KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
Work Logs Found: 633
Category Work Time: 915 Hours
 Date
Hours
Work Log Summary

Details

 07-08-2019
1.00
try alternate strut ball placement
Details
       

 07-08-2019
1.00
re-install baggae door
Details
       

 07-06-2019
2.00
flox in bracket; add 2 BID
Details
       

 07-06-2019
2.00
fab strut attach bracket
Details
       

 06-27-2019
1.25
plan placement' drill hinge for stud; fab phenolic
Details

 06-26-2019
0.00
Order parts for baggage door strut mod
Details

 04-23-2018
1.50
replace front door spindle & adjust latches
       

 04-11-2018
1.50
attempt to repair spindle in door handle
Details
       

 09-09-2013
3.25
prep and micro inside of fuselage
Details
       

 09-09-2013
0.25
clean up flox release at seat pans
       

 03-18-2013
3.50
rehang door and adjust pump
       

 03-18-2013
0.00
mess with door seal pump; adjust, troubleshoot
Details
       

 03-17-2013
0.00
turn 1/2 turn CCW
Details
     

 03-17-2013
4.00
pull door; prep to install door seal
       

 03-17-2013
0.00
modify caulk gun to apply silicone
Details
       

 03-17-2013
2.50
Install door seal with silicone adhesive
Details
       

 03-17-2013
0.00
door seal install continued
       

 10-27-2012
2.50
belly antenna; replace B battery
Details
       

 10-17-2012
0.00
fair in cowling front edge; reattach spinner backi
Details
       

 10-17-2012
0.00
cowl inlet measurements
       

 10-17-2012
4.00
continue work on cowl inlets
Details
       

 10-14-2012
4.50
ground plane strips to belly; continue cowl inlet

 10-08-2012
4.00
sand & shape cowl inlets; coat #2 of Super-fill
Details
       

 09-23-2012
2.00
prep and add super-fill antenna ground plane
Details
     

 09-23-2012
2.50
bodywork cowl inlets
Details
       

 09-17-2012
4.25
modify cowl inlets
Details
       

 09-17-2012
3.75
1 BID to COM belly antenna copper strips
Details
       

 09-05-2012
2.00
3 BID to opposite cowl inlet halves
       

 09-03-2012
2.00
3 BID to half of cowling inlets
Details
       

 08-27-2012
3.00
WLS primer to rest of parts/fuselage
Details
       

 08-27-2012
5.75
WLS primer to interior
Details
       

 05-21-2012
0.25
sand lower cowl flange from spinner rub
     

 05-20-2012
0.50
add temp. weatherstrip to front door
Details
       

 05-09-2012
1.00
seats and interior panels back in
Details
     

 05-07-2012
1.50
WLS to floor, flaps and nose fairing
Details
       

 04-16-2012
1.00
micro upper fuselage joggles - both sides
Details
       

 04-02-2012
1.75
sand lower cowl; 3 BID thin spot
Details

 04-02-2012
1.75
modify nose strut fairing
Details
       

 04-02-2012
1.75
add'l nose fairing; re-install seats & panels; RTV
Details
       

 03-31-2012
2.00
seats & panels out; misc. fine tune items
Details
       

 03-31-2012
1.25
core out aft panel; flox to lower panel flange
Details
       

 03-26-2012
1.25
install clips to hold tow bar
Details
       

 03-19-2012
2.50
re-install parking brake and re-bleed system
       

 03-19-2012
1.00

Details
       

 03-12-2012
2.25
various small tasks for rest of a beautiful day
Details
       

 03-11-2012
0.25
tape bottom wing fairing; check engine bolts
Details

 03-11-2012
0.00
placard door seal switch
Details
     

 03-11-2012
1.25
cowling on, wheel pants in position
Details
       

 03-03-2012
5.25
misc. tasks; condition inspection
Details

 02-25-2012
1.00
Rosen visors in and misc shop
Details
       

 02-25-2012
0.50
mount registration card; compass card
       

 02-25-2012
0.50
install step
Details
       

 02-25-2012
0.50
clean windows with Sumner 210 from ACS
Details

 02-20-2012
1.75
modify fuel tunnel
       

 02-20-2012
2.00
modify and redo/install seats and forward interior
Details
     

 02-13-2012
0.00
INTERIOR PANEL INSTALL ORDER
Details

 02-13-2012
1.75
interior close-outs; seat belts; seats in
       

 02-13-2012
1.75
add'l interior close-outs
       

 02-13-2012
1.75
add'l interior close-outs
       

 02-13-2012
1.75
add'l interior close-outs
       

 02-12-2012
1.25
start installing all panels for inspection
       

 02-12-2012
0.75
sand, prep & prime delrin door guide area
       

 02-11-2012
2.50
fit & trim left side interior panels
Details
       

 01-30-2012
0.25
velcro door strap & registration packet
Details
       

 01-30-2012
0.25
temporarily placard AOA, static, oil capacity
       

 01-30-2012
0.50
pressurize nose strut; ~300#...1.5" extension
Details

 01-30-2012
2.75
install front lap & shoulder belts; clean door han
       

 01-30-2012
1.50
adj door pin, prep and flox in
       

 01-30-2012
0.00
add'l seat belt installation pics
       

 01-29-2012
1.00
true up aft end of top cowl;reinstall cowlings
       

 01-29-2012
0.50
temp. bolt L front seat in

 01-29-2012
1.00
loctite all jam nuts within fuselage
Details

 01-28-2012
0.75
finish installing overhead console with SS cap scr

 12-24-2011
0.50
use old Maggie leash for door pull down strap
Details
       

 12-24-2011
4.25
level and micro bubble level in; drain fuel; measu
Details
       

 12-24-2011
0.00
add'l pics...bubble level micro'd in; nose strut
       

 12-19-2011
3.25
prep & prime cowling and wheel pants
Details
       

 12-18-2011
3.00
remove forms, sand, apply s/f #2
       

 12-18-2011
0.25
paint o/h console and screws....blue; close match
Details
       

 12-17-2011
3.00
grind/sand lower cowling flange
       

 12-17-2011
0.25
epoxy to top of aft seat parts
Details
     

 12-17-2011
0.00
build forms for bodywork to top cowling
       

 12-11-2011
0.25
reverse door strut again
Details
     

 12-05-2011
0.25
work on door strut
Details
     

 12-05-2011
0.50
start OH console panels; drill
       

 12-05-2011
0.00
right side top cowl pics
Details
       

 12-05-2011
2.00
fit, trim & mark top cowling > adding new flange;
       

