       

 06-04-2012
0.25
dampener hose to oil filter
Details
       

 06-04-2012
0.25
booger end of threads in ram air to prevent? nuts
       

 06-04-2012
1.00
AP settings, test AP on ground, turn target ON
Details
       

 06-03-2012
1.00
aileron trim modification
Details
       

 06-03-2012
3.75
#5 long run AOO-PSB-SEG-KCXY; debrief run
Details
       

 05-24-2012
2.00
try to get XM wx to work; install LED noselight
Details
       

 05-21-2012
0.25
trim exhaust pipes to natural body line
Details
       

 05-21-2012
0.25
sand lower cowl flange from spinner rub
     

 05-21-2012
0.75
install bracket for taxi light
       

 05-21-2012
0.75
gascolator
       

 05-21-2012
1.50
fab shim washers for engine mount
Details
       

 05-21-2012
1.25
cowlings back on and misc.

 05-21-2012
1.00
attempt XM weather activation
Details
       

 05-21-2012
1.25
activate XM weather
Details
       

 05-20-2012
1.50
troubleshoot oil leak
Details
       

 05-20-2012
2.00
repair stripped screw and mount nav/strobe lights
Details
       

 05-20-2012
1.50
misc.
Details

 05-20-2012
1.50
Flt #4....returned to CXY with OVERVOLTAGE alarrm
Details
       

 05-20-2012
0.50
add temp. weatherstrip to front door
Details
       

 05-14-2012
6.25
wing tip lights
Details
       

 05-14-2012
2.50
troubleshoot and resolve alternator issues
Details
       

 05-13-2012
5.50
Test flight #3 and clear squawks - no pics
Details

 05-12-2012
5.75
GP first flight; clear squawks
Details
       

 05-09-2012
1.50
wire up Sunray Plus LED wing tip lights
Details
       

 05-09-2012
1.00
seats and interior panels back in
Details
     

 05-07-2012
1.50
WLS to floor, flaps and nose fairing
Details
       

 05-07-2012
0.25
update AFS 3500 to v 8.6.22
Details
       

 05-07-2012
0.25
set up VP for wig wag of recog lights and taxi lig
Details
       

 05-07-2012
4.25
pull wires for recognition wing tip lights
Details
       

 05-07-2012
2.00
make pattern for R side light bulkhead
Details
       

 04-22-2012
2.00
grease hub with AS 5
Details

 04-19-2012
2.00
prep for 1st solo flight - NOGO
Details
       

 04-17-2012
1.25
install nose fairing and cowling
Details
       

 04-17-2012
0.75
fool with AFS tanks, and VP device settings
Details
       

 04-16-2012
1.00
micro upper fuselage joggles - both sides
Details
       

 04-16-2012
2.50
install wheel pants to main gear
Details
       

 04-16-2012
1.75
install nose pant
Details
       

 04-16-2012
0.75
grease prop hub with AS 5; spinner back on

 04-16-2012
2.50
correct items from inspection & test flight
Details
       

 04-15-2012
0.00
The characters
Details
       

 04-15-2012
6.00
FIRST FLIGHT
Details
       

 04-14-2012
4.75
get ready for test flight tomorrow
Details
       

 04-02-2012
1.75
sand lower cowl; 3 BID thin spot
Details

 04-02-2012
1.75
modify nose strut fairing
Details
       

 04-02-2012
1.75
add'l nose fairing; re-install seats & panels; RTV
Details
       

 04-01-2012
2.50
update checklist; begin editing AFS checklist file

 03-31-2012
2.00
seats & panels out; misc. fine tune items
Details
       

 03-31-2012
1.25
core out aft panel; flox to lower panel flange
Details
       

 03-26-2012
0.75
re-charge nose strut
Details

 03-26-2012
1.00
misc. shop and sort cup full of misc hardware back

 03-26-2012
1.25
install clips to hold tow bar
Details
       

 03-26-2012
1.25
AFS W&B and Maint. schedule files
Details

 03-26-2012
1.75
AFS & VP alarms; reset guage ranges for Fuel PSI a
Details
       

 03-25-2012
1.00
test parking brake; engine run
Details

 03-25-2012
1.50
pitot reconnected
Details
     

 03-25-2012
0.00
COWLING INSTALL PROCEDURE
Details

 03-25-2012
2.00
cowling back on; check gap; record install procedu
Details
       

 03-24-2012
1.50
trouble shoot pitot line issue
Details
       

 03-24-2012
0.75
AFS system updates and backup settings to SD & com
Details

 03-24-2012
3.00
.DAR visit & inspection
Details
       

 03-23-2012
4.25
pitot-static-encoder-altimeter test
Details
       

 03-19-2012
1.00
work on AFS W&B, and Haubert with pitot/static
Details

 03-19-2012
1.00
wipe down entire plane and clean up - prep for DAR

 03-19-2012
2.50
re-install parking brake and re-bleed system
       

 03-19-2012
0.25
install SS tie down rings...nice!
Details
       

 03-19-2012
1.50
blow off aircraft; WLS primer to flaps/ailerons/ti
Details
       

 03-19-2012
2.25
AFS map & sys cards; study HS vent holes
Details

 03-19-2012
1.00

Details
       

 03-12-2012
3.75
Weight and Balance day
Details
       

 03-12-2012
2.25
various small tasks for rest of a beautiful day
Details
       

 03-12-2012
0.00
add'l w&b pics
       

 03-11-2012
1.25
VP set up and misc
Details

 03-11-2012
0.25
tape bottom wing fairing; check engine bolts
Details

 03-11-2012
0.00
placard door seal switch
Details
     

 03-11-2012
3.25
drain fuel, paint/install glareshield
Details

 03-11-2012
1.25
cowling on, wheel pants in position
Details
       

 03-03-2012
5.25
misc. tasks; condition inspection
Details

 02-25-2012
0.50
VP engine gauge settings to match AFS settings
Details

 02-25-2012
1.00
Rosen visors in and misc shop
Details
       

 02-25-2012
0.50
note some epoxy "melting"
Details
       

 02-25-2012
0.50
mount registration card; compass card
       

 02-25-2012
1.00
mark lower cowling rub; check engine bolts
Details
       

 02-25-2012
0.50
installed 3 tie down rings
     

 02-25-2012
0.50
install step
Details
       

 02-25-2012
0.75
grind & sand lower cowling for spinner rub
       

 02-25-2012
0.50
clean windows with Sumner 210 from ACS
Details

 02-25-2012
0.75
access panels on
Details
       

 02-25-2012
0.00
3 view pics for DAR inspection
       

 02-24-2012
1.50
prep and mail paperwork to Ron Jones, DAR
Details

 02-21-2012
1.50
document AD compliance for 8130-6 form
Details
       

 02-20-2012
2.75
run engine and misc.
Details
     

 02-20-2012
0.75
rear seats in; velcro'd; and clean up hangar
       

 02-20-2012
1.75
modify fuel tunnel
       

 02-20-2012
2.00
modify and redo/install seats and forward interior
Details
     

 02-20-2012
0.25
leading edge tape to wing root gap
Details
       

 02-13-2012
0.75
review staged parts; clean up; clean tape off of s

 02-13-2012
0.00
INTERIOR PANEL INSTALL ORDER
Details

 02-13-2012
1.75
interior close-outs; seat belts; seats in
       

 02-13-2012
1.75
add'l interior close-outs
       

 02-13-2012
1.75
add'l interior close-outs
       

 02-13-2012
1.75
add'l interior close-outs
       

 02-12-2012
0.75
VP FOB, backup; AFS oil temp and rpm bug

 02-12-2012
1.25
start installing all panels for inspection
       

 02-12-2012
0.75
sand, prep & prime delrin door guide area
       

 02-12-2012
0.25
add a washer to each aft bolt in nose strut, -5s
Details
     

 02-11-2012
0.75
VP device settings
Details

 02-11-2012
0.75
sand s/f on flaps; still have a few pinholes
     

 02-11-2012
0.75
prep, mask & paint nose strut
Details
       

 02-11-2012
2.50
fit & trim left side interior panels
Details
       

 02-11-2012
0.50


 01-30-2012
0.25
velcro door strap & registration packet
Details
       

 01-30-2012
0.25
temporarily placard AOA, static, oil capacity
       

 01-30-2012
0.75
talk to John Reider & reinstall wing tip lights

 01-30-2012
1.00
safety rudder turnbuckles
Details

 01-30-2012
0.50
pressurize nose strut; ~300#...1.5" extension
Details

 01-30-2012
2.75
install front lap & shoulder belts; clean door han
       

 01-30-2012
0.00
ELT info for file
Details
       

 01-30-2012
1.50
adj door pin, prep and flox in
       

 01-30-2012
0.00
add'l seat belt installation pics
       

 01-29-2012
1.00
true up aft end of top cowl;reinstall cowlings
       

 01-29-2012
0.50
temp. bolt L front seat in

 01-29-2012
0.75
run engine and misc clean up
Details

 01-29-2012
2.00
reinstall ELT and test
Details
       

 01-29-2012
1.00
loctite all jam nuts within fuselage
Details

 01-29-2012
0.75
install spinner
       

 01-28-2012
1.25
troubleshoot/remedy L fuel probe not reading
Details

 01-28-2012
1.00
troubleshoot OAT; rewire molex in wing tip
Details

 01-28-2012
1.00
re-install ADI after warranty work by TruTrak; rec

 01-28-2012
1.50
finish up Reiff preheater system install
Details
       

 01-28-2012
0.75
finish installing overhead console with SS cap scr

 01-28-2012
3.25
bond preheat to oil pan; safety cylinder bands
Details
       

 01-23-2012
2.25
continue fuel tank calibration
Details
       

 01-22-2012
3.75
Reiff preheat system
       

 01-22-2012
1.25
calibrate R fuel tank
Details
       

 01-21-2012
2.00
work on Reiff preheat cylinder bands
       

 01-21-2012
1.00
pull tip lighst for painting; record prop info
Details
       

 12-26-2011
4.00
fix pitch servo wiring; test brakes & misc
Details
       

 12-24-2011
0.50
use old Maggie leash for door pull down strap
Details
       

 12-24-2011
0.25
Measure oil pan for heater
Details
       

 12-24-2011
4.25
level and micro bubble level in; drain fuel; measu
Details
       

 12-24-2011
0.00
add'l pics...bubble level micro'd in; nose strut
       

 12-24-2011
0.50
add fuel placards; add "EXPERIMENTAL" to door
Details
       

 12-19-2011
0.00
prep and WLS primer to MG paant access panel
Details
     

 12-19-2011
3.25
prep & prime cowling and wheel pants
Details
       

 12-18-2011
3.00
remove forms, sand, apply s/f #2
       

 12-18-2011
0.25
paint o/h console and screws....blue; close match
Details
       

 12-18-2011
1.50
back to hangar..work on set-ups and trim problem
Details

 12-17-2011
1.50
run engine; inadvertant taxi!!!
Details

 12-17-2011
3.00
grind/sand lower cowling flange
       

 12-17-2011
0.25
epoxy to top of aft seat parts
Details
     

 12-17-2011
0.00
build forms for bodywork to top cowling
       

 12-12-2011
1.00
troubleshoot ADI
Details
       

 12-12-2011
0.50
test ELT voltage; only .61 volts
Details
       

 12-12-2011
2.00
research ELT and trim issues

 12-12-2011
2.25
AFS setup; trim troubleshoot; pics of VP & AFS set
Details

 12-11-2011
3.75
solve magnetometer wiring issue; calibrate magneto
Details
       

 12-11-2011
1.00
set up VP switches; reload s/w export and import
Details

 12-11-2011
0.25
reverse door strut again
Details
     

 12-11-2011
0.50
plan map light switch and drill hole in OH console
       

 12-11-2011
0.25
attempt ELT test at top of the hour - no go

 12-05-2011
0.75
work on VP set-up
Details
       

 12-05-2011
0.25
work on door strut
Details
     

 12-05-2011
1.00
work on AFS set-up
Details

 12-05-2011
0.50
start OH console panels; drill
       

 12-05-2011
0.75
run engine with cowling on; temps good

 12-05-2011
0.00
right side top cowl pics
Details
       

 12-05-2011
1.25
pull ELT door; work on adding 2nd map light circui
Details

 12-05-2011
2.25
more map light work
Details

 12-05-2011
2.00
fit, trim & mark top cowling > adding new flange;
       

