Work Logs Found: 53
Category Work Time: 121 Hours
 Date
Hours
Work Log Summary

Details

 01-28-2012
3.25
bond preheat to oil pan; safety cylinder bands
Details
       

 12-05-2011
1.25
pull ELT door; work on adding 2nd map light circui
Details

 12-05-2011
2.25
more map light work
Details

 10-25-2010
6.50
crimp connectors on P-1 power plug
Details
       

 09-06-2010
1.50
work on wiring fwd of panel

 09-06-2010
1.50
manifold pressure wiring/plumbing
       

 09-06-2010
1.50
finish crimps; wire ground block
       

 08-30-2010
5.25
work on battery area connections prior to VS close
       

 08-30-2010
0.00
add'l wiring pics
       

 08-15-2010
1.50
starter grid wiring; crimp terminals
Details
       

 08-15-2010
1.00
start hanging wires on firewall behind panel

 08-15-2010
1.75
mini molex for fuel flow & rpm; wire pressure sens
       

 08-15-2010
2.00
did all the #2,#8 terminals I had rings for
Details
       

 08-09-2010
7.50
wiring; adels; install TPM cables
Details
       

 08-08-2010
7.75
engine sensor wiring
Details
       

 08-08-2010
0.00
add'l pics- rpm sensor
Details
       

 08-02-2010
2.50
rought run CHT-EGT wires; install probes
Details
       

 08-02-2010
0.75
redo about half of click bonds from yesterday
Details

 08-02-2010
1.00
figure big wire rings needed; add grommets to batt
Details
       

 08-02-2010
0.50
cut & grind add'l clearance for batt cover with gr
       

 08-01-2010
4.00
run wires
Details
       

 08-01-2010
2.50
run power wires and plan clamp locations
Details
       

 08-01-2010
1.00
flip starter power grid over; better wire access
       

 08-01-2010
2.50
ad click bonds for tie wraps and adel clamps
       

 08-01-2010
1.50
2 BID ELT shelf; grommet in baffle for alt wire
Details
       

 07-19-2010
5.00
plan and run conduits and grommets
Details
       

 07-19-2010
2.25
micro in couplings and elbows and conduits
Details
       

 07-18-2010
1.75
run COM2, transponder and ELT cables; bond in COM2
Details
       

 07-18-2010
0.25
install OAT probe to lower right wing tip
       

 07-06-2010
1.00
run RG400 for nav in RW; COM1 to vertical stab; Na

 07-06-2010
1.00
drill panel for headset jacks; drill rear seat bac
       

 07-06-2010
1.00
click bond studs on wing for fuel probe signal con
Details
     

 07-05-2010
1.10
reverse headset cable pin assignments; drill rear
Details
       

 07-05-2010
1.10
plan and mark out new jack locations on panel
Details
       

 07-05-2010
1.10
install roll servo and rough run cable
Details
       

 07-05-2010
1.10
install pitch servo and cable; back to orig. longe
       

 07-05-2010
1.10
install and level magnetometer
Details
     

 06-28-2010
2.75
wire in capacitance to voltage adapter from Dynon
Details
       

 06-28-2010
4.00
continue wiring; fab landing light attachment; chn
Details
       

 06-27-2010
4.50
run fat wires; install LS-1A voltage regulator
Details
       

 06-27-2010
0.10
flip VR so terminals are facing down; per B&C and
Details
       

 06-14-2010
1.25
redesign power grid; modify; install to R battery
       

 06-14-2010
1.25
install power grid to battery box
       

 06-14-2010
1.00
install ground lug to click bond studs
Details
       

 05-19-2010
4.00
do consolidated wiring diagram

 05-17-2010
6.75
continue to run wires
       

 05-17-2010
0.10
add'l wiring pics
       

 05-16-2010
5.25
begin wiring
Details
       

 04-19-2010
3.25
prep and flox servo mounting pads in AN3-5A
Details
       

 04-19-2010
3.00
modify pitch servo arm; fabricate mounting pads
       

 04-18-2010
1.00
work on placing AP servos
Details
       

 04-18-2010
4.00
inventory panel; work on rough wiring diagram
Details
       

 03-29-2009
0.50
adjust Palladin 3 layer stripping tool
Details
       