 12-05-2011
1.00
attach eyeball vents to OH console panels
       

 12-05-2011
1.25
adels to brake line & install left armrest
       

 11-30-2011
0.50
micro flange... low spots and weave
     

 11-30-2011
1.50
micro armrest edges and hard points
     

 11-30-2011
2.00
2 BID to top cowling foam
       

 11-26-2011
0.50
trim front door jamb
Details
       

 11-26-2011
2.50
replace strut; remove parking brake and re-bleed;
Details
       

 11-26-2011
0.00
foam applied for cowl flange rebuild
     

 11-26-2011
1.50
fit and trim top cowl; super glaue foam on for lay
Details
       

 11-07-2011
2.50
fabricate left armrest
Details
       

 11-07-2011
2.25
apply N numbers
Details
       

 10-31-2011
1.00
install baggage door bolts and seal
       

 10-24-2011
1.50
misc tasks to finish up day
Details

 10-24-2011
1.00
install front door lock and door access cover
Details

 10-24-2011
0.50
install 14oz Halon fire extinguisher under and fro
       

 10-17-2011
0.50
scrape foam blobs off all surfaces...ready to sand

 09-21-2011
2.50
Plan B for defroster & glare shield
Details
       

 09-05-2011
0.75
install aft seats belts
Details
       

 08-29-2011
0.25
pull out defroster; sand prep for flox in

 08-29-2011
0.75
prep & epoxy front floor boards

 08-28-2011
1.50
prep and epoxy prepreg areas
Details
       

 08-28-2011
2.00
fool with defroster install...tight

 08-27-2011
0.50
thread rudder stop bolt; fool with GPS
Details
     

 07-28-2011
1.25
re-attach both control sticks; used new AN4-25 bol
Details
       

 07-25-2011
0.50
clean up gook on windows; fridge from Duncan
Details

 07-11-2011
2.75
sand, tape & micro window fillets
       

 07-11-2011
1.50
sand down ELT door to fit
Details
       

 07-11-2011
0.00
add'l fillet prep
       

 07-10-2011
9.50
tape-grind-sand-prep-s/f window fillets
Details
       

 07-10-2011
0.00
super-fill window fillets - add'l pics
       

 07-04-2011
0.75
visor mounts; fit and tap 1 hole
Details
       

 07-04-2011
2.50
paint defroster; pull window paper
Details
       

 07-04-2011
0.00
behind panel shots thru windshield
       

 07-04-2011
0.00

Details
       

 06-17-2011
3.25
pinhole hunting; sand-prep-super-fill
Details
     

 06-13-2011
5.75
sand, s/f, vac, prep & WLS primer
       

 06-12-2011
1.75
vac, prep. & superfill fuselage low grain/spots

 06-12-2011
2.50
sand fuselage and HS in prep for another WLS prime
       

 06-12-2011
1.00
s/f fillet to inside door jamb
       

 06-12-2011
0.00
leveling marks - add'l pics
Details
       

 06-12-2011
0.50
level & install permanent leveling marks
Details
       

 06-12-2011
0.75
door strut back on & misc
Details
       

 06-12-2011
0.00
add'l leveling mark pics
Details
       

 06-05-2011
3.00
WLS primer to fuselage, VS and HS root
       

 06-05-2011
0.00
fit lock to door and check tab
Details
       

 06-05-2011
0.75
fab lock tab for front door
Details
       

 06-05-2011
2.00
Add'l primer pics; Ned Smith visited
Details
       

 06-04-2011
1.75
sand all of fuse, VS and HS....vacuum..ready for W
Details

 06-03-2011
3.25
sand fuse and door jamb
Details

 05-22-2011
1.00
hysol/flox aileron stops to fuse wall
       

 05-22-2011
1.50
figure out & fab aileron stops
Details
       

 05-22-2011
0.75
another pass of super-fill
Details
       

 05-16-2011
0.75
pop baggage locks, sand, fit, good!
       