 12-05-2011
1.00
attach eyeball vents to OH console panels
       

 12-05-2011
1.25
adels to brake line & install left armrest
       

 11-30-2011
0.50
micro flange... low spots and weave
     

 11-30-2011
1.50
micro armrest edges and hard points
     

 11-30-2011
2.00
2 BID to top cowling foam
       

 11-26-2011
0.50
trim front door jamb
Details
       

 11-26-2011
2.50
replace strut; remove parking brake and re-bleed;
Details
       

 11-26-2011
0.00
foam applied for cowl flange rebuild
     

 11-26-2011
1.50
fit and trim top cowl; super glaue foam on for lay
Details
       

 11-13-2011
1.75
trim top cowl; cut flange off
Details
       

 11-13-2011
2.75
fit cowlng, trim seals, mark for cowl adjustment
Details
       

 11-07-2011
1.25
super-fill R wing tip gap; s/f pinholes in flap bo
       

 11-07-2011
1.25
install speed brake covers
Details
       

 11-07-2011
0.50
finish up R wing tip & misc shop
     

 11-07-2011
2.50
fabricate left armrest
Details
       

 11-07-2011
2.25
apply N numbers
Details
       

 10-31-2011
1.50
trim engine hoses; plan L armrest
Details

 10-31-2011
1.75
replace R strobe; install wing tips
Details
     

 10-31-2011
1.25
re-safety prop and engine mount bolts
Details

 10-31-2011
1.75
pull outside; sand flaps....looking good
Details
       

 10-31-2011
1.00
install baggage door bolts and seal
       

 10-31-2011
0.50
begin install of lower cowling
Details
       

 10-31-2011
0.00
baffling trimming needed
Details
 

 10-24-2011
1.50
Super-fill pass #4 to both flaps - inboard side
Details

 10-24-2011
1.50
misc tasks to finish up day
Details

 10-24-2011
1.00
install front door lock and door access cover
Details

 10-24-2011
0.50
install 14oz Halon fire extinguisher under and fro
       

 10-18-2011
6.50
prep for and start engine
Details
     

 10-17-2011
1.25
work off Duncan's squawks
Details

 10-17-2011
0.50
scrape foam blobs off all surfaces...ready to sand

 10-17-2011
0.75
2nd pass super-fill to flaps
       

 10-16-2011
4.50
finish bleeding brakes
Details

 10-16-2011
2.50
body work root of flaps at wing fairing
Details
       

 10-03-2011
1.50
trim flaps; finish hardware; position sensor; VP s
Details
       

 10-03-2011
1.51
EFIS mount; glareshield; defroster
Details

 10-03-2011
3.25
attempt to bleed brakes
Details

 10-03-2011
1.50
Add'l flap work
Details
       

 10-02-2011
1.25
rig left aileron
Details
       

 10-02-2011
1.25
rig ailerons - right side
Details
       

 10-02-2011
2.50
modify flap push rods and rig
Details
       

 10-02-2011
2.50
flap rods and rigging
Details
       

 09-21-2011
0.50
tighten and torque aileron and flaps bolts

 09-21-2011
2.50
Plan B for defroster & glare shield
Details
       

 09-21-2011
0.75
more flap rigging
Details
       

 09-21-2011
0.75
misc shop and try to clean foam mess: no joy

 09-21-2011
0.75
flap rods and flap rigging
       

 09-17-2011
3.50
work on aileron tubes and rigging
Details
       

 09-17-2011
2.75
hang flaps and begin rigging
Details
       

 09-17-2011
0.00
alieron over-length
       

 09-11-2011
2.00
ailerons
Details

 09-05-2011
2.50
re-install RS fuel quick drain
Details

 09-05-2011
0.75
install aft seats belts
Details
       

 09-05-2011
0.50
aileron controls; right side
       

 09-05-2011
0.50
2 BID to 2nd side of nose pant

 09-04-2011
1.50
slosh wings
Details
       

 09-04-2011
3.00
hang right wing
Details
       

 09-04-2011
0.00
final wing hanging pics
Details
       

 09-04-2011
0.00
add'l wing hanging pics
       

 09-04-2011
13.50
add'l pics
Details
       

 09-03-2011
4.75
get ready for wings; 2 BID nose pant
Details
       

 08-29-2011
0.50
run spark plug wires RS
       

 08-29-2011
0.25
pull out defroster; sand prep for flox in

 08-29-2011
0.75
prep & epoxy front floor boards

 08-29-2011
0.50
LS spark plug wires
       

 08-29-2011
2.00
flox washers into nose pant
Details
     

 08-28-2011
0.75
work on nose gear repair
Details
       

 08-28-2011
1.50
prep and epoxy prepreg areas
Details
       

 08-28-2011
0.50
PLUG VACUUM HOLE COOLING HOLE
Details
       

 08-28-2011
2.00
fool with defroster install...tight

 08-28-2011
0.25
add silicone spacer to oil filter
Details
     

 08-28-2011
1.00
add conduit tubing to batt leads; attach covers
       

 08-27-2011
0.50
thread rudder stop bolt; fool with GPS
Details
     

 08-27-2011
0.50
installed SS tie straps in place of safety wire
Details

 08-27-2011
1.50
install 72" prop cable and secure
       

 08-27-2011
0.00
GPS' acquired today; tested radios too
Details
       

 08-27-2011
0.50
assembled and test AeroKart tug
Details
     

 08-27-2011
0.00
add'l prop cable pics
       

 08-27-2011
1.50

Details
       

 08-15-2011
0.50
torque main legs and safety wire
Details
       

 08-15-2011
0.75
start elev trim tab/servo install
Details

 08-15-2011
0.50
safety prop and baffle shroud bolts
       

 08-15-2011
1.75
route charger wires to baggage area
       

 08-15-2011
1.00
prep and epoxy top cowling
Details
       

 08-15-2011
1.50
prep and epoxy inside of lower cowling
Details
     

 08-15-2011
0.50
change descicant plugs; sweep hangar

 08-14-2011
1.25
re-install prop
Details
       

 08-14-2011
3.00
install baffle seal
Details
       

 08-14-2011
1.00
FWF...virtually done... a few punch list items
Details
       

 08-14-2011
1.00
FWF continued
Details
       

 08-14-2011
1.75
firewall forward continued
Details
       

 08-08-2011
3.00
prop cable;gascolator, exhaust; drain lines; heate
       

 08-08-2011
3.00
continue on FW connections
Details
       

 08-07-2011
1.00
move cowling and rest of parts to airport
Details

 08-01-2011
0.00
shot a coat of rattle can primer for now
       

 08-01-2011
0.50
finish repairs to HS, VS and rudder LE
       

 08-01-2011
5.50
exhaust work and more wiring, hoses, etc.
Details
       

 07-31-2011
1.50
work on rear hoses,cables, wires and left side
       

 07-31-2011
0.00
super-fill HS, VS & rudder LE
       

 07-31-2011
1.00
repair HS, VS and rudder
Details
       

 07-31-2011
0.00
ram air....adjust and modify spacer
Details
       

 07-31-2011
1.50
ram air
       

 07-31-2011
1.50
left side wiring
       

 07-31-2011
1.00
finish connecting throttle cable clamp
Details
       

 07-30-2011
3.25
work on wiring, hoses, etc.; moslty right side
Details
       

 07-30-2011
1.75
the fun continues...throttle cable
Details

 07-30-2011
1.00
repair moving damage; rufferr LE too
Details
       

 07-30-2011
1.25
fool with prop cable
Details
       

 07-30-2011
0.50
connect oil filter hoses; safety wire
Details
       

 07-30-2011
0.00
add'l prop cable pics
       

 07-28-2011
2.00
Re-install rudder bellcrank
Details
     

 07-28-2011
1.25
re-attach both control sticks; used new AN4-25 bol
Details
       

 07-28-2011
1.50
elevator bolts - install and tighten; apply torque
Details
       

 07-28-2011
0.25
began work on controls and wiring in engine compar
Details

 07-25-2011
4.00
hang rudder
Details
       

 07-25-2011
1.00
hang elevators. Need to tighten up some bolts
Details

 07-25-2011
0.50
clean up gook on windows; fridge from Duncan
Details

 07-24-2011
5.50
rehang engine
Details
       

 07-24-2011
0.00
re-install nose gear and nose wheel
Details
       

 07-23-2011
3.75
work at airport a bit...hot!
Details

 07-18-2011
0.00
only damage from the move; left HS horn
Details
       

 07-18-2011
5.50
move wings to airport; set up shop
       

 07-18-2011
2.50
lift fuselage up and install main gear
       

 07-17-2011
8.25
move fusleage to KCXY
Details
     

 07-17-2011
2.00
load up wings - wrong way
Details
       

 07-16-2011
0.00
ready to go to airport in the morning
       

 07-16-2011
0.00
add'l load up pics
       

 07-16-2011
0.00

       

 07-11-2011
2.75
sand, tape & micro window fillets
       

 07-11-2011
1.50
sand down ELT door to fit
Details
       

 07-11-2011
0.00
add'l fillet prep
       

 07-10-2011
9.50
tape-grind-sand-prep-s/f window fillets
Details
       

 07-10-2011
0.00
super-fill window fillets - add'l pics
       

 07-10-2011
0.00
manuevering tail through door
       

 07-10-2011
0.50
load up some parts to take to KCXY; misc shop
Details

 07-10-2011
2.50
build new dolly set-up; test
       

 07-10-2011
0.00
add'l manuevering fuselage pics
       

 07-10-2011
0.00
add'l maneuvering pics
       

 07-10-2011
1.50
10"heels on...attempt moving around garage
Details
       

 07-09-2011
0.00
add'l pics
       

 07-04-2011
0.75
visor mounts; fit and tap 1 hole
Details
       

 07-04-2011
1.50
repl all a/p servo bolts with drilled bolts
Details
       

 07-04-2011
2.50
paint defroster; pull window paper
Details
       

 07-04-2011
1.25
install & wire map lights
Details
       

 07-04-2011
1.25
door seal pump wiring
       

 07-04-2011
0.00
behind panel shots thru windshield
       

 07-04-2011
1.00
B batt leads; vacuum fusleage; count screws
Details

 07-04-2011
0.00
add'l door seal pump pics
       

 07-04-2011
0.00

       

 07-04-2011
0.00

Details
       

 07-03-2011
0.50
misc shop
Details

 06-17-2011
3.25
pinhole hunting; sand-prep-super-fill
Details
     

 06-13-2011
5.75
sand, s/f, vac, prep & WLS primer
       

 06-13-2011
1.00
research and figure sniffle valve install; misc sh

 06-13-2011
1.25
install tip lights & molex connectors
       

 06-13-2011
0.50
GTX 330 transponder not booting again
Details

 06-12-2011
1.75
vac, prep. & superfill fuselage low grain/spots

 06-12-2011
2.50
sand fuselage and HS in prep for another WLS prime
       

 06-12-2011
1.00
s/f fillet to inside door jamb
       

 06-12-2011
0.00
leveling marks - add'l pics
Details
       

 06-12-2011
0.50
level & install permanent leveling marks
Details
       

 06-12-2011
0.75
fool with transponder again
Details
       

 06-12-2011
0.75
door strut back on & misc
Details
       

 06-12-2011
0.00
add'l leveling mark pics
Details
       

 06-05-2011
3.00
WLS primer to fuselage, VS and HS root
       

 06-05-2011
1.50
re-install 24v door seal pump
Details
       

 06-05-2011
0.00
fit lock to door and check tab
Details
       

 06-05-2011
0.75
fab lock tab for front door
Details
       

 06-05-2011
0.00
ELT coax installed
       

 06-05-2011
0.00
door pump cont'd
Details
       

 06-05-2011
1.50
clean up wiring in aft fuselage; ELT antenna
       

 06-05-2011
2.00
Add'l primer pics; Ned Smith visited
Details
       

 06-04-2011
1.75
sand all of fuse, VS and HS....vacuum..ready for W
Details

 06-04-2011
2.50
Ron & Debbie Perry visit and tour

 06-04-2011
0.25
fool with ELT....working? need to review manual

 06-04-2011
3.25
ELT and aux battery wiring/troubleshooting
Details
       

 06-04-2011
0.75
add extra screw to elev inspection plate, 8-32 riv
Details

 06-04-2011
1.00
add 1K resistor to aux sense line
Details
     

 06-03-2011
3.25
sand fuse and door jamb
Details

 05-22-2011
2.00
work on ELT install
Details
     

 05-22-2011
1.00
troubleshoot aux sense circuit
Details

 05-22-2011
1.00
hysol/flox aileron stops to fuse wall
       

 05-22-2011
1.50
figure out & fab aileron stops
Details
       

 05-22-2011
0.75
another pass of super-fill
Details
       

 05-22-2011
0.50


 05-16-2011
1.50
troubleshoot AUX battery not showing on VP
Details
       

 05-16-2011
0.75
pop baggage locks, sand, fit, good!
       

