KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
Work Logs Found: 136
Category Work Time: 164 Hours
 Date
Hours
Work Log Summary

Details

 01-30-2012
1.00
safety rudder turnbuckles
Details

 07-31-2011
0.00
super-fill HS, VS & rudder LE
       

 07-28-2011
2.00
Re-install rudder bellcrank
Details
     

 07-25-2011
4.00
hang rudder
Details
       

 01-30-2011
0.75
AN3-6 bolts and castle nuts to crossover tube
Details

 01-24-2011
0.75
wire up rudder trim servo; 6 pin mini molex
       

 01-24-2011
1.00
rudder travel set up
Details
       

 01-24-2011
1.50
re-install rudder bellcrank; adj. rod lengths to g
Details
       

 01-24-2011
0.00
left rudder cable
       

 01-24-2011
2.50
fit and swage on rudder cables
       

 01-24-2011
0.00
check swages to acceptable tolerance
Details
       

 01-17-2011
0.50
trim rudder horn and top of VS for clearance

 12-23-2010
0.75
run strobe & nav light wires through rudder
Details
     

 12-20-2010
1.25
grind sand VS cuff for rudder clearance
Details
       

 12-19-2010
0.75
misc work on rudder and parts

 12-13-2010
0.25
hang rudder; make trimming marks for travel
       

 12-12-2010
0.25
trim off VS for rudder fit
       

 10-18-2010
3.00
sand and super-fill #4

 10-03-2010
2.75
sand and prep for super-fill #3; groove elev plate

 09-20-2010
2.25
prep and super-fill #1 to VS joints
       

 09-20-2010
1.25
grind and sand excess Hysol from TE

 09-20-2010
1.00
fit foam and BID top close out on VS
Details
     

 09-20-2010
1.75
add 2 BID to inside joggles
Details
       

 09-13-2010
0.00
add'l pics
       

 09-13-2010
5.25
add BIDS to fuselage and VS and HS
Details
       

 09-12-2010
2.00
final VS fit; prep
Details
       

 09-12-2010
3.00
bond VS left side
Details
       

 09-12-2010
1.00
attached 3" SCAT vent hose
Details
       

 09-12-2010
1.00
3 BID to inside VS-HS on right side
     

 09-11-2010
2.00
reroute and secure wires in VS
Details
       

 09-11-2010
1.00
install rudder bellcrank and cables
       

 09-11-2010
0.00
add'l pic...wires out rear
     

 09-06-2010
0.00
right side VS bonded on
       

 09-06-2010
4.00
final prep for VS bonding and bond
Details
       

 09-06-2010
0.00
add'l pics VS right side bonding
       

 09-05-2010
1.00
VS fit and drill al clecos
       

 09-05-2010
1.00
test fit & align; check plumb with laser; drill al
Details
       

 09-05-2010
0.50
secure tail wires before bonding VS
     

 08-30-2010
2.00
fit elev tubes; fit VS; research
Details
       

 10-04-2009
1.00
sand VS; prep for final body work; WLS if nice wx?

 09-27-2009
1.00
ad add'l RG400 for potential NAV antenna in tail
Details
       

 07-06-2009
3.75
sand rudder & elev. trim tabs; move wings to new c
Details
       

 06-28-2009
1.00
micro 2nd face of top rudder pocket....misc shop
       

 06-08-2009
1.00
sand rudder micro and top right elevator
       

 06-08-2009
1.50
micro top of rudder wieght area; add 2nd pass micr
Details
       

 06-01-2009
0.50
micro TE of rudder trim tab
     

 05-11-2009
1.50
grind trim tab; begin sanding LS of rudder
       

 05-04-2009
2.00
shape clark foam for LE of rudder trim tab
Details
       

 05-04-2009
1.50
prep and micro LS rudder; bond trim tab fairing
       

 05-04-2009
0.10
called out screws too long; will use shorter ones
Details
       

 05-04-2009
2.50
and micro on right side of rudder (appled yesterda
     

 05-04-2009
0.10
1 BID and peel ply LE foam on trim tab
       

 05-03-2009
1.75
trim and fit and trim and fit rudder trim tab
       

 05-03-2009
2.00
sand and prep rudder, micro right side
Details
       

 05-03-2009
1.00
check travel...have 35 degress each way
Details
       

 05-03-2009
0.50
add Clark foam for LE of trim tab
Details
     

 04-12-2009
1.00
prep rudder LE close-out

 04-12-2009
0.50
1 BID to right side; misc. shop
     

 04-12-2009
0.50
1 BID to left side of rudder LE close-out
       

 04-11-2009
1.50
prep rudder; 1 BID on close-out
Details
       

 04-05-2009
0.10
rudder LE close-out
       

 04-05-2009
1.50
grind and prep rudder trim tab pocket
Details
       

 04-05-2009
1.25
flox in rudder leading edge close-out
Details
       

 04-04-2009
1.75
trim and prep rudder; remove clecos; release tape
Details
       

 04-04-2009
0.50
split rudder LE close-out
Details
     

 04-04-2009
1.00
remove peel ply from rudder, pop fairing copy #1;
Details
       

 04-04-2009
1.50
add 2 BIDs to rudder edges, form extra fairing #1
       

 03-29-2009
2.00
prep and close rudder
Details
       

 03-29-2009
0.50
decide on what to do with with middle rudder hinge
Details
       

 03-29-2009
0.00

       