 05-16-2011
0.00
baggage locks cont'd
       

 05-16-2011
4.50
add'l prep and bodywork
Details
       

 05-15-2011
3.25
trim baggage blocks; sand; work on inside door jam
       

 05-15-2011
2.00
sand, prep, vac. door hinge; fuselage elev plate a
       

 05-15-2011
0.25
misc super-fill of fuselage; hinge area; baggage

 05-14-2011
1.50
door hinge release; 3 BID delrin baggage blocks
       

 05-09-2011
1.50
super-fill #3 to fuselage joggle
Details

 05-09-2011
1.75
more baggage door work - flox in delrin blocks, et
Details
       

 05-09-2011
1.25
baggage door locks
Details
       

 02-07-2011
0.75
lift fuselage top up on horses
Details
       

 02-07-2011
3.25
fit & trim actual side panels
Details
     

 02-07-2011
2.50
final trim,rig, apply 2 BID flanges
Details
       

 02-07-2011
1.25
do last panel- front right side
Details
       

 02-07-2011
0.75
2 BID flange on aft seat cover
       

 02-05-2011
0.75
split forward cover into 2 pieces
Details
       

 02-05-2011
1.50
make cover for brake lines
Details
       

 02-05-2011
1.25
2 BID side panel extensions
Details
     

 02-04-2011
4.50
interior side panels
Details
       

 01-31-2011
0.75
trim & sand rest of micro'd parts
       

 01-31-2011
1.25
retighten fuel hoses
Details
       

 01-31-2011
0.75
grind and sand co-pilot stick opening
Details
       

 01-31-2011
2.00
check hardware all elev rod ends; set jam nuts
Details
       

 01-31-2011
0.75
aileron servo rod - bent threaded portion
Details
       

 01-30-2011
0.75
trim out o/h vent fairing
       

 01-30-2011
0.75
pop off o/h vent fairing lay-up; clean
       

 01-30-2011
1.25
micro copilot stick cut out; seat belt slo
Details
       

 01-29-2011
0.75
wing spar cover
Details
       

 01-29-2011
1.75
vent fairing to aft o/h console
Details
       

 01-29-2011
1.00
decore and micro edges - various pieces
     

 01-24-2011
0.50
trim baggage bracket layups; drill #12 hole for ha
Details
       

 01-24-2011
0.50
release tape vent area at hat rack for layup
Details

 01-24-2011
0.50
add 3 BID to inside faces of baggage door brackets

 01-23-2011
1.00
set baggage brackets and 3 BID outsides
       

 01-23-2011
0.75
micro edges of hat rack and elev TT cover
     

 01-23-2011
1.50
make baggage brackets; trim joggle
Details
       

 01-23-2011
0.75
figure, measure and cut aft seat belt access hole

 01-23-2011
1.00
elev. rigging; cut co-pilot stick hole
Details
       

 01-17-2011
1.25
vertical hat rack
Details
       

 01-17-2011
0.75
horizontal part of hat rack
Details
       

 01-17-2011
0.00
horizontal hat rack installed
     

 01-17-2011
0.50
fit elev torque tube cover; grind to fit

 01-17-2011
0.50
aft seat back latches
       

 01-17-2011
0.00

     

 01-16-2011
0.25
modified cable nut to heat on/off valve
       

 01-16-2011
0.75
mark, drill and grind 6 BID hat rack flange
       

 01-16-2011
0.50
hardpoints to vertical hat rack
     

 01-16-2011
0.50
fool with missing parts for baggage door
Details

 01-16-2011
1.50
fit & drill aft seat latches; do hardpoints
Details
     

 01-16-2011
0.50
file shoulders down on cable nuts
Details
       

 01-16-2011
2.75
fab hat rack bottom; 4 BID flange
Details
       

 01-16-2011
1.25
bond 6 BID flange for hat rack to fuselage top
       

 01-15-2011
1.50
prep vertical hat rack for bonding
Details
       

 01-15-2011
1.50
plan and make template for hat rack vertical
     

 01-15-2011
0.00
ordered these cable nuts for parking brake and hea
Details
       

 01-15-2011
1.25
micro aft seat bottom; grind baggage pads
Details
     

 01-15-2011
0.75
cable nut installs
Details
       

 12-27-2010
0.50
seat bottom off - check flox release
Details
       

 12-27-2010
1.25
prep phenolic pad, flox and 2 BID
       

 12-27-2010
2.25
3 BID aft seat stiffener; plan seat latches & mark
       

 12-26-2010
3.00
wire up flap motor and switches; grind seat cleara
       

 12-26-2010
1.75
sand seat back square & bond stiffener on
       

 12-26-2010
0.00
re-install flap motor
       

 12-26-2010
0.75
grind seat clearance holes; flox release aft seat
Details
       

 12-23-2010
0.00
micro another edge of seat back and stiffener
     

 12-23-2010
1.75
flox release was not good...will redo; grind and m
Details
       

 12-20-2010
1.25
flox release aft seat botton; hard point; fill hol
     

 12-20-2010
2.50
cut seat back stiffener and seat back; prep; micro
       

 12-19-2010
1.50
reverse rudder cables; turnbuckles to rear
Details

 12-13-2010
3.00
prep door frame for 2 BID to console
       

 12-13-2010
0.00
add 2 BID to bond o/h console to door frame
Details
       

 12-12-2010
1.25
sand and prep o/h for flox; primer coat #4

 12-12-2010
1.75
primer #2 to o/h; wire ties and flex hose
       

 12-12-2010
1.50
flox in o/h console
       

 12-12-2010
0.00
add'l floxing in pics
       

 12-12-2010
0.50
2 coats of clear coat to o/h console

 12-11-2010
0.75
sand o/h console and primer coat #1
     

 12-11-2010
0.50
primer #2 to o/h console; adels and ties to panel
     

 12-06-2010
1.25
tygon tube for conduit for door seal pump wires
       

 12-06-2010
1.00
super-fill #2 to o/h console; s/f #1 to defroster

 12-06-2010
2.50
sand & trim o/h console; cut to fit
       

 12-06-2010
0.00
long view of rudder pedals with all brake hardware
     

 12-06-2010
1.00
finish up brake cylinder hardware
Details
       

 12-05-2010
1.00
super-fill holes in o/h console
     

 12-05-2010
0.75
sand and prep defroster for super-fill
     

 12-05-2010
2.75
parking brake bracket and finish fresh air ducting
Details

 12-04-2010
0.00
test fit o/h console
       

 12-04-2010
1.75
flox parking brake bracket
Details
       

 12-04-2010
1.50
finish fresh air hose adel clamps; flip fuse
Details
       

 12-04-2010
1.75
clamp up heat scat tubing
Details
       

 12-01-2010
1.00
work on figuring out parking brake cable connectio
Details
       

 12-01-2010
0.00
Matco parking valve diagram
Details
       

 11-30-2010
2.00
run heat-defrost mix cable
       

 11-30-2010
2.00
heat system
       

 11-30-2010
0.00
heat and defrost valves
Details
       

 11-28-2010
0.50
heat tube work; tee's, grind hole to aft seat

 11-27-2010
4.00
engineer and run fresh air and heat lines
Details
       

 11-26-2010
0.50
micro flange in fresh air T
       

 11-26-2010
1.50
fresh air system; make T 2 1/4" to 1 3/4"
       