 05-16-2011
0.00
baggage locks cont'd
       

 05-16-2011
4.50
add'l prep and bodywork
Details
       

 05-15-2011
3.25
trim baggage blocks; sand; work on inside door jam
       

 05-15-2011
1.75
trace & rewire battery and contactor circuits
Details
       

 05-15-2011
2.00
sand, prep, vac. door hinge; fuselage elev plate a
       

 05-15-2011
0.25
misc super-fill of fuselage; hinge area; baggage

 05-14-2011
1.00
misc and make up ELT GPS power lead
     

 05-14-2011
1.50
door hinge release; 3 BID delrin baggage blocks
       

 05-09-2011
1.50
super-fill #3 to fuselage joggle
Details

 05-09-2011
1.75
more baggage door work - flox in delrin blocks, et
Details
       

 05-09-2011
1.25
baggage door locks
Details
       

 02-07-2011
0.00
underside view of install skybolts
     

 02-07-2011
2.25
oil drain door - skybolts
Details
       

 02-07-2011
0.75
lift fuselage top up on horses
Details
       

 02-07-2011
3.25
fit & trim actual side panels
Details
     

 02-07-2011
2.50
final trim,rig, apply 2 BID flanges
Details
       

 02-07-2011
1.25
do last panel- front right side
Details
       

 02-07-2011
0.75
2nd 4 BID to oil drain door
     

 02-07-2011
0.75
2 BID flange on aft seat cover
       

 02-05-2011
0.75
split forward cover into 2 pieces
Details
       

 02-05-2011
2.00
replan oil drain door
Details
       

 02-05-2011
0.50
misc shop

 02-05-2011
1.50
make cover for brake lines
Details
       

 02-05-2011
0.75
cut oil drain door
Details
       

 02-05-2011
1.25
2 BID side panel extensions
Details
     

 02-04-2011
0.75
plan out oil drain access door ala Bill H
Details
       

 02-04-2011
0.50
misc shop stuff

 02-04-2011
4.50
interior side panels
Details
       

 01-31-2011
0.75
trim & sand rest of micro'd parts
       

 01-31-2011
1.25
retighten fuel hoses
Details
       

 01-31-2011
0.75
grind and sand co-pilot stick opening
Details
       

 01-31-2011
2.00
check hardware all elev rod ends; set jam nuts
Details
       

 01-31-2011
0.75
aileron servo rod - bent threaded portion
Details
       

 01-30-2011
0.75
trim out o/h vent fairing
       

 01-30-2011
0.25
re-locate music jack
Details
       

 01-30-2011
0.75
pop off o/h vent fairing lay-up; clean
       

 01-30-2011
1.75
micro vertical hat rack
Details
     

 01-30-2011
1.00
micro top of vert hat rack; soften epoxy and reloa
Details

 01-30-2011
1.25
micro copilot stick cut out; seat belt slo
Details
       

 01-30-2011
0.75
AN3-6 bolts and castle nuts to crossover tube
Details

 01-29-2011
0.75
wing spar cover
Details
       

 01-29-2011
1.75
vent fairing to aft o/h console
Details
       

 01-29-2011
0.25
get pics & measurements on inertia reel for 2 buil
Details

 01-29-2011
1.00
decore and micro edges - various pieces
     

 01-24-2011
0.75
wire up rudder trim servo; 6 pin mini molex
       

 01-24-2011
0.50
trim baggage bracket layups; drill #12 hole for ha
Details
       

 01-24-2011
1.00
rudder travel set up
Details
       

 01-24-2011
0.50
release tape vent area at hat rack for layup
Details

 01-24-2011
1.50
re-install rudder bellcrank; adj. rod lengths to g
Details
       

 01-24-2011
0.00
left rudder cable
       

 01-24-2011
2.50
fit and swage on rudder cables
       

 01-24-2011
0.00
check swages to acceptable tolerance
Details
       

 01-24-2011
0.50
add 3 BID to inside faces of baggage door brackets

 01-23-2011
1.00
set baggage brackets and 3 BID outsides
       

 01-23-2011
0.50
re-attached pitch servo and check travel and clear
       

 01-23-2011
0.00
pitch servo pics
Details
       

 01-23-2011
0.75
misc shop and prep rudder bellcrank

 01-23-2011
0.75
micro edges of hat rack and elev TT cover
     

 01-23-2011
1.50
make baggage brackets; trim joggle
Details
       

 01-23-2011
0.75
figure, measure and cut aft seat belt access hole

 01-23-2011
1.00
elev. rigging; cut co-pilot stick hole
Details
       

 01-17-2011
2.00
wire elevator trim servo
Details
       

 01-17-2011
1.25
vertical hat rack
Details
       

 01-17-2011
0.50
trim rudder horn and top of VS for clearance

 01-17-2011
0.00
trial fit elevator tubes continued
       

 01-17-2011
0.75
horizontal part of hat rack
Details
       

 01-17-2011
0.00
horizontal hat rack installed
     

 01-17-2011
0.50
fit elev torque tube cover; grind to fit

 01-17-2011
1.75
elev. on, install tubes; test rigging
       

 01-17-2011
0.50
aft seat back latches
       

 01-17-2011
0.00

     

 01-16-2011
0.25
modified cable nut to heat on/off valve
       

 01-16-2011
0.75
mark, drill and grind 6 BID hat rack flange
       

 01-16-2011
0.50
hardpoints to vertical hat rack
     

 01-16-2011
0.50
fool with missing parts for baggage door
Details

 01-16-2011
1.50
fit & drill aft seat latches; do hardpoints
Details
     

 01-16-2011
0.50
file shoulders down on cable nuts
Details
       

 01-16-2011
2.75
fab hat rack bottom; 4 BID flange
Details
       

 01-16-2011
1.25
bond 6 BID flange for hat rack to fuselage top
       

 01-15-2011
0.25
wire 2 batteries in series; attach 24v battery min
Details
     

 01-15-2011
1.50
prep vertical hat rack for bonding
Details
       

 01-15-2011
1.50
plan and make template for hat rack vertical
     

 01-15-2011
0.00
ordered these cable nuts for parking brake and hea
Details
       

 01-15-2011
1.25
micro aft seat bottom; grind baggage pads
Details
     

 01-15-2011
0.75
cable nut installs
Details
       

 12-27-2010
2.25
wire connectors at rudder-VS gap
Details
       

 12-27-2010
0.50
seat bottom off - check flox release
Details
       

 12-27-2010
1.25
prep phenolic pad, flox and 2 BID
       

 12-27-2010
2.25
3 BID aft seat stiffener; plan seat latches & mark
       

 12-26-2010
3.00
wire up flap motor and switches; grind seat cleara
       

 12-26-2010
0.75
super-fill #1 to elevator horns; prep & s/f o/h co
Details
       

 12-26-2010
1.75
sand seat back square & bond stiffener on
       

 12-26-2010
0.00
re-install flap motor
       

 12-26-2010
0.75
grind seat clearance holes; flox release aft seat
Details
       

 12-23-2010
0.50
sand elev. weight flox area; prep for bodywork

 12-23-2010
0.75
run strobe & nav light wires through rudder
Details
     

 12-23-2010
2.00
plan and fit POS12 flap position sensor
       

 12-23-2010
1.50
more install of flap position sensor
       

 12-23-2010
0.00
micro another edge of seat back and stiffener
     

 12-23-2010
1.75
flox release was not good...will redo; grind and m
Details
       

 12-23-2010
0.00
final flap sensor install
       

 12-20-2010
0.00
right side elev balancing
       

 12-20-2010
0.00
left elevator balancing
Details
       

 12-20-2010
1.25
grind sand VS cuff for rudder clearance
Details
       

 12-20-2010
1.25
flox release aft seat botton; hard point; fill hol
     

 12-20-2010
2.50
final work on balancing elevators
Details
       

 12-20-2010
2.50
cut seat back stiffener and seat back; prep; micro
       

 12-19-2010
1.50
reverse rudder cables; turnbuckles to rear
Details

 12-19-2010
0.50
reroute elev trim cable; label all tail wires
Details

 12-19-2010
1.25
more drilling right elev.; balance
       

 12-19-2010
0.75
misc work on rudder and parts

 12-19-2010
0.50
left side holes and weight required
       

 12-19-2010
1.00
flox holes
Details
       

 12-19-2010
1.25
add'l pics of right elevator
Details
       

 12-15-2010
1.00
set up jig to balance elevators separately
Details
       

 12-15-2010
1.25
ream out 1/2" holes to 5/8"; drill more holes
       

 12-15-2010
1.25
final trim to fit of both elevators
Details
       

 12-15-2010
1.25
drilled 6 holes to 5/8" on right side
       

 12-13-2010
3.00
prep door frame for 2 BID to console
       

 12-13-2010
0.25
hang rudder; make trimming marks for travel
       

 12-13-2010
3.00
drill out excess elevator weight
Details
       

 12-13-2010
0.50
add rivnut to repair right elev insp plate
Details
       

 12-13-2010
0.00
add 2 BID to bond o/h console to door frame
Details
       

 12-12-2010
1.50
work on elevator rigging; seems like too much weig
       

 12-12-2010
0.25
trim off VS for rudder fit
       

 12-12-2010
1.25
sand and prep o/h for flox; primer coat #4

 12-12-2010
1.75
primer #2 to o/h; wire ties and flex hose
       

 12-12-2010
1.00
Phil helped hang elevators; will work on rigging
Details

 12-12-2010
1.50
flox in o/h console
       

 12-12-2010
0.00
add'l floxing in pics
       

 12-12-2010
0.50
2 coats of clear coat to o/h console

 12-11-2010
0.75
sand o/h console and primer coat #1
     

 12-11-2010
1.00
redo rest of BNCs
Details

 12-11-2010
0.25
redo elev inspection plate repair

 12-11-2010
0.50
primer #2 to o/h console; adels and ties to panel
     

 12-06-2010
1.25
tygon tube for conduit for door seal pump wires
       

 12-06-2010
1.00
super-fill #2 to o/h console; s/f #1 to defroster

 12-06-2010
0.25
start repair of nutplate on right elev inspection
Details
     

 12-06-2010
2.50
sand & trim o/h console; cut to fit
       

 12-06-2010
0.00
long view of rudder pedals with all brake hardware
     

 12-06-2010
1.00
finish up brake cylinder hardware
Details
       

 12-05-2010
1.00
super-fill holes in o/h console
     

 12-05-2010
0.75
sand and prep defroster for super-fill
     

 12-05-2010
1.50
re-do BNCs on RG400; install GPS TNC
Details
       

 12-05-2010
2.75
parking brake bracket and finish fresh air ducting
Details

 12-05-2010
0.75
molex connector to fuel pump; cooling hose
Details

 12-04-2010
0.00
test fit o/h console
       

 12-04-2010
1.75
flox parking brake bracket
Details
       

 12-04-2010
1.50
finish fresh air hose adel clamps; flip fuse
Details
       

 12-04-2010
1.75
clamp up heat scat tubing
Details
       

 12-01-2010
1.00
work on figuring out parking brake cable connectio
Details
       

 12-01-2010
2.00
panel wiring and connections, continued...
Details
       

 12-01-2010
0.00
Matco parking valve diagram
Details
       

 11-30-2010
2.00
run heat-defrost mix cable
       

 11-30-2010
0.50
misc. shop...had to clean up some!

 11-30-2010
2.00
heat system
       

 11-30-2010
0.00
heat and defrost valves
Details
       

 11-30-2010
1.25
finish strobe power supply install
Details
       

 11-28-2010
0.50
heat tube work; tee's, grind hole to aft seat

 11-28-2010
0.50
finish molex connector for magnetometer
Details
       

 11-28-2010
0.50
COM 1 antenna BNC to by-pass jack
       

 11-27-2010
4.00
engineer and run fresh air and heat lines
Details
       

 11-26-2010
0.25
spray fabricated heat-defrost mix bracket
       

 11-26-2010
0.50
micro flange in fresh air T
       

 11-26-2010
1.50
fresh air system; make T 2 1/4" to 1 3/4"
       

 11-26-2010
3.00
com/nav wire BNC connectors
Details
       

 11-26-2010
1.25
add 2 BID to make T adapter
       

 11-21-2010
1.50
work on heat-defrost-fresh air layout
       

 11-21-2010
1.00
ELT GPS to pin 6 of ADI
Details
       

 11-21-2010
1.25
clean epoxy pump; put new 11/10 epoxy in
Details

 11-08-2010
0.50
prep & flox seat strips
Details
     

 11-08-2010
2.50
panel wiring; P2 and P3 headset circuits
Details
       

 11-08-2010
2.75
heat/defrost system
Details
       

 11-08-2010
1.00
cut off defroster; touch up holes
       

 11-07-2010
1.00
flox defroster close out and 1.5" tube for hose
       

 11-07-2010
2.75
bond R armrest; prep and measure for BIDs

 11-07-2010
1.50
add 2 BID tapes to top and bottom of all arm rests
       

 11-06-2010
3.75
heater-defrost-glare shield
Details
       

 11-01-2010
2.00
wire P-5; trim circuits
Details
       

 11-01-2010
2.00
prep & bond both aft armrests
Details
       

 10-31-2010
0.75
undo aft seat belt gusset
Details
       

 10-31-2010
0.75
top on to measure for arm rests
       

 10-31-2010
0.00
not much room in glareshield area!
       

