N144GP Lancair Super ES
Work Logs Found: 75
Category Work Time: 121 Hours
 Date
Hours
Work Log Summary

Details

 08-15-2011
0.75
start elev trim tab/servo install
Details

 08-01-2011
0.00
shot a coat of rattle can primer for now
       

 08-01-2011
0.50
finish repairs to HS, VS and rudder LE
       

 07-31-2011
1.00
repair HS, VS and rudder
Details
       

 07-30-2011
1.00
repair moving damage; rufferr LE too
Details
       

 07-28-2011
1.50
elevator bolts - install and tighten; apply torque
Details
       

 07-25-2011
1.00
hang elevators. Need to tighten up some bolts
Details

 01-17-2011
0.00
trial fit elevator tubes continued
       

 01-17-2011
1.75
elev. on, install tubes; test rigging
       

 12-19-2010
1.25
more drilling right elev.; balance
       

 12-19-2010
0.50
left side holes and weight required
       

 12-19-2010
1.00
flox holes
Details
       

 12-19-2010
1.25
add'l pics of right elevator
Details
       

 12-13-2010
3.00
drill out excess elevator weight
Details
       

 09-19-2010
3.25
add 2 BID to bottom HS to fuselage joint
Details
       

 08-29-2010
0.50
right side squeeze out
Details
       

 08-29-2010
2.50
Horiz Stab bonded in!!!!
Details
       

 08-29-2010
2.50
final fit, check and adjustment before bonding
       

 08-29-2010
0.00
add'l pics for reference
       

 08-16-2010
1.75
dry run; mount HS and level with laser
Details
       

 08-10-2009
0.10
rechecked HS to cradle; e-mailed pics to Lancair
Details
       

 08-10-2009
0.50
recheck fit of HS to cradle per ? to Justin last w

 08-10-2009
0.10
add'l HS to cradle pics for Lancair
Details
       

 07-12-2009
5.00
sand, prep, add super-fil
Details
       

 07-12-2009
2.25
Sand & prep top of HS; add Super-fil to top
     

 07-06-2009
2.00
sand HS top; micro 1st pass HS top
Details
       

 07-06-2009
1.75
prep elev and rudder with 150 grit; add Super-Fil
     

 06-28-2009
3.50
sand elevators; add Super-Fil to top face
Details
       

 06-28-2009
0.25
reserach Service Bulletin for rounding of HS edges
Details

 06-08-2009
1.25
sand top right elevator 1st pass; torque right sid
Details

 06-08-2009
2.25
sand top left elevator; fix stripped AN4-6A bolt
Details
       

 06-01-2009
4.75
sand micro'd elevators; micro other side
       

 05-31-2009
2.75
sand, prep and micro elevators
Details
       

 05-31-2009
1.50
sand elevators and prep for 1st micro
Details
       

 05-30-2009
1.50
prep and add Loehle Wonder-fil to bottom of HS
Details
     

 05-30-2009
1.50
grind out BID at elev. stop phenolic for clearance
     

 05-30-2009
1.50
fit elevators to HS; sand micro'd ends to get prop
       

 05-30-2009
1.25
final fit of elevator to HS; shop clean up
       

 05-11-2009
0.50
micro left end of HS....cabin method
     

 05-10-2009
0.50
micro right end of HS
       

 05-03-2009
1.00
prep and micro short half of elevator pockets
Details
       

 04-12-2009
1.00
trim rudder trim fairing to shape; sand botton of

 04-05-2009
1.50
Sand bottom of Horiz. Stab - continued
Details

 04-05-2009
1.00
make add'l fairing #3, add micro to bottom of HS

 04-04-2009
2.25
begin sanding of bottom of Horiz. Stab
Details
     

 03-29-2009
2.25
micro bottom of Horiz. Stab.
Details
       

 03-09-2009
2.00
sand HS, HSm back on re-check level and incidence
Details
       

 03-08-2009
1.00
re-set incidence for HS
Details
       

 03-08-2009
0.75
HS off; fab 2 - .082 shims; bond to HS cradle with
     

 03-08-2009
0.10
add'l pics after figuring shim needed
       

 02-22-2009
0.75
fit HS, right and left VS
Details
       

 01-30-2009
0.75
fabricate and epoxy 2 add'l shims on left HS cradl

 01-24-2009
1.00
prep & epoxy shims for stab cradle
Details
       

 01-18-2009
0.10
stab fitting - cont'd
       

 01-18-2009
2.50
fit stabilizer; measure, measure, measure
Details
       

 01-18-2009
0.10
final pics of stab set-up
Details
       

 01-18-2009
1.00
cradle interference with elev. stops
Details
       

 12-21-2007
1.00
prep elevator; enlarge acces to bolts stab/elevato
       

 12-21-2007
6.00
fitting and setting elevator
       

 12-21-2007
1.00
add phenolic block for up and down elevator travel
       

 12-21-2007
1.00
add phelonic block for elevator stops
       

 12-20-2007
2.00
finish up elevator BIDs
       

 12-19-2007
0.50
Door is fitted,ready to prep and add BIDs
Details
       

 12-18-2007
2.50
apply 2 BID to leading edge of Horiz Stab
Details
       

 12-18-2007
2.00
add 2 BID to elevators' leading edges
       

 12-17-2007
1.00
Stabilizer ready for final 2 BID
Details
     

 12-17-2007
1.00
Resulting fix to elevator
Details
       

 12-14-2007
2.00
prep and close Horizibtal Stabilator
       

 12-14-2007
4.00
Left elevator mistake
Details
       

 12-13-2007
2.00
pressure test fuel tanks in RW
Details
       

 12-13-2007
2.00
Prep stab for closing tomorrow
Details
     

 12-13-2007
2.00
Prep and close elevators
       

 12-13-2007
2.00
Close elevators
       

 12-12-2007
8.00
prep Horiz Stab and elevators
       

 12-10-2007
2.00
Day #1 - Sanded skin, spars, and caps for Stab
Details