 11-26-2010
1.25
add 2 BID to make T adapter
       

 11-21-2010
1.50
work on heat-defrost-fresh air layout
       

 11-08-2010
0.50
prep & flox seat strips
Details
     

 11-08-2010
2.75
heat/defrost system
Details
       

 11-08-2010
1.00
cut off defroster; touch up holes
       

 11-07-2010
1.00
flox defroster close out and 1.5" tube for hose
       

 11-07-2010
2.75
bond R armrest; prep and measure for BIDs

 11-07-2010
1.50
add 2 BID tapes to top and bottom of all arm rests
       

 11-06-2010
3.75
heater-defrost-glare shield
Details
       

 11-01-2010
2.00
prep & bond both aft armrests
Details
       

 10-31-2010
0.75
undo aft seat belt gusset
Details
       

 10-31-2010
0.75
top on to measure for arm rests
       

 10-31-2010
0.00
not much room in glareshield area!
       

 10-31-2010
3.50
fit armrests; cut & micro; ready for bonding
       

 10-31-2010
1.75
fit and measure for armrests
Details

 10-31-2010
0.75
add handles to fuse to aid in handling
       

 10-30-2010
2.00
add aft seat belt gusset; attach handles
Details
       

 10-18-2010
0.75
fit and micro ELT access door
Details
       

 10-03-2010
0.75
prep for 2 BID for static port
Details
     

 09-27-2010
1.00
flox in FU1 static port
       

 09-27-2010
1.75
figure out static port and pull parts; bend pitot
Details
       

 08-16-2010
1.25
rotate fuse and level; install rotissirie
       

 08-16-2010
0.00
level fuselage
       

 07-18-2010
0.50
repin castelated nuts for both front seats
       

 05-03-2010
1.00
add holes to magnetomter shelf and micro in
Details
       

 05-02-2010
1.25
work on avionics shelf layout; micro aft of magnet

 05-01-2010
1.25
sand seat belt floxing; add micro pads to mag. she
       

 05-01-2010
1.75
design and rough up shelf for magnetometer
       

 04-26-2010
1.50
servo pads; drill 7/8" holes for harness cable; cl
Details
       

 04-25-2010
5.00
sand and prep cowl and nose fairing; WLS #2
       

 04-25-2010
1.00
add 2 BID to AP servo phenolic blocks
     

 04-19-2010
1.75
super-fill pin holes on cowls, mostly on top cowl

 04-18-2010
5.00
sand cowl and nose fairing, prep, WLS #2

 04-18-2010
3.00
prep cowl, WLS primer #1
       

 04-12-2010
1.50
sand cowls and nose wheel fairing again

 04-11-2010
1.25
super-fill cowl and nose leg fairing #2+

 04-11-2010
0.00
super-fill applied to cowl seams
       

 04-11-2010
3.50
sand cowl seams after super-fill
       

 04-11-2010
3.00
fit for cowling seams
       

 03-28-2010
1.00
mark & measure a/p servos; measure for harness
Details
       

 03-28-2010
0.75
grind and sand fuselage/cowling joggle

 03-28-2010
1.75
fit and trim oil door; sand cowlings again
Details
       

 03-28-2010
2.75
bodywork cowling and nose gear fairing
Details
       

 03-15-2010
0.00
seat belts holes
Details
       

 03-15-2010
5.50
sand cowl halves; super-fill #2
Details
       

 03-15-2010
0.50
figure interior panel measurements so I can order
Details

 03-15-2010
2.75
figure front seat belts and drill holes
Details
       

 03-14-2010
1.75
Super-fill #1 to both cowl halves
       

 03-14-2010
2.75
prep cowl halves for fill
       

 03-14-2010
2.00
micro bottom of cowl spinner flange
Details
       

 03-14-2010
3.00
fit & trim lower cowl spinner flange
Details
       

 03-08-2010
2.00
trim and refit cowl
Details
       

 03-08-2010
1.00
additional pics - skybolts installed
       

 03-08-2010
2.50
add .2" micro to front lower cowl spinner flange
Details
       

 03-07-2010
1.50
skybolts to aft nose gear fairing
Details
       

 03-07-2010
1.75
shape foam and add 1 BID, peel ply
     

 03-07-2010
1.50
scarf clark foam to left side of cowl
Details
       

 03-07-2010
0.50
retack foam pieces
       

 03-07-2010
1.50
decore and super fill oil door and opening
       

 03-07-2010
1.00
add nutplates to nose inlet
Details
     

 03-07-2010
0.00

       

 02-22-2010
2.75
rest of cowl skybolts; nutplate for inlets
       

 02-22-2010
2.00
fit nose fairing to lower cowling
       

 02-22-2010
2.00
fit and align nose gear fairing
Details
       

 02-22-2010
0.00
add'l pics.. skybolts to nose fairing
       

 02-21-2010
3.00
skybolt installation continued
       

 02-21-2010
3.25
install skybolts for cowling
Details
       

 02-21-2010
3.00
install rest of skybolts including studs
Details
       

 02-21-2010
1.00
fit and trim nose gear fairing
Details
     

 02-15-2010
1.50
make jig for Skybolts; fool with rivets
Details

 02-15-2010
3.00
drill rivet holes and enlarge pilot to 15/32
Details
       

 02-15-2010
1.50
cut and grind access in fuse double joggle
Details
       

 02-15-2010
0.00
Add'l Skybolt drilling pics
       

 02-15-2010
1.00
1 BID over rivets for oil access door
     

 02-14-2010
0.10
spinner alignment issue
Details
       

 02-14-2010
2.00
oil door; decore for hinge and cut; rivet hinges o
Details
       

 02-14-2010
2.50
fit cowling;layout holes for skybolts; drill & cle
Details
       

 02-14-2010
1.75
cut and rivet in Hartwell hinge for oil door
Details
       

 02-13-2010
3.25
decore for oil door latch; 4 BID flange
       

 02-05-2010
0.00
pics of top gap fuse to fuse joggle; flange width
Details
       

 02-05-2010
0.50
cut oil access door; add 4 BID

 02-05-2010
6.50
continue cowl fitting and cutting
Details
       

 02-05-2010
0.00
add'l pics
Details
       

 02-05-2010
0.00

       