 10-31-2010
3.50
fit armrests; cut & micro; ready for bonding
       

 10-31-2010
1.75
fit and measure for armrests
Details

 10-31-2010
0.75
add handles to fuse to aid in handling
       

 10-30-2010
2.00
add aft seat belt gusset; attach handles
Details
       

 10-25-2010
6.50
crimp connectors on P-1 power plug
Details
       

 10-24-2010
1.00
test fit seats; think through how to finish
       

 10-24-2010
1.00
switched out -6 adels for -8; pitot line
Details

 10-24-2010
2.00
grounds to ground block; ground strap
       

 10-24-2010
2.00
ground terminations; add 3 click bonds
       

 10-24-2010
0.00
add'l seat pics; aft seat angle
Details
       

 10-18-2010
3.00
sand and super-fill #4

 10-18-2010
0.75
run AOA lines
Details
       

 10-18-2010
0.50
run 20G shielded for P-leads to magnetos

 10-18-2010
1.75
pitot static lines
Details
     

 10-18-2010
0.75
move pitot fitting to left wing root; run line in
       

 10-18-2010
0.75
fit and micro ELT access door
Details
       

 10-04-2010
2.00
tighten all panel brackets; ground VP control unit
Details
       

 10-04-2010
1.25
run static line and COM 2 antenna cable
Details
     

 10-04-2010
1.25
RUN PITOT LINE
Details
       

 10-04-2010
0.75
run AOA lines out right wing

 10-04-2010
1.75
fix pitot flange; rough install pitot tube
Details
       

 10-03-2010
1.75
work on running static & pitot lines
Details

 10-03-2010
2.75
sand and prep for super-fill #3; groove elev plate

 10-03-2010
0.50
repair elev trim tab; new foam, add super-fill
     

 10-03-2010
0.75
prep for 2 BID for static port
Details
     

 10-03-2010
1.00
grind for elev weldment plate cover
Details
       

 10-03-2010
0.50
Garmin SL30 service bulletin
Details
     

 10-03-2010
1.50
fit & trim elevator to VS
Details
       

 09-27-2010
3.00
sand super-fill #2
       

 09-27-2010
2.25
sand SF #2; prep for pass #3
       

 09-27-2010
0.75
rough trim both elevators
       

 09-27-2010
1.00
release tape weldment plates; fair in with super-f
     

 09-27-2010
1.00
flox in FU1 static port
       

 09-27-2010
1.75
figure out static port and pull parts; bend pitot
Details
       

 09-20-2010
2.25
prep and super-fill #1 to VS joints
       

 09-20-2010
1.25
grind and sand excess Hysol from TE

 09-20-2010
1.00
fit foam and BID top close out on VS
Details
     

 09-20-2010
1.75
fit elev. and mark for initial trim
Details
       

 09-20-2010
1.75
add 2 BID to inside joggles
Details
       

 09-19-2010
3.25
add 2 BID to bottom HS to fuselage joint
Details
       

 09-13-2010
0.00
add'l pics
       

 09-13-2010
5.25
add BIDS to fuselage and VS and HS
Details
       

 09-12-2010
1.00
misc shop; cut BIDS for VS-HS; clean up

 09-12-2010
2.00
final VS fit; prep
Details
       

 09-12-2010
3.00
bond VS left side
Details
       

 09-12-2010
1.00
attached 3" SCAT vent hose
Details
       

 09-12-2010
1.00
3 BID to inside VS-HS on right side
     

 09-11-2010
2.00
reroute and secure wires in VS
Details
       

 09-11-2010
0.75
re-level magnetometer
Details
     

 09-11-2010
1.00
install rudder bellcrank and cables
       

 09-11-2010
0.00
add'l pic...wires out rear
     

 09-06-2010
1.50
work on wiring fwd of panel

 09-06-2010
0.00
right side VS bonded on
       

 09-06-2010
1.50
manifold pressure wiring/plumbing
       

 09-06-2010
1.50
finish crimps; wire ground block
       

 09-06-2010
4.00
final prep for VS bonding and bond
Details
       

 09-06-2010
0.00
add'l pics VS right side bonding
       

 09-05-2010
1.00
VS fit and drill al clecos
       

 09-05-2010
1.00
test fit & align; check plumb with laser; drill al
Details
       

 09-05-2010
0.50
secure tail wires before bonding VS
     

 09-05-2010
1.00
cut, drill and rivit rod ends on final elev. P/P t
Details
     

 09-04-2010
2.50
lower fuse and level; give tour to Sonex guy...Ran

 09-04-2010
2.00
fit elev.; trim; measure last elev. push tube
Details
       

 09-04-2010
0.00
check elevator travel
Details
       

 09-04-2010
0.00
check elevator travel
       

 08-30-2010
5.25
work on battery area connections prior to VS close
       

 08-30-2010
2.00
fit elev tubes; fit VS; research
Details
       

 08-30-2010
0.00
add'l wiring pics
       

 08-29-2010
0.50
right side squeeze out
Details
       

 08-29-2010
1.00
measure aft seats and install ground strap
Details
     

 08-29-2010
2.50
load engine on trailer and strap down
Details

 08-29-2010
2.50
Horiz Stab bonded in!!!!
Details
       

 08-29-2010
2.50
final fit, check and adjustment before bonding
       

 08-29-2010
0.00
add'l pics for reference
       

 08-16-2010
1.25
rotate fuse and level; install rotissirie
       

 08-16-2010
4.50
prep/remove engine; rotate fuselage
Details
       

 08-16-2010
0.00
level fuselage
       

 08-16-2010
1.75
dry run; mount HS and level with laser
Details
       

 08-15-2010
1.50
starter grid wiring; crimp terminals
Details
       

 08-15-2010
1.00
start hanging wires on firewall behind panel

 08-15-2010
0.00
remote oil hoses
Details
       

 08-15-2010
0.00
re-locate alt air cable- too short the way it was
       

 08-15-2010
1.75
mini molex for fuel flow & rpm; wire pressure sens
       

 08-15-2010
0.00
install parking break cable to panel
Details
       

 08-15-2010
0.75
figure nose wheel air; fire sleeve fuel flow cube
     

 08-15-2010
2.00
fabricate & install remote oil hoses
Details
       

 08-15-2010
2.00
did all the #2,#8 terminals I had rings for
Details
       

 08-15-2010
5.00
Alt air, heat and oil cooler cables installed
       

 08-09-2010
7.50
wiring; adels; install TPM cables
Details
       

 08-08-2010
7.75
engine sensor wiring
Details
       

 08-08-2010
0.00
add'l pics- rpm sensor
Details
       

 08-02-2010
2.50
rought run CHT-EGT wires; install probes
Details
       

 08-02-2010
0.75
redo about half of click bonds from yesterday
Details

 08-02-2010
1.00
install nose wheel and pant
Details
       

 08-02-2010
1.00
figure big wire rings needed; add grommets to batt
Details
       

 08-02-2010
0.50
cut & grind add'l clearance for batt cover with gr
       

 08-01-2010
4.00
run wires
Details
       

 08-01-2010
2.50
run power wires and plan clamp locations
Details
       

 08-01-2010
1.00
flip starter power grid over; better wire access
       

 08-01-2010
2.00
design and fab ELT shelf; micro on behind batterie
Details
       

 08-01-2010
2.50
ad click bonds for tie wraps and adel clamps
       

 08-01-2010
1.50
2 BID ELT shelf; grommet in baffle for alt wire
Details
       

 07-19-2010
5.00
plan and run conduits and grommets
Details
       

 07-19-2010
2.25
micro in couplings and elbows and conduits
Details
       

 07-18-2010
2.75
wiring for flaps, landing light
Details
       

 07-18-2010
1.75
run COM2, transponder and ELT cables; bond in COM2
Details
       

 07-18-2010
0.50
repin castelated nuts for both front seats
       

 07-18-2010
0.25
install OAT probe to lower right wing tip
       

 07-17-2010
1.50
fool with diplexer placement; bolt in
Details
     

 07-17-2010
0.50
connect 12v for probes to 24-12 converter
       

 07-17-2010
1.00
added adel clamp to wig ribs
       

 07-06-2010
1.00
run RG400 for nav in RW; COM1 to vertical stab; Na

 07-06-2010
1.00
drill panel for headset jacks; drill rear seat bac
       

 07-06-2010
1.00
click bond studs on wing for fuel probe signal con
Details
     

 07-05-2010
1.10
reverse headset cable pin assignments; drill rear
Details
       

 07-05-2010
1.10
plan and mark out new jack locations on panel
Details
       

 07-05-2010
1.10
install roll servo and rough run cable
Details
       

 07-05-2010
1.10
install pitch servo and cable; back to orig. longe
       

 07-05-2010
1.10
install and level magnetometer
Details
     

 06-28-2010
2.75
wire in capacitance to voltage adapter from Dynon
Details
       

 06-28-2010
4.00
continue wiring; fab landing light attachment; chn
Details
       

 06-27-2010
4.50
run fat wires; install LS-1A voltage regulator
Details
       

 06-27-2010
0.10
flip VR so terminals are facing down; per B&C and
Details
       

 06-14-2010
1.25
redesign power grid; modify; install to R battery
       

 06-14-2010
1.25
install power grid to battery box
       

 06-14-2010
1.25
install oil and fuel pressure sensors with WDG-26
Details
       

 06-14-2010
1.00
install ground lug to click bond studs
Details
       

 06-14-2010
1.25
fabricate phenolic pad for voltage regulators
Details
     

 06-13-2010
0.50
remove 37 pin double connector-room for voltage re
       

 06-13-2010
1.75
mount manifold pressure sensor; move ARINC; place
Details
     

 05-24-2010
28.00
Ground & dual flight training in Redmond OR in N40
Details
     

 05-19-2010
4.00
do consolidated wiring diagram

 05-17-2010
6.75
continue to run wires
       

 05-17-2010
0.10
add'l wiring pics
       

 05-16-2010
1.50
position oil and fuel pressure sensors on firewall
Details

 05-16-2010
0.00
move dimmer 7/8" fwd to give clearance for VP swit
       

 05-16-2010
1.50
install GPS shelves
       

 05-16-2010
5.25
begin wiring
Details
       

 05-16-2010
0.00
add'l GPS pics
       

 05-16-2010
0.50
add adel clamp to mixture bracket for oil pressure
Details
     

 05-10-2010
1.25
VP switch panel clearance issue
Details
       

 05-10-2010
1.25
set click bond studs on EFIS units for GPS shelves
       

 05-10-2010
1.00
sand main gear fairings and prep for add'l super-f

 05-10-2010
1.25
install nutplates to left side avionics rail
     

 05-10-2010
1.25
design and fabricate shelf for 4 GPS/XM antennae
Details
     

 05-09-2010
7.00
design avionics shelves; fabricate and install
Details
       

 05-08-2010
1.00
hang panel
Details
       

 05-08-2010
2.00
design, fabricate and drill 3 braces
       

 05-08-2010
1.25
braces for throttle quadrant area
Details
       

 05-08-2010
1.00
add'l panel hangings pics
       

 05-03-2010
0.75
super-fill main fairings; 2 BID mag. shelf
       

 05-03-2010
2.00
sand and prep main gear fairings

 05-03-2010
2.00
prep and WLS nose fairing; wingtips; o/h console
Details

 05-03-2010
1.00
add holes to magnetomter shelf and micro in
Details
       

 05-02-2010
1.25
work on avionics shelf layout; micro aft of magnet

 05-01-2010
1.50
super fill to nose gear and wingtips again; flox i
       

 05-01-2010
1.50
sand wingtips, nose and main fairings

 05-01-2010
1.25
sand seat belt floxing; add micro pads to mag. she
       

 05-01-2010
1.75
design and rough up shelf for magnetometer
       

 04-26-2010
2.25
work up list of devices, locations, wire specs

 04-26-2010
1.50
servo pads; drill 7/8" holes for harness cable; cl
Details
       

 04-26-2010
1.25
plan avionics box shelves; make template
Details
       

 04-26-2010
1.50
cowl parts upstairs; fuse dolly, clean up
     

 04-25-2010
1.00
study and research firewall fwd.; pressure sensors

 04-25-2010
5.00
sand and prep cowl and nose fairing; WLS #2
       

 04-25-2010
1.00
add 2 BID to AP servo phenolic blocks
     

 04-24-2010
1.00
misc shop and drill 1/8" vent hole in nose pant

 04-21-2010
5.00
panel
Details
       

 04-19-2010
1.75
super-fill pin holes on cowls, mostly on top cowl

 04-19-2010
3.25
prep and flox servo mounting pads in AN3-5A
Details
       

 04-19-2010
3.00
modify pitch servo arm; fabricate mounting pads
       

 04-18-2010
1.00
work on placing AP servos
Details
       

 04-18-2010
0.50
tap nose gear fork; open up pant hole and counters
       

 04-18-2010
5.00
sand cowl and nose fairing, prep, WLS #2

 04-18-2010
3.00
prep cowl, WLS primer #1
       

 04-18-2010
4.00
inventory panel; work on rough wiring diagram
Details
       

 04-18-2010
0.50
drill hole for nose gear attachment
       

 04-18-2010
1.50
2 BID gear fairing bulkhead

 04-12-2010
1.50
sand cowls and nose wheel fairing again

 04-12-2010
4.50
nose gear fit and fabrication
Details
       

 04-12-2010
0.00
fabricate aft bulkhead for nose pant
       

 04-12-2010
0.25
change desicant plugs in al cylinders

 04-12-2010
0.00
aft bulkhead and fork spacers
       

 04-11-2010
1.25
super-fill cowl and nose leg fairing #2+

 04-11-2010
0.00
super-fill applied to cowl seams
       

 04-11-2010
3.50
sand cowl seams after super-fill
       

 04-11-2010
1.50
prop off; jack up to work on nose pant
       

 04-11-2010
3.00
fit for cowling seams
       

 04-11-2010
1.00
drill 3" hole in nose pant; open up bottom opening
       

 04-11-2010
0.75

       

 03-28-2010
1.00
mark & measure a/p servos; measure for harness
Details
       

 03-28-2010
0.75
grind and sand fuselage/cowling joggle

 03-28-2010
1.75
fit and trim oil door; sand cowlings again
Details
       

 03-28-2010
2.75
bodywork cowling and nose gear fairing
Details
       

 03-15-2010
0.00
seat belts holes
Details
       

 03-15-2010
5.50
sand cowl halves; super-fill #2
Details
       

 03-15-2010
0.50
figure interior panel measurements so I can order
Details

 03-15-2010
2.75
figure front seat belts and drill holes
Details
       

 03-14-2010
1.75
Super-fill #1 to both cowl halves
       

 03-14-2010
2.75
prep cowl halves for fill
       

 03-14-2010
2.00
micro bottom of cowl spinner flange
Details
       

 03-14-2010
3.00
fit & trim lower cowl spinner flange
Details
       

 03-08-2010
1.00
trim nose gear to length; add 6 1000-6 nutplates
Details
       

 03-08-2010
2.00
trim and refit cowl
Details
       

 03-08-2010
1.00
additional pics - skybolts installed
       

 03-08-2010
2.50
add .2" micro to front lower cowl spinner flange
Details
       

 03-07-2010
1.50
skybolts to aft nose gear fairing
Details
       

 03-07-2010
1.75
shape foam and add 1 BID, peel ply
     

 03-07-2010
1.50
scarf clark foam to left side of cowl
Details
       

 03-07-2010
0.50
retack foam pieces
       

 03-07-2010
1.50
decore and super fill oil door and opening
       

 03-07-2010
1.00
add nutplates to nose inlet
Details
     

 03-07-2010
0.00

       

 02-22-2010
2.75
rest of cowl skybolts; nutplate for inlets
       

 02-22-2010
2.00
fit nose fairing to lower cowling
       

 02-22-2010
2.00
fit and align nose gear fairing
Details
       

 02-22-2010
0.00
add'l pics.. skybolts to nose fairing
       

 02-21-2010
3.00
skybolt installation continued
       

 02-21-2010
3.25
install skybolts for cowling
Details
       

 02-21-2010
3.00
install rest of skybolts including studs
Details
       

 02-21-2010
1.00
fit and trim nose gear fairing
Details
     

 02-15-2010
1.50
make jig for Skybolts; fool with rivets
Details

 02-15-2010
3.00
drill rivet holes and enlarge pilot to 15/32
Details
       

 02-15-2010
1.50
cut and grind access in fuse double joggle
Details
       

 02-15-2010
0.00
Add'l Skybolt drilling pics
       

 02-15-2010
1.00
1 BID over rivets for oil access door
     

 02-14-2010
0.10
spinner alignment issue
Details
       

 02-14-2010
2.00
oil door; decore for hinge and cut; rivet hinges o
Details
       

 02-14-2010
2.50
fit cowling;layout holes for skybolts; drill & cle
Details
       

 02-14-2010
1.75
cut and rivet in Hartwell hinge for oil door
Details
       

 02-13-2010
3.25
decore for oil door latch; 4 BID flange
       

 02-05-2010
0.00
pics of top gap fuse to fuse joggle; flange width
Details
       

 02-05-2010
0.50
cut oil access door; add 4 BID

 02-05-2010
6.50
continue cowl fitting and cutting
Details
       

 02-05-2010
0.00
add'l pics
Details
       

 02-05-2010
0.00

       

 02-04-2010
5.00
fit upper & lower cowling; 1st pass trimming
Details
       

 01-31-2010
0.00
set strut to limits
       

 01-31-2010
7.50
relocate fuselage to hang engine
Details
       

 01-31-2010
0.00
nose strut installation continued
Details
       

 01-31-2010
0.00
mount nose wheel to forward fork
       

 01-31-2010
1.00
misc shop clean up and reorg.

