KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
Work Logs Found: 18
Category Work Time: 35 Hours
 Date
Hours
Work Log Summary

Details

 12-07-2020
1.30
Flight test and in air calibration
Details
     

 11-23-2020
3.50
final ground check out and re-install interior etc
Details
       

 11-21-2020
2.25
continue ground testing - no pics
Details

 11-19-2020
4.00
fix pin 45; install PFD; begin set up
Details
       

 11-16-2020
2.00
Most instruments back in; tidy up
Details
       

 11-12-2020
2.75
make trim wire connectors to pitch servo; tidy up
Details
       

 11-12-2020
1.25
Can Bus Hi/Lo to P4X02 on PFD
Details
       

 11-09-2020
1.50
trace elev trim cable, open up at pitch servo
       

 11-09-2020
0.25
think through splicing can bus wires in
Details
       

 11-09-2020
1.75
the big cut
Details
       

 11-09-2020
0.75
splice into elev trim cable; run to pitch servo
Details
       

 11-09-2020
1.75
mount rack; drill new hole for clip nutplate, Tig
Details
       

 11-09-2020
1.00

Details
       

 10-27-2020
4.25
Run new harnesses; install servos
       

 10-27-2020
2.00
pull old wiring and servos
       

 10-27-2020
1.50
fool w fit; remove autotrim
Details
       

 10-27-2020
2.00
connect power, AP disc and ground wires
Details
       

 10-19-2020
1.25
remove old TT Sorcerer AP
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.