 02-04-2010
5.00
fit upper & lower cowling; 1st pass trimming
Details
       

 01-31-2010
7.50
relocate fuselage to hang engine
Details
       

 01-31-2010
0.00
level fuselage in prep to mount nose strut
       

 01-31-2010
1.00
layout cowl cuts
Details
       

 01-25-2010
4.50
final sand, prep and prime fuse sides
Details
       

 01-24-2010
1.00
sand right fuselage; super-fil #3

 01-24-2010
2.75
sand fuse sides; prep and apply super-fil

 01-24-2010
2.00
rivet 12 nutplates to each opening
Details
       

 01-24-2010
0.25
micro small dimple in aft R fuselage
       

 01-24-2010
1.00
2 BID inside of NACA scoop flange
Details
       

 01-24-2010
1.00

Details
       

 01-18-2010
2.50
WLS primer to fuselage bottom; 2 coats
Details
       

 01-18-2010
0.00
flox in air inlet to console
Details
       

 01-18-2010
2.50
final sand of fuselage bottom & prep for WLS prime

 01-18-2010
1.50
fabricate air inlet for console; flox in place
     

 01-17-2010
3.25
sand fuse bottom; trim flap cover flange repair
Details
       

 01-17-2010
1.25
prep & S/F #3 fuselage bottom

 01-17-2010
1.50
design & fabricate fresh air vent tube from o/h co
Details
       

 01-16-2010
1.50
WLS # 2 bottom of ailerons & elevators
     

 01-16-2010
1.75
prep and S/F #2 to fuselage bottom

 01-11-2010
2.75
sand fuse bottom
Details
       

 01-11-2010
2.00
fit & trim access covers; vac. fuselage
       

 01-11-2010
2.00
fairing access covers; fit, fix and trim
Details
       

 12-26-2009
1.25
super-fil pass #1 to fuselage bottom
       

 12-26-2009
1.25
seats off, roll fuse; fit flap,aileron,tip
Details
       

 12-26-2009
1.25
sand & prep fuse bottom for super-fil #1

 12-26-2009
1.00
clean up step bracket and re-do aft air vent drain
       

 12-21-2009
0.50
trim elev torque tube cover

 12-21-2009
1.00
fit & trim elev tube access holes in aft seat flan
       

 12-21-2009
1.00
decore and micro elev holes in aft seat flange
       

 12-14-2009
2.00
drill holes and add 10-32 rivnuts to torque tube c
Details
       

 12-14-2009
0.75
cut 4 BID fir elev. cover
Details

 12-14-2009
1.75
4 BID to elev. torque tube cover
       

 12-13-2009
0.50
prep & micro fwd edge of elev. TT cover
     

 12-07-2009
1.75
flox in parking brake valve; 2 BID
       

 12-07-2009
1.00
figure brake fittings and connect brake lines
Details
       

 12-07-2009
1.25
fabricate top elev tube cover
       

 12-07-2009
2.50
design/fit elev. torque tube cover
Details
       

 12-07-2009
0.00
add'l parking brake pics
       

 11-29-2009
1.00
design and fit parking brake
Details
       

 11-29-2009
1.25
2 BID aft seat flange - aft side
Details
       

 11-28-2009
1.00
riv-nuts for top part of hinge
Details
       

 11-28-2009
1.25
drill and rivit aft seat hinge
Details
       

 11-14-2009
1.50
6 BID flange for folding seat back
Details
     

 11-09-2009
1.50
bond in lower seat back, 2 BID flange/fuselage
       

 11-02-2009
0.50
figure parking brake; dev. parts needed list

 11-02-2009
1.00
continue on aft seat back geometry
       

 11-02-2009
1.25
bond in aft seat flanges with flox
       

 11-01-2009
1.75
prep 3 BID and 4 BID for at seat
Details
       

 11-01-2009
1.25
3 BID front of seat back flange and flip L wing ov
     

 10-26-2009
2.75
fabricate and prep at seat flanges, etc
Details
       

 10-26-2009
2.00
apply 18 BID to fwd seatbelt gusset
Details
     

 10-18-2009
3.00
forward seat belt gusset
Details
       

 10-18-2009
3.00
figure/design rear saet flange
Details
       

 10-18-2009
1.00
cut 4 sets of 9 BID for fwd gusset-seat belt

 10-05-2009
1.50
sand r fuse, s/f #4

 09-28-2009
2.75
sand right fuselage; s/f #2

 09-27-2009
1.25
sand R fuselage and super-fill
     

 08-30-2009
0.75
sand left fuselage again
 

 08-30-2009
2.00
sand and prep right side of fuse for micro
       

 08-30-2009
2.00
place and drill hole for tail tie down ring
Details
       

 08-30-2009
0.25
grind out i/s of naca vent
     

 08-17-2009
3.50
sand fuselage - round #2
Details
       

 08-16-2009
2.00
sanded and Super-filled left side of fuselage...mo
Details
       

 08-10-2009
0.50
grind excess micro from NACA scoop
Details
       

 08-03-2009
1.00
Decore & micro NACA scoop; pull clecos
     

 08-02-2009
0.10
place NACA scoop on left side of fuselage
Details
       

 08-02-2009
0.50
figure out where to put NACA fresh air scoop
Details
       

 08-02-2009
2.75

Details
       

 07-20-2009
0.75
micro floor boards, 2nd pass
       

 07-12-2009
1.75
test fit 1:1 panel print out
Details
       

 07-12-2009
0.10
panel pics #3
       

 07-12-2009
0.10
more panel fitting pics
       

 07-12-2009
0.50
drill battery box holes;
       