 01-31-2010
0.50
misc shop

 01-31-2010
0.00
level fuselage in prep to mount nose strut
       

 01-31-2010
1.00
layout cowl cuts
Details
       

 01-31-2010
0.00
hang engine in order to fit cowl
       

 01-31-2010
0.00
drill and install nutplates
       

 01-31-2010
1.00
assemble nose wheel/tire; research nose strut
Details
       

 01-31-2010
7.75
assemble nose strut and mount
Details
       

 01-25-2010
1.25
sand, prep & sup-fil one side of each gear leg

 01-25-2010
0.00
prime all wing access panels
     

 01-25-2010
4.50
final sand, prep and prime fuse sides
Details
       

 01-24-2010
1.25
super-fill wing tip tops prep to re-do WLS
Details
       

 01-24-2010
1.00
sand right fuselage; super-fil #3

 01-24-2010
2.75
sand fuse sides; prep and apply super-fil

 01-24-2010
2.00
rivet 12 nutplates to each opening
Details
       

 01-24-2010
0.25
micro small dimple in aft R fuselage
       

 01-24-2010
1.25
flip fuse; misc shop

 01-24-2010
1.00
cut overhead console access; trim up air scoop hol
       

 01-24-2010
1.00
2 BID inside of NACA scoop flange
Details
       

 01-24-2010
1.00

Details
       

 01-18-2010
2.50
WLS primer to fuselage bottom; 2 coats
Details
       

 01-18-2010
0.50
put stuff away, clean up a bit, etc.

 01-18-2010
0.00
flox in air inlet to console
Details
       

 01-18-2010
2.50
final sand of fuselage bottom & prep for WLS prime

 01-18-2010
1.50
fabricate air inlet for console; flox in place
     

 01-17-2010
1.25
WLS primer to tops of ailerons & elevators

 01-17-2010
3.25
sand fuse bottom; trim flap cover flange repair
Details
       

 01-17-2010
1.25
prep & S/F #3 fuselage bottom

 01-17-2010
1.50
design & fabricate fresh air vent tube from o/h co
Details
       

 01-16-2010
1.50
WLS # 2 bottom of ailerons & elevators
     

 01-16-2010
0.50
rebond left flap cover flange with flox

 01-16-2010
1.75
prep and S/F #2 to fuselage bottom

 01-16-2010
1.50
prep ailerons and elevators for WLS #2

 01-16-2010
0.75
clean out epoxy pump; resin side had some crystali

 01-11-2010
0.75
stow right wing
Details
       

 01-11-2010
2.75
sand fuse bottom
Details
       

 01-11-2010
2.00
fit & trim access covers; vac. fuselage
       

 01-11-2010
2.00
fairing access covers; fit, fix and trim
Details
       

 12-26-2009
1.50
WLS primer coat #3 to top R wing

 12-26-2009
1.50
Vac. fuse and R wing; prep wing for WLS #3

 12-26-2009
1.25
super-fil pass #1 to fuselage bottom
       

 12-26-2009
1.25
seats off, roll fuse; fit flap,aileron,tip
Details
       

 12-26-2009
0.75
sand and prep top right wing for WLS coat #3 (doub

 12-26-2009
1.25
sand & prep fuse bottom for super-fil #1

 12-26-2009
1.00
clean up step bracket and re-do aft air vent drain
       

 12-26-2009
0.10
aileron to wing tip alignment - right wing
       

 12-21-2009
0.50
trim elev torque tube cover

 12-21-2009
1.00
fit & trim elev tube access holes in aft seat flan
       

 12-21-2009
4.50
final sand/prep and apply 2 coats WLS primer; top
Details
     

 12-21-2009
1.00
decore and micro elev holes in aft seat flange
       

 12-20-2009
0.50
re-plumb compressoer fittings to get out of way
       

 12-20-2009
1.50
prep top right wing for super-fill #1
     

 12-14-2009
2.25
prep top right wing; micro release wing tip
       

 12-14-2009
2.00
drill holes and add 10-32 rivnuts to torque tube c
Details
       

 12-14-2009
0.75
cut 4 BID fir elev. cover
Details

 12-14-2009
1.75
4 BID to elev. torque tube cover
       

 12-13-2009
2.00
WLS #2 bottom right wing
Details
     

 12-13-2009
2.00
sand and prep bottom RW for WLS #2

 12-13-2009
0.50
prep & micro fwd edge of elev. TT cover
     

 12-07-2009
1.25
WLS primer bottom RW
Details
       

 12-07-2009
2.75
sand & prep bottom RW; s/f #4

 12-07-2009
7.00
HF compressor died; to Lowes for new
Details
       

 12-07-2009
1.50
get fittings, install, adjust new compressor

 12-07-2009
1.75
flox in parking brake valve; 2 BID
       

 12-07-2009
1.75
finish sand and prep bottom RW

 12-07-2009
1.00
final sand bottom right wing
Details

 12-07-2009
1.00
figure brake fittings and connect brake lines
Details
       

 12-07-2009
1.25
fabricate top elev tube cover
       

 12-07-2009
2.50
design/fit elev. torque tube cover
Details
       

 12-07-2009
0.00
add'l parking brake pics
       

 11-29-2009
1.00
design and fit parking brake
Details
       

 11-29-2009
3.00
body work
Details
       

 11-29-2009
1.25
2 BID aft seat flange - aft side
Details
       

 11-28-2009
1.00
riv-nuts for top part of hinge
Details
       

 11-28-2009
1.75
fit/release tape access panels
Details
     

 11-28-2009
1.25
drill and rivit aft seat hinge
Details
       

 11-22-2009
3.50
sand bottom right wing, and misc grinding, etc
Details

 11-14-2009
1.00
super-fil #1 to bottom right wing
       

 11-14-2009
2.25
sand right bottom wing; fairing, flap pocket
Details
       

 11-14-2009
1.50
6 BID flange for folding seat back
Details
     

 11-09-2009
0.50
stow l wing and position right wing
Details
       

 11-09-2009
1.75
sand bottom right wing
Details
       

 11-09-2009
0.75
replace descicant; seal all openings

 11-09-2009
1.50
micro LE and flap pocket of right wing (bottom)
       

 11-09-2009
1.50
bond in lower seat back, 2 BID flange/fuselage
       

 11-09-2009
0.75
alignment issues with left wing???
Details
       

 11-09-2009
0.10

       

 11-02-2009
2.00
sand & prep top left wing
Details
       

 11-02-2009
0.50
figure parking brake; dev. parts needed list

 11-02-2009
1.00
continue on aft seat back geometry
       

 11-02-2009
1.25
bond in aft seat flanges with flox
       

 11-02-2009
1.50
2 coats WLS primer on top left wing
Details
     

 11-01-2009
1.75
prep 3 BID and 4 BID for at seat
Details
       

 11-01-2009
0.75
DC4 filter, descicant plugs, misc

 11-01-2009
1.25
3 BID front of seat back flange and flip L wing ov
     

 10-26-2009
2.50
sand left lower wing for "fuzzies"
Details
     

 10-26-2009
2.75
fabricate and prep at seat flanges, etc
Details
       

 10-26-2009
2.00
apply 18 BID to fwd seatbelt gusset
Details
     

 10-18-2009
3.00
forward seat belt gusset
Details
       

 10-18-2009
3.00
figure/design rear saet flange
Details
       

 10-18-2009
1.00
cut 4 sets of 9 BID for fwd gusset-seat belt

 10-17-2009
6.25
final prep left lwr wing; 2 coats WLS primer
Details
       

 10-10-2009
4.50
sand and super-fil bottom of left wing
Details

 10-05-2009
2.75
trim aileron fairing, sand bottom left wing
       

 10-05-2009
1.25
super-fill #2, bottom left wing
       

 10-05-2009
1.50
sand r fuse, s/f #4

 10-05-2009
1.00
prep releases for access panels and tips
       

 10-04-2009
1.00
sand VS; prep for final body work; WLS if nice wx?

 10-04-2009
2.75
prep for 2 BID flap to aileron on left wing
       

 10-04-2009
2.50
flip left wing, sand, grind prep add super-fil
Details
       

 09-28-2009
2.75
sand right fuselage; s/f #2

 09-28-2009
1.25
break out brake cover release; sand LT wing; add'l
Details
       

 09-27-2009
0.75
super-fill top left wing; pass #1
     

 09-27-2009
1.25
sand R fuselage and super-fill
     

 09-27-2009
1.25
S/F #2 TL wing; s/f speed brake pocket
       

 09-27-2009
1.00
release tape speed brake pocket LT wing
Details
       

 09-27-2009
1.75
prep top left wing for repairs and s/f
       

 09-27-2009
2.00
micro release left wing tip
Details
       

 09-27-2009
2.50
clean up tip release; prep top left wing
Details
     

 09-27-2009
1.00
add 2 BID to LE L wing, and 3 BID to flap control
Details
       

 09-27-2009
1.00
ad add'l RG400 for potential NAV antenna in tail
Details
       

 09-20-2009
1.50
spray flaps and wingtips with WLS primer
Details
       

 09-20-2009
3.00
set up hanging wire; prep flaps and wing tips
Details

 09-20-2009
2.00
make template; figure out oil hose routing - measu
Details

 09-20-2009
0.50
cut about .25" off of oil stud to accept Airwolf a
Details
       

 09-07-2009
1.25
re-arrange shop, move fuse, lay left wing flat
Details
       

 09-07-2009
1.00
intalled remote oil filter on firewall
Details
       

 09-07-2009
0.10
install Saf-Air quick oil drain
Details
       

 09-07-2009
3.50
install quick oil drain, begin Airwolf remote oil
Details
       

 09-07-2009
1.50
decore and add phenolic for remote oil filter
       

 08-30-2009
0.75
sand left fuselage again
 

 08-30-2009
1.50
sand flaps and tips...ready, but need Wonder-fil
Details
       

 08-30-2009
2.00
sand and prep right side of fuse for micro
       

 08-30-2009
2.00
place and drill hole for tail tie down ring
Details
       

 08-30-2009
0.25
grind out i/s of naca vent
     

 08-17-2009
3.50
sand fuselage - round #2
Details
       

 08-17-2009
2.50
sand flaps and wing tips again
Details
     

 08-16-2009
2.00
sanded and Super-filled left side of fuselage...mo
Details
       

 08-16-2009
2.50
sand flaps and apply Super-fil coat #2
Details

 08-10-2009
1.25
Super-fill to top of both flaps; surface is actual
     

 08-10-2009
3.50
sand bottom side of both flaps
Details

 08-10-2009
0.10
rechecked HS to cradle; e-mailed pics to Lancair
Details
       

 08-10-2009
0.50
recheck fit of HS to cradle per ? to Justin last w

 08-10-2009
0.50
grind excess micro from NACA scoop
Details
       

 08-10-2009
0.10
add'l HS to cradle pics for Lancair
Details
       

 08-09-2009
8.00
transport engine & prop to Perry County Airplane F
Details
       

 08-09-2009
0.10
snap shots of mags and alt. for Aerotronics
       

 08-09-2009
0.10
set engine on dolley for now..may rig engine stand
     

 08-03-2009
3.50
sand wing tips and add 2nd coat of Super-fil
Details
       

 08-03-2009
2.00
sand tips and add 2nd coat of Super-fil
     

 08-03-2009
1.00
Decore & micro NACA scoop; pull clecos
     

 08-02-2009
0.50
replaced RG58 coax in VS with RG400
Details
     

 08-02-2009
0.10
place NACA scoop on left side of fuselage
Details
       

 08-02-2009
0.50
lool through box that shipped with engine
Details

 08-02-2009
1.50
fit 1:1 panel #2, figure front headset jack positi
Details
       

 08-02-2009
0.50
figure out where to put NACA fresh air scoop
Details
       

 08-02-2009
2.75

Details
       

 07-26-2009
0.50
apply Super-fil to wing tips before leaving for OS

 07-20-2009
2.00
shoot primer on HS
Details
       

 07-20-2009
1.50
sand both wingtips, prep for Super-fill; misc clea
     

 07-20-2009
0.75
micro floor boards, 2nd pass
       

 07-19-2009
1.25
sand, prep and micro wing tips
       

 07-19-2009
2.50
sand HS bottom, wonder-fil, prep
Details
     

 07-19-2009
1.25
hang primed parts upstairs in the loft (aka Chris'
Details
       

 07-19-2009
1.00
flipped tileboard at layup table around; gen'l cle
       

 07-18-2009
2.50
sand top of HS; superfill botom of HS

 07-13-2009
0.10
WLS part #'s info
Details
       

 07-13-2009
9.50
sand and prep for 1st shot of primer
Details
       

 07-12-2009
1.75
test fit 1:1 panel print out
Details
       

 07-12-2009
5.00
sand, prep, add super-fil
Details
       

 07-12-2009
2.25
Sand & prep top of HS; add Super-fil to top
     

 07-12-2009
0.10
panel pics #3
       

 07-12-2009
0.10
more panel fitting pics
       

 07-12-2009
0.50
drill battery box holes;
       