 03-22-2009
1.25
trim VS with longboard; cut hole for conduit to ru
       

 03-22-2009
0.20
noticed middle rudder hinge end is crooked
Details
       

 03-22-2009
0.10
enlarge inside rudder holes; grind 6 BID on bellcr
Details
     

 03-22-2009
2.00
clay balls to check VS skin fit; check rudder trav
Details

 03-22-2009
1.75
check VS angle, enlarge rudder holes
Details
       

 03-09-2009
1.25
drill rudder tube holes
Details

 03-09-2009
1.25
drill holes for rudder tubes-fit
Details
       

 03-08-2009
1.75
trim & sand VS, clean up fwd VS spar

 03-08-2009
1.50
sand and prep rudder skins
Details
     

 03-08-2009
1.00
2 BID to NACA scoop and to LE cut-out to HS
       

 03-07-2009
0.75
install 4 click bond tie wraps fasteners; 2nd grom
       

 03-07-2009
0.50
flox in air scoop/ fwd VS spar
     

 03-07-2009
1.50
add grommets; figure out BNC connection - add end
     

 03-07-2009
0.50
add ends to rudder tubes; remove VS and mark for p
     

 02-23-2009
0.75
stern post; grind seam and clean up hinge holes, t

 02-23-2009
1.25
sand, prep, and flox in extra weight 535 grams + f
Details
       

 02-23-2009
1.00
pop tailight mount off and raise .18"
Details
       

 02-23-2009
0.50
ended up using the hinges from VS
Details
       

 02-23-2009
0.50
continue to balance rudder
       

 02-23-2009
0.50
1st attempt at jig to balance rudder
       

 02-22-2009
0.25
trim VS to marks
       

 02-22-2009
0.50
test fit taillight...need to grind screw heads; mo
Details

 02-22-2009
2.50
fit, trim rudder and vertical stab
Details
       

 02-22-2009
2.50
continue fitting/grinding VS and rudder
Details
       

 02-22-2009
0.50

       

 02-16-2009
0.75
rought cut rudder pushrods, flox rod ends; figure
Details

 02-16-2009
2.25
grind, sand and prep bellcrank platform; add 6 BID
       

 02-16-2009
0.50
cut elev tube to rough length; clean up rudder bel
Details
     

 02-16-2009
1.00
add rivnuts and install lower rudder hinge
Details
       

 02-15-2009
1.00
rudder bellcrank
       

 02-15-2009
0.10
GHP working the VS
     

 02-15-2009
1.25
flox in rudder platform
       

 02-15-2009
1.00
flox in rudder mount and flox NACA drains
       

 02-15-2009
1.50
fit rudder to VS; continued
       

 02-15-2009
1.25
fit and trim rudder to VS
Details
       

 02-15-2009
1.00
cut and fit phenolic for rudder mechanism
Details
       

 02-15-2009
1.25
continue fitting and trimming VS to rudder
Details
       

 02-14-2009
1.50
trim stern post and grind hinge access areas
       

 02-14-2009
1.25
misc. shop and cut left rudder after measure, meas

 02-14-2009
1.25
fit stern post, trim, trim , trim...
Details
       

 02-14-2009
1.25
fit and trim stern post of rudder
       

 02-14-2009
0.25
begin planning/measuring for rudder mount

 02-09-2009
2.00
repair insp. cover nutplate; close out trim tab
Details
     

 02-09-2009
1.50
more pictures... close out rudder trim tab
       

 02-09-2009
1.00
fit fwd plaenum; grind main air hole and drain hol

 02-09-2009
1.00
cut out trim tab, cleco air plenum, micro trim tab
       

 02-09-2009
1.50
cleco rudders, check plumb, trim taillight; close
       

 02-08-2009
2.00
rudder trim tab
Details
       

 02-08-2009
1.25
rudder trim tab
Details
       

 02-01-2009
0.25
remove peel ply from VS and grind/trim rudder pock

 01-31-2009
0.50
pocket for extra weight if needed
Details
       

 01-31-2009
2.50
fit vertical stabilizer
Details
       

 01-31-2009
1.25
fit tailight and rudder weight in right side of VS
Details
       

 01-31-2009
1.00
elevator weldment inspection plates
Details
       

 01-31-2009
1.50
bond rudder weight and tail light bracket
Details
       

 01-31-2009
1.00
bond in VHF COM antenna
Details
       

 01-30-2009
1.00
misc. rudder
Details
       

 01-30-2009
1.00
level & plumb fuse.
Details
       

 01-30-2009
1.50
figure trim tab; prep and apply close out and spar
       

 01-30-2009
1.50
design and install conduit for servo and aft light
     

 01-25-2009
1.50
pre-fit VS
Details
       

 01-25-2009
1.00
Plan antenna; refit HS, add 2 shims to right side
Details
       

 01-25-2009
1.00
mark rudder trim tab, cut hinges; add 4 BID

 01-25-2009
1.50
install rudder trim servo and access panel
Details
     

 01-25-2009
1.75
fit VS; cut rudder off; add NACA scoop
       

 01-25-2009
0.75
add'l pics
     










Copyright © 2001-2024 Matronics. All Rights Reserved.