 07-12-2009
0.75
2 BID FS185 to fuselage
       

 07-06-2009
1.50
fabricated battery box hardpoints & shims
Details
       

 05-11-2009
2.00
mount rotisserie with Phil's help
Details
       

 05-11-2009
2.00
fit rotisserie and cut floorboards for bolt access
       

 05-10-2009
2.50
Begin set up of rotisserie

 04-12-2009
0.50
research 740 and 720 black cables; measure all cab
Details
       

 04-12-2009
0.50
remove panel; pack up to take to SNF for Aerotroni

 04-12-2009
0.10
measurements for panel shop
       

 04-12-2009
1.00
instrument panel fit #2
       

 04-12-2009
0.75
install 2 nutplates to 4 BID bracket on each side
       

 04-12-2009
1.00
fit instrument panel
Details
       

 04-11-2009
0.75
pul parts for panel install.

 04-11-2009
1.00
pop use top; fit panel bank
       

 04-11-2009
1.00
fit fuselage
Details
       

 04-11-2009
1.00
fit & trim panel to fuselage; 2 screws each side t
       

 04-11-2009
2.00
after adding 4 BID for flanges
       

 03-09-2009
0.50
pop bellcrank bolt off; redrill hole
Details

 02-21-2009
1.25
grind out elev hole; grind/trim bellcrank platfrom
Details
       

 02-16-2009
1.25
figure and grind hole for elevator push rod to VS
Details
       

 02-01-2009
2.00
drill for elev. weldment inspection panel
       

 02-01-2009
2.25
1 ah shit (see pic), install all 14 nutplates
Details
     

 01-25-2009
1.00
put fuselage top on; cleco and bolt
Details
       

 01-24-2009
0.50
trim fuel tunnel; rivnut fuel selector
Details
     

 01-24-2009
2.50
fuel tunnel and floorboards
Details
       

 01-24-2009
0.50
add ad'l micro to floorbaord transition

 01-18-2009
2.00
level fuse, trim supports
Details
       

 01-18-2009
0.75
fabricate 4 BIDS for fuel hose tunnel
     

 01-18-2009
1.00
3 BID release for fuel tunnel cover
Details
       

 01-17-2009
0.50
install replacement seat slider mechanisms
Details
       

 12-28-2008
1.00
prep floor, release tape for tunnel flange
Details
     

 12-28-2008
1.00
add vinyl hose to cushion fuel lines through holes
       

 12-27-2008
0.50
research selector issue on line and in Lancair "go

 12-27-2008
1.25
fit/trim fuel line tunne; study selector attachmen
Details
       

 12-27-2008
1.00
add 2 BID to vertical floorboard supports
       

 12-27-2008
1.25
2 BID top of fuel line tunnel
Details
     

 12-26-2008
1.00
Trim & prep fuel line tunnel and vert. capstrip

 12-26-2008
0.25
cut lay-ups for vertical floor supports
Details
     

 12-26-2008
1.50
cleco and bond vertical floorboard supports
Details
     

 12-26-2008
1.00
add 2 BID to inside of fuel line tunnel
Details
     

 12-22-2008
1.75
trim fuel line tunnel , fabricate
Details
       

 12-22-2008
1.25
trim aft seat & flanges; grind seat belt holes
       

 12-22-2008
1.00
drill holes & add nutplates for seat

 12-22-2008
0.50
cut inside and outside BIDs for top; misc. shop

 12-22-2008
1.00
1 BID to vertical support capstrip
     

 12-21-2008
0.10
will need a micro release and micro build up
Details
       

 12-21-2008
1.75
fabricate vertical supports for under floorboards
Details
       

 12-21-2008
2.00
design forward floorboards, cut template
       

 12-21-2008
2.50
design & fabricate fuel line tunnel
Details
       

 12-21-2008
0.75
cut pre peg and fit floorboards
       

 12-20-2008
1.00
micro and 2 BID aft seat flange support
     

 12-20-2008
0.10
make support for flange; drill seat belt bolt hole
       

 12-20-2008
1.00
figure out floorboards, begin template
Details

 12-20-2008
1.25
aft seat flange support
Details
     

 12-20-2008
2.00
add'l 4 BID on aft seat bottom
Details
       

 12-14-2008
1.00
seat rail template and drill holes in fuse flanges
     

 12-14-2008
1.00
fit seats, mess with corrosion
Details
       

 12-14-2008
1.75
3 BID to bottom of aft seat bottom
       

 12-13-2008
2.50
trim, prep and bond seat bottom
Details
       

 12-13-2008
0.50
research aft seat flanges....manual is fucked up

 12-13-2008
1.00
epoxy build up strips to spar flange, misc.
     