 07-12-2009
0.75
2 BID FS185 to fuselage
       

 07-06-2009
3.75
sand rudder & elev. trim tabs; move wings to new c
Details
       

 07-06-2009
2.00
sand HS top; micro 1st pass HS top
Details
       

 07-06-2009
1.75
prep elev and rudder with 150 grit; add Super-Fil
     

 07-06-2009
0.50
misc shop & clean up

 07-06-2009
1.50
fabricated battery box hardpoints & shims
Details
       

 06-28-2009
3.50
sand elevators; add Super-Fil to top face
Details
       

 06-28-2009
0.25
reserach Service Bulletin for rounding of HS edges
Details

 06-28-2009
1.25
modify battery boxes for 2 Odyssey PC680 batteries
Details
       

 06-28-2009
1.00
micro 2nd face of top rudder pocket....misc shop
       

 06-28-2009
1.75
Assemble shop crane; misc shop
Details
       

 06-28-2009
0.00
additional battery box pics
     

 06-08-2009
1.25
sand top right elevator 1st pass; torque right sid
Details

 06-08-2009
2.25
sand top left elevator; fix stripped AN4-6A bolt
Details
       

 06-08-2009
1.00
sand rudder micro and top right elevator
       

 06-08-2009
1.00
reseach and plan battery and power grid placement
Details

 06-08-2009
1.50
micro top of rudder wieght area; add 2nd pass micr
Details
       

 06-01-2009
4.75
sand micro'd elevators; micro other side
       

 06-01-2009
0.50
micro TE of rudder trim tab
     

 05-31-2009
2.75
sand, prep and micro elevators
Details
       

 05-31-2009
1.50
sand elevators and prep for 1st micro
Details
       

 05-31-2009
0.50
rebuild wing stands
Details
       

 05-31-2009
1.00
misc. shop, cleanup, reorg., etc

 05-30-2009
1.00
take off fuselage top on rotisserie
Details
       

 05-30-2009
1.00
rebuild wing stands so both wings face the same wa

 05-30-2009
1.50
prep and add Loehle Wonder-fil to bottom of HS
Details
     

 05-30-2009
1.50
grind out BID at elev. stop phenolic for clearance
     

 05-30-2009
1.50
fit elevators to HS; sand micro'd ends to get prop
       

 05-30-2009
1.25
final fit of elevator to HS; shop clean up
       

 05-11-2009
2.00
mount rotisserie with Phil's help
Details
       

 05-11-2009
0.50
micro left end of HS....cabin method
     

 05-11-2009
1.50
grind trim tab; begin sanding LS of rudder
       

 05-11-2009
2.00
fit rotisserie and cut floorboards for bolt access
       

 05-11-2009
2.00
build wing cradle stand
Details
       

 05-10-2009
0.50
micro right end of HS
       

 05-10-2009
7.00
drove to VA - Bill Harrelson to pick up rotisserie
Details
       

 05-10-2009
2.50
Begin set up of rotisserie

 05-04-2009
2.00
shape clark foam for LE of rudder trim tab
Details
       

 05-04-2009
1.50
prep and micro LS rudder; bond trim tab fairing
       

 05-04-2009
1.50
misc. including figuring firewall connectors
Details
       

 05-04-2009
0.10
called out screws too long; will use shorter ones
Details
       

 05-04-2009
2.50
and micro on right side of rudder (appled yesterda
     

 05-04-2009
0.10
1 BID and peel ply LE foam on trim tab
       

 05-03-2009
1.75
trim and fit and trim and fit rudder trim tab
       

 05-03-2009
2.00
sand and prep rudder, micro right side
Details
       

 05-03-2009
0.50
research various issues

 05-03-2009
1.00
prep and micro short half of elevator pockets
Details
       

 05-03-2009
1.00
check travel...have 35 degress each way
Details
       

 05-03-2009
0.50
add Clark foam for LE of trim tab
Details
     

 05-03-2009
0.10
2 - 32 pin firewall connectors
Details
       

 04-23-2009
0.10
Sun N Fun report Panel and VP200
Details

 04-23-2009
1.00
Sun N Fun 2009 Engine & Panel, etc.
Details
       

 04-23-2009
0.10
more engine pics
       

 04-23-2009
0.10
final engine pics
       

 04-12-2009
1.00
trim rudder trim fairing to shape; sand botton of

 04-12-2009
0.50
research 740 and 720 black cables; measure all cab
Details
       

 04-12-2009
0.50
remove panel; pack up to take to SNF for Aerotroni

 04-12-2009
1.00
prep rudder LE close-out

 04-12-2009
0.10
measurements for panel shop
       

 04-12-2009
1.00
instrument panel fit #2
       

 04-12-2009
0.75
install 2 nutplates to 4 BID bracket on each side
       

 04-12-2009
1.00
fit instrument panel
Details
       

 04-12-2009
0.50
1 BID to right side; misc. shop
     

 04-12-2009
0.50
1 BID to left side of rudder LE close-out
       

 04-11-2009
0.75
pul parts for panel install.

 04-11-2009
1.50
prep rudder; 1 BID on close-out
Details
       

 04-11-2009
1.00
pop use top; fit panel bank
       

 04-11-2009
0.10
my faithful helper, Maggie... on the job!
       

 04-11-2009
1.00
fit fuselage
Details
       

 04-11-2009
1.00
fit & trim panel to fuselage; 2 screws each side t
       

 04-11-2009
2.00
after adding 4 BID for flanges
       

 04-05-2009
1.50
Sand bottom of Horiz. Stab - continued
Details

 04-05-2009
0.10
rudder LE close-out
       

 04-05-2009
1.00
make add'l fairing #3, add micro to bottom of HS

 04-05-2009
1.50
grind and prep rudder trim tab pocket
Details
       

 04-05-2009
1.25
flox in rudder leading edge close-out
Details
       

 04-04-2009
1.75
trim and prep rudder; remove clecos; release tape
Details
       

 04-04-2009
0.50
split rudder LE close-out
Details
     

 04-04-2009
1.00
remove peel ply from rudder, pop fairing copy #1;
Details
       

 04-04-2009
2.25
begin sanding of bottom of Horiz. Stab
Details
     

 04-04-2009
1.50
add 2 BIDs to rudder edges, form extra fairing #1
       

 03-29-2009
0.50
shop clean up

 03-29-2009
2.00
prep and close rudder
Details
       

 03-29-2009
2.25
micro bottom of Horiz. Stab.
Details
       

 03-29-2009
0.50
decide on what to do with with middle rudder hinge
Details
       

 03-29-2009
0.50
adjust Palladin 3 layer stripping tool
Details
       

 03-29-2009
0.00

       

 03-22-2009
1.25
trim VS with longboard; cut hole for conduit to ru
       

 03-22-2009
0.20
noticed middle rudder hinge end is crooked
Details
       

 03-22-2009
0.10
enlarge inside rudder holes; grind 6 BID on bellcr
Details
     

 03-22-2009
2.00
clay balls to check VS skin fit; check rudder trav
Details

 03-22-2009
1.75
check VS angle, enlarge rudder holes
Details
       

 03-09-2009
2.00
sand HS, HSm back on re-check level and incidence
Details
       

 03-09-2009
0.50
pop bellcrank bolt off; redrill hole
Details

 03-09-2009
1.25
drill rudder tube holes
Details

 03-09-2009
1.25
drill holes for rudder tubes-fit
Details
       

 03-08-2009
1.75
trim & sand VS, clean up fwd VS spar

 03-08-2009
1.50
sand and prep rudder skins
Details
     

 03-08-2009
0.50
reserach and order crimper and stripper
Details

 03-08-2009
1.00
re-set incidence for HS
Details
       

 03-08-2009
0.75
HS off; fab 2 - .082 shims; bond to HS cradle with
     

 03-08-2009
0.10
add'l pics after figuring shim needed
       

 03-08-2009
1.00
2 BID to NACA scoop and to LE cut-out to HS
       

 03-07-2009
0.75
install 4 click bond tie wraps fasteners; 2nd grom
       

 03-07-2009
0.50
flox in air scoop/ fwd VS spar
     

 03-07-2009
1.50
add grommets; figure out BNC connection - add end
     

 03-07-2009
0.50
add ends to rudder tubes; remove VS and mark for p
     

 02-23-2009
0.75
stern post; grind seam and clean up hinge holes, t

 02-23-2009
1.25
sand, prep, and flox in extra weight 535 grams + f
Details
       

 02-23-2009
1.00
pop tailight mount off and raise .18"
Details
       

 02-23-2009
0.50
ended up using the hinges from VS
Details
       

 02-23-2009
0.50
continue to balance rudder
       

 02-23-2009
0.50
1st attempt at jig to balance rudder
       

 02-22-2009
0.25
trim VS to marks
       

 02-22-2009
0.50
test fit taillight...need to grind screw heads; mo
Details

 02-22-2009
2.50
fit, trim rudder and vertical stab
Details
       

 02-22-2009
0.75
fit HS, right and left VS
Details
       

 02-22-2009
2.50
continue fitting/grinding VS and rudder
Details
       

 02-22-2009
0.50

       

 02-21-2009
1.25
grind out elev hole; grind/trim bellcrank platfrom
Details
       

 02-16-2009
0.75
rought cut rudder pushrods, flox rod ends; figure
Details

 02-16-2009
2.25
grind, sand and prep bellcrank platform; add 6 BID
       

 02-16-2009
1.25
figure and grind hole for elevator push rod to VS
Details
       

 02-16-2009
0.50
cut elev tube to rough length; clean up rudder bel
Details
     

 02-16-2009
1.00
add rivnuts and install lower rudder hinge
Details
       

 02-15-2009
1.00
rudder bellcrank
       

 02-15-2009
0.10
GHP working the VS
     

 02-15-2009
1.25
flox in rudder platform
       

 02-15-2009
1.00
flox in rudder mount and flox NACA drains
       

 02-15-2009
1.50
fit rudder to VS; continued
       

 02-15-2009
1.25
fit and trim rudder to VS
Details
       

 02-15-2009
1.00
cut and fit phenolic for rudder mechanism
Details
       

 02-15-2009
1.25
continue fitting and trimming VS to rudder
Details
       

 02-14-2009
1.50
trim stern post and grind hinge access areas
       

 02-14-2009
1.25
misc. shop and cut left rudder after measure, meas

 02-14-2009
1.25
fit stern post, trim, trim , trim...
Details
       

 02-14-2009
1.25
fit and trim stern post of rudder
       

 02-14-2009
0.25
begin planning/measuring for rudder mount

 02-09-2009
2.00
repair insp. cover nutplate; close out trim tab
Details
     

 02-09-2009
1.50
more pictures... close out rudder trim tab
       

 02-09-2009
1.00
fit fwd plaenum; grind main air hole and drain hol

 02-09-2009
1.00
cut out trim tab, cleco air plenum, micro trim tab
       

 02-09-2009
1.50
cleco rudders, check plumb, trim taillight; close
       

 02-08-2009
2.00
rudder trim tab
Details
       

 02-08-2009
1.25
rudder trim tab
Details
       

 02-01-2009
0.25
remove peel ply from VS and grind/trim rudder pock

 02-01-2009
2.00
drill for elev. weldment inspection panel
       

 02-01-2009
2.25
1 ah shit (see pic), install all 14 nutplates
Details
     

 01-31-2009
0.50
pocket for extra weight if needed
Details
       

 01-31-2009
0.50
misc shop and pull parts

 01-31-2009
2.50
fit vertical stabilizer
Details
       

 01-31-2009
1.25
fit tailight and rudder weight in right side of VS
Details
       

 01-31-2009
1.00
elevator weldment inspection plates
Details
       

 01-31-2009
1.50
bond rudder weight and tail light bracket
Details
       

 01-31-2009
1.00
bond in VHF COM antenna
Details
       

 01-30-2009
1.00
misc. rudder
Details
       

 01-30-2009
1.00
level & plumb fuse.
Details
       

 01-30-2009
1.50
figure trim tab; prep and apply close out and spar
       

 01-30-2009
0.75
fabricate and epoxy 2 add'l shims on left HS cradl

 01-30-2009
1.50
design and install conduit for servo and aft light
     

 01-25-2009
1.00
put fuselage top on; cleco and bolt
Details
       

 01-25-2009
1.50
pre-fit VS
Details
       

 01-25-2009
1.00
Plan antenna; refit HS, add 2 shims to right side
Details
       

 01-25-2009
1.00
mark rudder trim tab, cut hinges; add 4 BID

 01-25-2009
1.50
install rudder trim servo and access panel
Details
     

 01-25-2009
1.75
fit VS; cut rudder off; add NACA scoop
       

 01-25-2009
0.75
add'l pics
     

 01-24-2009
0.50
trim fuel tunnel; rivnut fuel selector
Details
     

 01-24-2009
1.00
prep & epoxy shims for stab cradle
Details
       

 01-24-2009
2.50
fuel tunnel and floorboards
Details
       

 01-24-2009
0.50
add ad'l micro to floorbaord transition

 01-18-2009
0.10
stab fitting - cont'd
       

 01-18-2009
2.00
level fuse, trim supports
Details
       

 01-18-2009
2.50
fit stabilizer; measure, measure, measure
Details
       

 01-18-2009
0.10
final pics of stab set-up
Details
       

 01-18-2009
0.75
fabricate 4 BIDS for fuel hose tunnel
     

 01-18-2009
1.00
cradle interference with elev. stops
Details
       

 01-18-2009
1.00
3 BID release for fuel tunnel cover
Details
       

 01-17-2009
0.50
install replacement seat slider mechanisms
Details
       

 12-28-2008
3.50
turn fuse; stow left wing; clean shop; fill pump
Details
       

 12-28-2008
1.00
prep floor, release tape for tunnel flange
Details
     

 12-28-2008
1.00
add vinyl hose to cushion fuel lines through holes
       

 12-27-2008
2.50
trim fuse supports; lower wing
Details

 12-27-2008
0.50
research selector issue on line and in Lancair "go

 12-27-2008
1.25
fit/trim fuel line tunne; study selector attachmen
Details
       

 12-27-2008
1.00
add 2 BID to vertical floorboard supports
       

 12-27-2008
1.25
2 BID top of fuel line tunnel
Details
     

 12-26-2008
1.00
Trim & prep fuel line tunnel and vert. capstrip

 12-26-2008
0.25
cut lay-ups for vertical floor supports
Details
     

 12-26-2008
1.50
cleco and bond vertical floorboard supports
Details
     

 12-26-2008
1.00
add 2 BID to inside of fuel line tunnel
Details
     

 12-22-2008
1.75
trim fuel line tunnel , fabricate
Details
       

 12-22-2008
1.25
trim aft seat & flanges; grind seat belt holes
       

 12-22-2008
1.00
drill holes & add nutplates for seat

 12-22-2008
0.50
cut inside and outside BIDs for top; misc. shop

 12-22-2008
1.00
1 BID to vertical support capstrip
     

 12-21-2008
0.10
will need a micro release and micro build up
Details
       

 12-21-2008
1.75
fabricate vertical supports for under floorboards
Details
       

 12-21-2008
2.00
design forward floorboards, cut template
       

 12-21-2008
2.50
design & fabricate fuel line tunnel
Details
       

 12-21-2008
0.75
cut pre peg and fit floorboards
       

 12-20-2008
1.00
micro and 2 BID aft seat flange support
     

 12-20-2008
0.10
make support for flange; drill seat belt bolt hole
       

 12-20-2008
1.00
figure out floorboards, begin template
Details

 12-20-2008
1.25
aft seat flange support
Details
     

 12-20-2008
2.00
add'l 4 BID on aft seat bottom
Details
       

 12-15-2008
0.10
ordered IO-550 reman engine from Continental
Details

 12-14-2008
1.00
seat rail template and drill holes in fuse flanges
     

 12-14-2008
1.00
fit seats, mess with corrosion
Details
       

 12-14-2008
1.75
3 BID to bottom of aft seat bottom
       

 12-13-2008
2.50
trim, prep and bond seat bottom
Details
       

 12-13-2008
0.50
research aft seat flanges....manual is fucked up

 12-13-2008
1.00
epoxy build up strips to spar flange, misc.
     

 12-13-2008
1.00
cut aft seat bottom and fit
       

 12-13-2008
2.75
aft seat flange - top
Details
       

 12-13-2008
0.50
add 2 BID to errant cut on seat bottom
     

 12-07-2008
0.75
research gusset removal and seat placement
Details

 12-07-2008
0.50
pull seats parts

 12-07-2008
0.50
prep bulkhead flange to bond strips next week

 12-07-2008
0.50
general, long overdue, shop cleanup

 12-07-2008
2.00
assemble front seats
       

 12-07-2008
0.25
alternate method for seat release
Details
       

 12-07-2008
1.25
aileron bulkhead mistake
Details
       

 12-06-2008
2.75
micro and 2 BID both close out panels
       

 12-06-2008
1.50
finish step and left aileron push rod
Details

 12-06-2008
2.50
fabricate shear close out and aileron close out
       

 11-30-2008
1.00
work on finishing fuel system lines
Details
       

 11-30-2008
0.50
left wing back on
Details
       

 11-30-2008
1.00
fuel hoses
Details
     

 11-30-2008
0.50
drill hole in step sleeve and make flox shoulder
       

 11-23-2008
1.50
step work
Details

 11-23-2008
2.50
micro prepeg panel 1 of 3 in place
       

 11-23-2008
1.75
micro panels 2 and 3; add 2 BIDs
       

 11-23-2008
2.00
measure for step and cut holes
Details
       

 11-23-2008
2.00
flox step sleeve in place
       

 11-23-2008
1.00
fabricate step panels 2 and 3
     

 11-23-2008
0.50
add 6 click-bond studs to hold fuel lines
Details
       

 11-17-2008
1.50
more fuel system work
       

 11-17-2008
0.50
level fuse; prep for step installation

 11-17-2008
1.50
finish fuel hoses and fittings
       

 11-17-2008
1.25
bulkhead fitting to gascolator
Details
       

 11-15-2008
4.00
micro belly, access panels, repair leg fairing
Details
       

 11-02-2008
0.50
flox pre-preg in trailing edge of right wing tip
     

 10-27-2008
4.00
fit & cut wing tip lights
Details
       

 10-26-2008
1.00
install nutplates for light mount
       

 10-26-2008
1.00
grind out mount for strobe and nav lights
Details
       

 10-26-2008
1.50
fit, trim, fit wing tip light mount and lense
       

 10-25-2008
1.00
install nutplates for right wing tip

 10-25-2008
0.75
flox in brass fittings to each NACA scoop
       

 10-25-2008
0.50
figure out new plan for fuel vent
Details
       

 10-25-2008
0.50
drill holes for R tip nutplates

 10-25-2008
1.00
drill hole for vent in NACA scoop in each wing tip
       

 10-25-2008
0.25
cut off AN fittings for fuel vent in wing
       

 10-25-2008
0.50
begin trimming light brackets

 10-20-2008
1.00
install nutplates for access panels
     

 10-20-2008
2.25
finish fuel and flap access panels
Details
     

 10-19-2008
2.00
release tape panels and add 4 BID for flange
       

 10-19-2008
1.75
prep and 2 BID left wing end for tip
     

 10-19-2008
0.25
fool with fuel vent thinking some more
     

 10-19-2008
0.50
cut fuel and flap access panels
       

 10-19-2008
0.50
cut fuel and flap access panels
     

 10-19-2008
0.50
cut fuel and flap access panels
       

 09-28-2008
0.10
pics from 9/28 and prior
Details
       

 09-28-2008
0.10
pics from 9/28
       

 09-28-2008
9.50
bodywork fuselage, wing tips, fuel access panels
Details
       

 09-28-2008
0.10

Details
     

 09-15-2008
0.50
trim left and right wing tips with longboard
Details
       

 09-15-2008
2.25
sand and apply 2nd pass of micro on fairings
       

 09-15-2008
1.00
remove wheel pants and trim - no pics

 09-15-2008
1.25
add'l and final fitting of aileron into wing pocke
Details
     

 09-14-2008
1.75
micro bottom of fuselage & wing/leg fairings
Details
       

 09-14-2008
2.25
fit left aileron
Details
       

 09-14-2008
1.00
decore, prep and 2 BID left top wing skin core
       

 09-14-2008
2.00
decore right side top skin; prep and 2 BID
Details
       

 09-13-2008
2.50
sand lower wing and leg fairings; prep for 1st bod

 09-07-2008
1.00
sand repaired
Details
       

 09-07-2008
0.50
organize new bolt and nut, etc trays, label

 09-07-2008
1.25
fit left aileron with weights attached
Details
     

 09-07-2008
1.50
dril and attach lead aileron weights
Details
       

 09-07-2008
2.25
apply 2 BID to TE of both leg fairings
       

 09-07-2008
1.50
add add'l 2 BID to right wing fairing over foam
     

 08-25-2008
0.75
whoops...hole forward and s/b aft
Details
       

 08-25-2008
1.75
trim and fit fairings; add access holes
Details
       

 08-25-2008
1.00
shape foam to build out right wing fairing
Details
       

 08-25-2008
0.75
flox foam to right fairing to build up gap
     

 08-24-2008
0.10
close up after balancing
       

 08-24-2008
0.50
clean shop and think through foam for fairing

 08-24-2008
1.25
BIDs to right side fairing
Details
     

 08-24-2008
2.00
balance ailerons; mark for holes
Details
       

 08-24-2008
3.00
add BIDS to wing fairings
Details
       

 08-23-2008
3.00
pull access panels and prep wing fairings
Details
       

 08-18-2008
3.50
trim upper fairing access panels
Details
       

 08-17-2008
1.50
nutplates to top panel; countersink
Details
       

 08-17-2008
1.50
flox left side; used temp. screws to get a good al
       

 08-17-2008
2.75
add nutplates to left fairing, flox
Details
       

 08-10-2008
1.00
right side...
     

 08-10-2008
1.50
prepare right side fuselage inner panel cover

 08-10-2008
2.00
jig for panel; release tape top accerss panel
       

 08-10-2008
1.50
fit and trim inside fuse fairings
       

 08-09-2008
0.75
turn threads on perma-grit countersink
Details
       

 08-09-2008
1.00
flox both outside fusleage fairings in place
       

 08-09-2008
0.20
fix threads in both axles....mainly left.
Details
     

 08-09-2008
0.75
fit and trim both outside fuselage fairings
       

 08-09-2008
0.25
fairing interferes with fuel access panel
Details
       

 08-03-2008
1.00
Prepare to flip fuselage over
Details
       

 08-03-2008
0.10
Flipped over
       

 08-03-2008
0.75
fit gear to fuselage fairings
       

 08-03-2008
1.00
fit fairing...mark for trimming
Details
       

 08-03-2008
0.75
cleco gear-fuselage fairing in place
       

 08-03-2008
0.10
both sides marked and cleco'd - will trim cut next
     

 07-27-2008
1.50
run lines and connect Russell fittings
       

 07-27-2008
1.50
route stainless steel supply and return lines
       

 07-27-2008
1.00
new hoses and fittings
Details
       

 07-27-2008
0.50
mount fuel pump bracket
       

 07-27-2008
1.00
micro all new openings
       

 07-27-2008
0.75
grind holes to fuel selector
     

 07-27-2008
0.25
add fittings to fuel selector
Details
     

 07-27-2008
1.00

Details
       

 07-21-2008
0.75
trim wheel pants and trim excess flox on build-up

 07-21-2008
1.00
pull step parts and study manual

 07-21-2008
0.25
pull off aileron controls in prep for flipping fus

 07-21-2008
1.50
prep & micro both wing fairings in prep for 2 BID
       

 07-21-2008
0.75
grind fwd right buildup in prep to add material
Details
       

 07-21-2008
0.50
countersink wheel pant holes

 07-21-2008
1.50
add nutplates to all wheel pant brackets
       

 07-21-2008
0.25
add 2 BID to fuel selector pad, right side

 07-21-2008
0.10

Details
       

 07-20-2008
0.75
redo right side forward flox realese
Details

 07-20-2008
0.50
install fuel selector to pad
       

 07-20-2008
0.75
flox release to forward brackets
Details
     

 07-20-2008
0.50
dril holes into aft wheel pant bracket
       

 07-19-2008
0.10
took time out to knock off a ground hog
       

 07-19-2008
3.00
flox release on aft brackets on both sides
Details
       

 07-19-2008
1.00
add nutplates for leg fairing to wheel pant
Details
       

 07-14-2008
0.50
micro and add 2 BID to base for fuel selector
     

 07-14-2008
2.00
messed up fuel selector base...re-did
Details
       

 07-14-2008
0.25
further documenting fuel system mis-specification
Details
       

 07-14-2008
4.00
fit both wheel pants to leg fairing...lots of fit
Details
       

 07-14-2008
1.50
finished up securing wall cut-out to accomodate bo
Details

 07-14-2008
0.10

     

 07-14-2008
0.10

       

 07-13-2008
2.50
pull fuel system parts and try to figure out manua
Details
     

 07-13-2008
1.50
prepare mounting plate for fuel selector
Details
       

 07-13-2008
0.50
info on fuel return line and fittings
Details
       

 06-29-2008
5.00
rearrange shop; cut hole in garage wall
Details
       

 06-29-2008
0.10
opening framed up
       

 06-29-2008
0.50
crawl under fuselage..verify BIDs, remove peel-ply

 06-23-2008
0.50
slide left gear fairing on left main after removin
       

 06-23-2008
1.00
more fit, grind, fit, grind left wheel pant to lef
       

 06-23-2008
0.50
install and 2 BID washer inside left pant

 06-23-2008
2.00
fit, drill, fit right pant
       

 06-23-2008
1.50
fit, drill, fit left wheel pant
Details
       

 06-23-2008
1.00
drill, countersink and add nutplates to all pant b
       

 06-23-2008
0.50
add washer & 2 BID to right pant
       

 06-22-2008
1.50
prep aileron for balance
Details
     

 06-22-2008
2.00
KCXY pilot gang came up for a tour
Details

 06-22-2008
1.00
grind groove and try to balance right aileron
Details
       

 06-22-2008
1.50
attemtp left aileron balance (cont'd)
Details
       

 06-21-2008
1.25
try to fish servo wires through aileron
Details
     

 06-21-2008
0.50
super-glue conduit in
Details
       

 06-21-2008
0.25
sand micro on left wing fairing
Details

 06-21-2008
0.10
had a visitor today...3 foot black snake
Details
       

 06-21-2008
1.25
flatten all 14 lead rods for aileron balancing
Details

 06-21-2008
0.50
fit and trim roll servo to hole in aileron

 06-15-2008
1.00
trim access panels
       

 06-15-2008
1.50
research and prep for aileron balancing
Details
       

 06-15-2008
1.50
micro release both wheel pants...not hard, but tim
       

 06-15-2008
0.75
install nutplates on right wheel pant
       

 06-15-2008
0.75
improvised pliers for squeezing rivets
Details
       

 06-15-2008
0.50
flox right leg fairing; used a bit more flox this
     

 06-15-2008
1.00
fit and trim access panel to right wheel pant
Details
       

 06-13-2008
1.25
prep, fit and figure contour of leg fairing
       

 06-13-2008
0.50
misc shop; received BO'd nose gear strut...looks g
Details

 06-13-2008
1.25
install 6 nutplates on left wheel pant
Details

 06-13-2008
1.75
flox left left fairing after a lot of trial and fi
Details
       

 06-13-2008
1.75
finish brake lines; insulate, tie-strap
       

 06-13-2008
1.00
finish brake lines
Details
       

 06-13-2008
1.50
cut and trim brake access panel to both wheel pant
       

 06-09-2008
2.00
repair left wing fairing damaged removing wing las
Details
       

 06-09-2008
2.50
fabricated and installed alum. brake lines
Details
       

 06-09-2008
0.50
clean up shop and put lots of tools away

 06-09-2008
1.00
brakes hoses all run
       

 06-08-2008
0.10
width at front of tire 102 1/8"....56"+ at center
     

 06-08-2008
1.00
set up toe in jig and measure, measure, measure
       

 06-08-2008
0.50
pull rest of brake parts and review manual

 06-08-2008
1.00
more jig work
Details
       

 06-08-2008
2.50
install brake calipers on each wheel
       

 06-08-2008
0.75
drill 4 - 1/4" holes in gear legs after setting pr
Details

 06-08-2008
0.50
braided hoses installed to pilot side pedals
Details
       

 06-08-2008
0.50


 06-08-2008
0.50

       

 06-08-2008
0.50


 06-08-2008
0.50

Details
       

 06-02-2008
0.10
torqued wheel bolts
Details
     

 06-02-2008
0.25
safety wiring brake bracket AN5 drilled head bolts
Details
       

 06-02-2008
1.00
remove left wing and position fuselage higher to m
Details

 06-02-2008
0.10
my faithful helper, Maggie
       

 06-02-2008
1.00
move rudder pedals forward .7 inch
Details
       

 06-02-2008
1.00
Mounted gear legs to fuselage
Details
       

 06-02-2008
0.25
Is this "cant" on the camber correct?
Details
       

 06-02-2008
0.50
installed flap motor
Details
       

 06-02-2008
0.25
gear legs ready to mount
Details
     

 06-02-2008
0.10
Cleveland brake calipers
     

 06-02-2008
5.00
assemble main gear wheels, mount tires; attach axl
Details
       

 06-02-2008
0.10
aft views with gear on
       

 05-19-2008
0.50
test fit right main gear fairing
Details

 05-19-2008
0.50
review quote and lead time from Performance Engine
Details

 05-19-2008
0.75
figure out and fabricate center shim
       

 05-19-2008
1.75
drill and pot bolts for flap motor; add 2 BID on f
       

 05-19-2008
1.50
build rudder pedals; too much paint on tubes
       

 05-19-2008
1.00
both tubes bolted in place
Details
     

 05-19-2008
1.00
aft (right) pedal tube clamped in place
Details
       

 05-18-2008
2.25
trim fairings, build flap control rods; drill fwd
       

 05-18-2008
1.00
torque flap tube and support bolts
Details
     

 05-18-2008
2.50
recut inside BIDS (measured right and cut wrong fo

 05-18-2008
1.50
install delrin flap stops
Details
       

 05-18-2008
0.50
finish up AC, rehang lights. etc.