 12-13-2008
1.00
cut aft seat bottom and fit
       

 12-13-2008
2.75
aft seat flange - top
Details
       

 12-13-2008
0.50
add 2 BID to errant cut on seat bottom
     

 12-07-2008
0.75
research gusset removal and seat placement
Details

 12-07-2008
0.50
pull seats parts

 12-07-2008
0.50
prep bulkhead flange to bond strips next week

 12-07-2008
2.00
assemble front seats
       

 12-07-2008
0.25
alternate method for seat release
Details
       

 12-07-2008
1.25
aileron bulkhead mistake
Details
       

 12-06-2008
2.75
micro and 2 BID both close out panels
       

 12-06-2008
2.50
fabricate shear close out and aileron close out
       

 11-30-2008
1.00
work on finishing fuel system lines
Details
       

 11-30-2008
1.00
fuel hoses
Details
     

 11-30-2008
0.50
drill hole in step sleeve and make flox shoulder
       

 11-23-2008
1.50
step work
Details

 11-23-2008
2.50
micro prepeg panel 1 of 3 in place
       

 11-23-2008
1.75
micro panels 2 and 3; add 2 BIDs
       

 11-23-2008
2.00
measure for step and cut holes
Details
       

 11-23-2008
2.00
flox step sleeve in place
       

 11-23-2008
1.00
fabricate step panels 2 and 3
     

 11-23-2008
0.50
add 6 click-bond studs to hold fuel lines
Details
       

 11-17-2008
1.50
more fuel system work
       

 11-17-2008
0.50
level fuse; prep for step installation

 11-17-2008
1.50
finish fuel hoses and fittings
       

 11-17-2008
1.25
bulkhead fitting to gascolator
Details
       

 11-15-2008
4.00
micro belly, access panels, repair leg fairing
Details
       

 10-20-2008
1.00
install nutplates for access panels
     

 10-20-2008
2.25
finish fuel and flap access panels
Details
     

 10-19-2008
2.00
release tape panels and add 4 BID for flange
       

 10-19-2008
0.50
cut fuel and flap access panels
       

 10-19-2008
0.50
cut fuel and flap access panels
     

 10-19-2008
0.50
cut fuel and flap access panels
       

 09-28-2008
0.10
pics from 9/28
       

 09-15-2008
2.25
sand and apply 2nd pass of micro on fairings
       

 09-14-2008
1.75
micro bottom of fuselage & wing/leg fairings
Details
       

 09-13-2008
2.50
sand lower wing and leg fairings; prep for 1st bod

 08-25-2008
1.00
shape foam to build out right wing fairing
Details
       

 08-25-2008
0.75
flox foam to right fairing to build up gap
     

 08-24-2008
1.25
BIDs to right side fairing
Details
     

 08-24-2008
3.00
add BIDS to wing fairings
Details
       

 08-23-2008
3.00
pull access panels and prep wing fairings
Details
       

 08-09-2008
0.25
fairing interferes with fuel access panel
Details
       

 08-03-2008
1.00
Prepare to flip fuselage over
Details
       

 08-03-2008
0.10
Flipped over
       

 07-27-2008
1.50
run lines and connect Russell fittings
       

 07-27-2008
1.50
route stainless steel supply and return lines
       

 07-27-2008
1.00
new hoses and fittings
Details
       

 07-27-2008
0.50
mount fuel pump bracket
       

 07-27-2008
1.00
micro all new openings
       

 07-27-2008
0.75
grind holes to fuel selector
     

 07-27-2008
0.25
add fittings to fuel selector
Details
     

 07-27-2008
1.00

Details
       

 07-21-2008
1.00
pull step parts and study manual

 07-21-2008
0.25
pull off aileron controls in prep for flipping fus

 07-21-2008
1.50
prep & micro both wing fairings in prep for 2 BID
       

 07-21-2008
0.25
add 2 BID to fuel selector pad, right side

 07-20-2008
0.50
install fuel selector to pad
       

 07-14-2008
0.50
micro and add 2 BID to base for fuel selector
     

 07-14-2008
2.00
messed up fuel selector base...re-did
Details
       

 07-14-2008
0.25
further documenting fuel system mis-specification
Details
       

 07-14-2008
0.10

       

 07-13-2008
2.50
pull fuel system parts and try to figure out manua
Details
     

 07-13-2008
1.50
prepare mounting plate for fuel selector
Details
       

 07-13-2008
0.50
info on fuel return line and fittings
Details
       

 06-29-2008
0.50
crawl under fuselage..verify BIDs, remove peel-ply

 06-21-2008
0.25
sand micro on left wing fairing
Details

 06-13-2008
1.75
finish brake lines; insulate, tie-strap
       

 06-13-2008
1.00
finish brake lines
Details
       

 06-09-2008
2.00
repair left wing fairing damaged removing wing las
Details
       

 06-09-2008
2.50
fabricated and installed alum. brake lines
Details
       

 06-09-2008
1.00
brakes hoses all run
       

 06-08-2008
0.50
pull rest of brake parts and review manual

 06-08-2008
0.50
braided hoses installed to pilot side pedals
Details
       

 06-08-2008
0.50

       

 06-02-2008
1.00
move rudder pedals forward .7 inch
Details
       

 06-02-2008
0.50
installed flap motor
Details
       

 05-19-2008
0.50
test fit right main gear fairing
Details

 05-19-2008
0.75
figure out and fabricate center shim
       

 05-19-2008
1.75
drill and pot bolts for flap motor; add 2 BID on f
       

 05-19-2008
1.50
build rudder pedals; too much paint on tubes
       

 05-19-2008
1.00
both tubes bolted in place
Details
     

 05-19-2008
1.00
aft (right) pedal tube clamped in place
Details
       

 05-18-2008
2.25
trim fairings, build flap control rods; drill fwd
       

 05-18-2008
1.00
torque flap tube and support bolts
Details
     

 05-18-2008
2.50
recut inside BIDS (measured right and cut wrong fo

 05-18-2008
1.50
install delrin flap stops
Details
       

 05-18-2008
0.10
drill forward spar hole to correct size; both side
     

 05-18-2008
0.50
decore and micro fuse supports that were opened up
       

 05-12-2008
1.50
flap controls
Details
     

 05-12-2008
0.50
figure out manuals and plan fo attack
Details

 05-12-2008
0.10
drawings instead of patterns of the manual calls f
       

 05-12-2008
0.10
cut all BIDS for both sides at once
     

 05-12-2008
2.50
add 16 BID to right side of aft seat support
     

 05-12-2008
1.50
ad micro due to large gap between right seat suppo
       

 05-11-2008
1.00
more hole alignment
       

 05-11-2008
1.00
install supports and guides - 4 of them
Details
       

 05-11-2008
2.00
Flap torque tube
       

 05-11-2008
2.00
enlarge hole to 1 1/2"
       