 05-18-2008
0.10
drill forward spar hole to correct size; both side
     

 05-18-2008
0.50
decore and micro fuse supports that were opened up
       

 05-17-2008
8.00
install A/C
Details
       

 05-12-2008
0.75
general clean-up; fill epoxy pump; clean table; pu

 05-12-2008
1.50
flap controls
Details
     

 05-12-2008
0.50
figure out manuals and plan fo attack
Details

 05-12-2008
0.10
drawings instead of patterns of the manual calls f
       

 05-12-2008
0.10
cut all BIDS for both sides at once
     

 05-12-2008
2.50
add 16 BID to right side of aft seat support
     

 05-12-2008
1.50
ad micro due to large gap between right seat suppo
       

 05-11-2008
1.00
more hole alignment
       

 05-11-2008
1.00
install supports and guides - 4 of them
Details
       

 05-11-2008
2.00
Flap torque tube
       

 05-11-2008
2.00
enlarge hole to 1 1/2"
       

 05-11-2008
1.00
assemble flap torque tube
Details
       

 05-11-2008
1.25
align holes
Details
       

 05-11-2008
1.25

       

 05-10-2008
1.50
add 2 BID to left wing fairing; plan flap controls
Details

 04-28-2008
1.75
reposition wing and fuselage; cut glas for remaini
     

 04-28-2008
2.00
fit and trim top fairing and rib
Details

 04-28-2008
2.50
bond top fairing; flox on fairing/fuselage and mic
Details
       

 04-28-2008
2.00
apply BIDs to fairing rib and web; 10 BIDs in tota
Details
       

 04-27-2008
1.00
pull flap parts while waiting for micro to set up

 04-27-2008
2.50
micro wing left rib, trim add phenolic and final 2
       

 04-27-2008
1.75
bond left fairing rib/web to bottom fairing and fu
       

 04-26-2008
0.75
measure I/B aileron tube, rivet rod end
Details

 04-26-2008
1.75
Fit and trim fairing rib to left side; add 2 BID t
Details

 04-26-2008
1.00
finish running HVAC ducts downstairs
Details

 04-21-2008
0.25
full garb - working on fairing rib
Details
     

 04-21-2008
1.00
cleco left fairing in prep for bonding
Details
     

 04-21-2008
3.00
build and fit and fit and fit templates for web an
Details
     

 04-21-2008
1.00
bond left bottom wing fairing with flox
       

 04-21-2008
2.00
add webs to rib - micro
       

 04-07-2008
1.00
trim cover
Details
       

 04-07-2008
0.25
Not in the manual, but..........
Details
       

 04-07-2008
2.25
measure and build aileron tubes for left wing
Details

 04-07-2008
0.75
install nutplates with rivets - 6 places
Details
       

 04-07-2008
2.75
fit & trim left side wing fairings, cleco in
Details
       

 04-06-2008
1.00
pull parts for left wing aileron controls; begin f

 04-06-2008
0.50
misc. shop stuff

 04-06-2008
2.00
install elev. tunnel top
Details
       

 04-06-2008
2.00
fit, align and cleco top left wing fairing
Details
       

 04-06-2008
2.00
fabricate top for elevator pushrod tube cover
Details

 04-05-2008
1.50
pot in left elevator torque tube enclosure
       

 04-05-2008
2.00
Installed new air compressor
Details
       

 04-05-2008
1.50
install left side flap brackets; hang flap
Details
       

 04-05-2008
1.50
add 2 BIDs all around and micro'd cored out top

 03-30-2008
7.00
Elevator tube cover
Details
       

 03-30-2008
1.50
clean up and misc.
Details

 03-29-2008
0.50
trim clearance holes for elevator pushtubes

 03-29-2008
2.00
moved parts around...right to left
Details
       

 03-29-2008
2.00
measure and fabricate elevator torque tube to idle
       

 03-29-2008
1.00
make pattern for elevator tube enclosure
       

 03-29-2008
1.50
fabricate access panel in right fairing
       

 03-29-2008
2.00
complete elevator push tube and inboard aileron pu

 03-29-2008
0.10
Another shot of left wing now mated to fuselage
     

 03-28-2008
0.10
only 1 spot to enlarge - Right side
Details
     

 03-28-2008
1.00
installed elevator push tubes
       

 03-28-2008
1.00
install elevator torque tube
Details
       

 03-28-2008
2.00
fairing access panel and BIDs
Details
       

 03-28-2008
1.75
fabricate elevator push tubes
       

 03-28-2008
2.00
cut bulkhead supports for elevator pushtubes
Details
       

 03-23-2008
6.00
bond wing fairing web and ribs
Details
       

 03-23-2008
0.50
add phenolic for flap control; add 4 BID over top
       

 03-22-2008
0.75
rivet elevator idler
       

 03-22-2008
3.75
rib and webs for right wing fairing
Details
       

 03-22-2008
1.00
research elevator controls and build elev. idler
Details
       

 03-22-2008
1.00
prep fairing - will bond in tomorrow
Details
       

 03-22-2008
0.50
install elevator idler assembly aft of FS 185 in f
Details
       

 03-10-2008
2.00
make templates for fairing ribs and webs - right s
       

 03-10-2008
2.00
fitted parts to fuselage
       

 03-10-2008
1.00
finish inboard portion of aileron push tubes
       

 03-10-2008
1.50
de-core ribs and webs
       

 03-10-2008
2.00
cut pre-peg
       

 03-09-2008
4.00
prep and install right side wing fairings
       

 03-09-2008
0.50
outboard aileron tube; ready to drill
     

 03-09-2008
1.00
Lynn and I removed right wing to access push tubes
     

 03-09-2008
1.00
fabricate outboard aileron tube, right side
       

 03-09-2008
1.50
fabricate interior aileron bellcrank tubes
     

 03-08-2008
1.00
made another pass at fitting right wing fairing
       

 03-08-2008
0.10
installed control sticks to aileron torque tube
Details
       

 03-08-2008
2.00
install flap brackets
Details
       

 03-08-2008
3.00
hang right alieron
Details
       

 03-08-2008
1.00
fabricate outboard aileron push tubes
       

 03-08-2008
1.00
aileron bellcrank in wing after push rod installat
       

 02-25-2008
1.50
trim lines for 1st pass cutting fairings
Details
       

 02-25-2008
2.00
test fitting top and bottom wing fairing - right s
       

 02-25-2008
1.00
Remove incorrect 4080 part-manual wrong
Details
       

 02-25-2008
2.00
re-install correct fwd aileron support #1105
Details
       

 02-25-2008
0.50
added end to long aileron push tube; drilled holes

 02-24-2008
2.50
re-engineer forward support #4080
Details
       

 02-24-2008
1.50
Grind areas for aileron clearance
Details
       

 02-24-2008
2.00
epoxy/micro forward supports
Details
       

 02-24-2008
2.00
drill access holes for aileron pushrods
Details
       

 02-23-2008
0.20
leveled up fuselage with right wing on
Details
       

 02-23-2008
0.50
Lay out holes for aileron tube
Details
     

 02-23-2008
6.50
install aileron forward supports
Details
       

 02-17-2008
2.00
hang left wing, mate right wing
Details
       

 02-17-2008
5.50
apply 9 BIDs for aft seat belt
       

 02-17-2008
1.00
apply 5 BID to both aileron front supports
       

 02-16-2008
1.50
set up epoxy pump; level fuse
Details
       

 02-16-2008
1.00
floxed in hard points for aft seat belt
Details
     

 02-16-2008
0.50

Details
       

 02-15-2008
3.50
Sorted aileron control parts; worked on Fwd ailero
Details
       

 02-15-2008
1.50
Cut out core for aft seat points hard points
       

 02-15-2008
1.00
cut all BIDs for aileron support and seat belt har
Details
     

 02-10-2008
4.00
Organized and stored parts
Details
       

 02-10-2008
0.50
Laid out hard points for aft seats belts, cut phen
Details

 02-09-2008
5.00
Moved kit from Capital City to Porter's Ridge
Details
       

 02-05-2008
1.00
Unload trailer from Partain - finally
Details
       

 02-05-2008
0.50
Most of the kit in the hangar...wings set on horse
       

 01-25-2008
0.10
Kit finally picked up
Details

 01-06-2008
0.10
this will be my building home
Details
       

 01-06-2008
3.00
finish up getting workshop ready
Details
       

 01-05-2008
3.00
Build Fuse cradles and misc. workshop - while wait
Details
       

 12-30-2007
8.00
Finsh set up of shop
Details

 12-23-2007
3.00
continue set up of shop; build engine stand to tur
Details

 12-21-2007
1.00
Ready to BID inside of windows - 2 BID
       

 12-21-2007
1.00
prep elevator; enlarge acces to bolts stab/elevato
       

 12-21-2007
6.00
fitting and setting elevator
       

 12-21-2007
0.10
Bob Carter's favorite place - Timber Inn, Route 97
Details
     

 12-21-2007
1.00
add phenolic block for up and down elevator travel
       

 12-21-2007
1.00
add phelonic block for elevator stops
       

 12-21-2007
6.00
add 2 BID around all windows
     

 12-20-2007
3.00
work on wing tips until top fuselage can be lifted
Details
       

 12-20-2007
0.10
scope out dimensions for fusleage cradle that will
Details
       

 12-20-2007
0.10
pix after door bond
Details
       

 12-20-2007
0.10
more after bonding door pics
       

 12-20-2007
2.00
finish up elevator BIDs
       

 12-20-2007
3.00
bond in door
     

 12-19-2007
3.00
Micro around windows add 4" wide 4 BID around wind
Details
       

 12-19-2007
4.00
fit door frame and door
Details
       

 12-19-2007
0.50
door seal pump motor
Details
       

 12-19-2007
0.50
Door is fitted,ready to prep and add BIDs
Details
       

 12-18-2007
1.00
prep windshield for bonding
Details
       

 12-18-2007
4.00
bond in windows and windshield
Details
       

 12-18-2007
2.50
apply 2 BID to leading edge of Horiz Stab
Details
       

 12-18-2007
2.00
add 2 BID to elevators' leading edges
       

 12-17-2007
2.00
Trim right side of upper fuselage
Details
       

 12-17-2007
1.00
Stabilizer ready for final 2 BID
Details
     

 12-17-2007
2.00
Screwed up window application
Details
       

 12-17-2007
1.00
Sand and prep fuselage for bonding of windows & w/
Details
       

 12-17-2007
1.00
Resulting fix to elevator
Details
       

 12-17-2007
1.00
repair some bubbles in in LW flap trailing edge.
Details
       

 12-17-2007
2.00
Prep 2nd set of windows for bonding
Details
     

 12-17-2007
0.10
Fuselage mated after trimming right side to acheiv
Details
     

 12-17-2007
0.50

Details

 12-16-2007
0.10
Old Columbia plant in Bend OR, now ownes by Cessna
Details
       

 12-14-2007
80.00
Working assitant during builder assist at Lancair

 12-14-2007
1.00
Sand window openings; add 45 degree bias

 12-14-2007
2.00
prep and close Horizibtal Stabilator
       

 12-14-2007
4.00
Left elevator mistake
Details
       

 12-14-2007
4.00
add micro fillet to trailing edges; add 2 bid
       

 12-13-2007
2.00
pressure test fuel tanks in RW
Details
       

 12-13-2007
2.00
Prep stab for closing tomorrow
Details
     

 12-13-2007
1.00
Prep and square window openings
Details
       

 12-13-2007
2.00
Prep and close elevators
       

 12-13-2007
2.00
Close elevators
       

 12-12-2007
8.00
prep Horiz Stab and elevators
       

 12-12-2007
6.00
Prep and close right wing
       

 12-12-2007
0.50
moving fuselage over from prep shop to main build
       

 12-12-2007
0.10
more scenery pics
       

 12-12-2007
0.10
more pics - Madras
       

 12-12-2007
1.50
demo flight in N407L
Details
       

 12-11-2007
4.00
prep RW - top
Details
       

 12-11-2007
4.00
prep RW - bottom skin, COM antenna & AOA detail
Details
       

 12-11-2007
1.00
Inventory parts with Tory
Details

 12-11-2007
7.00
close out Left wing
Details
       

 12-10-2007
14.00
Day #1 Builder Assist - Left wing
Details
       

 12-10-2007
2.00
Day #1 - Sanded skin, spars, and caps for Stab
Details

 12-07-2007
2.00
add 2 BID to LW joggle
     

 08-14-2007
1.00
ES Kit ordered
Details
       