 05-11-2008
1.00
assemble flap torque tube
Details
       

 05-11-2008
1.25
align holes
Details
       

 05-11-2008
1.25

       

 05-10-2008
1.50
add 2 BID to left wing fairing; plan flap controls
Details

 04-28-2008
2.00
fit and trim top fairing and rib
Details

 04-28-2008
2.50
bond top fairing; flox on fairing/fuselage and mic
Details
       

 04-28-2008
2.00
apply BIDs to fairing rib and web; 10 BIDs in tota
Details
       

 04-27-2008
2.50
micro wing left rib, trim add phenolic and final 2
       

 04-27-2008
1.75
bond left fairing rib/web to bottom fairing and fu
       

 04-26-2008
0.75
measure I/B aileron tube, rivet rod end
Details

 04-26-2008
1.75
Fit and trim fairing rib to left side; add 2 BID t
Details

 04-21-2008
0.25
full garb - working on fairing rib
Details
     

 04-21-2008
1.00
cleco left fairing in prep for bonding
Details
     

 04-21-2008
3.00
build and fit and fit and fit templates for web an
Details
     

 04-21-2008
1.00
bond left bottom wing fairing with flox
       

 04-21-2008
2.00
add webs to rib - micro
       

 04-07-2008
1.00
trim cover
Details
       

 04-07-2008
0.75
install nutplates with rivets - 6 places
Details
       

 04-06-2008
2.00
install elev. tunnel top
Details
       

 04-06-2008
2.00
fabricate top for elevator pushrod tube cover
Details

 04-05-2008
1.50
pot in left elevator torque tube enclosure
       

 04-05-2008
1.50
add 2 BIDs all around and micro'd cored out top

 03-30-2008
7.00
Elevator tube cover
Details
       

 03-29-2008
0.50
trim clearance holes for elevator pushtubes

 03-29-2008
2.00
measure and fabricate elevator torque tube to idle
       

 03-29-2008
1.00
make pattern for elevator tube enclosure
       

 03-29-2008
2.00
complete elevator push tube and inboard aileron pu

 03-28-2008
0.10
only 1 spot to enlarge - Right side
Details
     

 03-28-2008
1.00
installed elevator push tubes
       

 03-28-2008
1.00
install elevator torque tube
Details
       

 03-28-2008
2.00
fairing access panel and BIDs
Details
       

 03-28-2008
1.75
fabricate elevator push tubes
       

 03-28-2008
2.00
cut bulkhead supports for elevator pushtubes
Details
       

 03-23-2008
6.00
bond wing fairing web and ribs
Details
       

 03-23-2008
0.50
add phenolic for flap control; add 4 BID over top
       

 03-22-2008
0.75
rivet elevator idler
       

 03-22-2008
1.00
research elevator controls and build elev. idler
Details
       

 03-22-2008
0.50
install elevator idler assembly aft of FS 185 in f
Details
       

 03-10-2008
2.00
make templates for fairing ribs and webs - right s
       

 03-10-2008
2.00
fitted parts to fuselage
       

 03-10-2008
1.50
de-core ribs and webs
       

 03-10-2008
2.00
cut pre-peg
       

 03-09-2008
1.50
fabricate interior aileron bellcrank tubes
     

 03-08-2008
1.00
made another pass at fitting right wing fairing
       

 03-08-2008
0.10
installed control sticks to aileron torque tube
Details
       

 02-25-2008
1.00
Remove incorrect 4080 part-manual wrong
Details
       

 02-24-2008
2.50
re-engineer forward support #4080
Details
       

 02-24-2008
1.50
Grind areas for aileron clearance
Details
       

 02-24-2008
2.00
epoxy/micro forward supports
Details
       

 02-24-2008
2.00
drill access holes for aileron pushrods
Details
       

 02-23-2008
0.50
Lay out holes for aileron tube
Details
     

 02-23-2008
6.50
install aileron forward supports
Details
       

 02-17-2008
5.50
apply 9 BIDs for aft seat belt
       

 02-17-2008
1.00
apply 5 BID to both aileron front supports
       

 02-16-2008
1.00
floxed in hard points for aft seat belt
Details
     

 02-16-2008
0.50

Details
       

 02-15-2008
3.50
Sorted aileron control parts; worked on Fwd ailero
Details
       

 02-15-2008
1.50
Cut out core for aft seat points hard points
       

 02-15-2008
1.00
cut all BIDs for aileron support and seat belt har
Details
     

 02-10-2008
0.50
Laid out hard points for aft seats belts, cut phen
Details

 12-21-2007
1.00
Ready to BID inside of windows - 2 BID
       

 12-21-2007
6.00
add 2 BID around all windows
     

 12-20-2007
0.10
pix after door bond
Details
       

 12-20-2007
0.10
more after bonding door pics
       

 12-20-2007
3.00
bond in door
     

 12-19-2007
3.00
Micro around windows add 4" wide 4 BID around wind
Details
       

 12-19-2007
4.00
fit door frame and door
Details
       

 12-19-2007
0.50
door seal pump motor
Details
       

 12-18-2007
1.00
prep windshield for bonding
Details
       

 12-18-2007
4.00
bond in windows and windshield
Details
       

 12-17-2007
2.00
Trim right side of upper fuselage
Details
       

 12-17-2007
2.00
Screwed up window application
Details
       

 12-17-2007
1.00
Sand and prep fuselage for bonding of windows & w/
Details
       

 12-17-2007
2.00
Prep 2nd set of windows for bonding
Details
     

 12-17-2007
0.10
Fuselage mated after trimming right side to acheiv
Details
     

 12-17-2007
0.50

Details

 12-14-2007
1.00
Sand window openings; add 45 degree bias

 12-13-2007
1.00
Prep and square window openings
Details
       

 12-12-2007
0.50
moving fuselage over from prep shop to main build
       










Copyright © 2001-2024 Matronics. All Rights Reserved.