Work Logs Found: 77
Category Work Time: 97 Hours
 Date
Hours
Work Log Summary

Details

 12-09-2019
0.00
split cowling install cont'd
       

 12-09-2019
1.00
install new split cowling
Details
       

 12-09-2019
0.50
finish up split cowl install
       

 12-08-2019
0.50
fill pinholes and prime
Details
       

 12-04-2019
0.00
begin lower cowling nose repair 4
       

 12-04-2019
0.00
begin lower cowling nose repair 3
       

 12-04-2019
0.00
begin lower cowling nose repair 2
Details
       

 12-04-2019
2.00
begin lower cowling nose repair 1
Details
       

 11-24-2019
1.50
cowl split mod - split and install receptacles
       

 11-24-2019
0.00
cowl split
       

 11-18-2019
2.50
split bottom cowl mod
Details
       

 11-18-2019
0.00
cowl mod layup
Details
       

 09-25-2017
0.50
partial fix of mount rub
Details
       

 10-07-2013
1.00
add capacitor to try to quiet ALT noise
Details
       

 02-10-2013
1.00
reconnect fuel drain hose...what a bear.
Details
       

 02-09-2013
4.25
ready for ground run tomorrow
       

 08-27-2012
2.25
begin work to modify cowl inlets
Details
       

 06-04-2012
0.25
dampener hose to oil filter
Details
       

 05-21-2012
0.25
trim exhaust pipes to natural body line
Details
       

 05-21-2012
0.75
gascolator
       

 04-17-2012
1.25
install nose fairing and cowling
Details
       

 03-25-2012
0.00
COWLING INSTALL PROCEDURE
Details

 03-25-2012
2.00
cowling back on; check gap; record install procedu
Details
       

 02-25-2012
0.50
note some epoxy "melting"
Details
       

 02-25-2012
1.00
mark lower cowling rub; check engine bolts
Details
       

 02-25-2012
0.75
grind & sand lower cowling for spinner rub
       

 01-28-2012
1.50
finish up Reiff preheater system install
Details
       

 11-13-2011
1.75
trim top cowl; cut flange off
Details
       

 11-13-2011
2.75
fit cowlng, trim seals, mark for cowl adjustment
Details
       

 10-17-2011
1.25
work off Duncan's squawks
Details

 08-29-2011
0.50
run spark plug wires RS
       

 08-29-2011
0.50
LS spark plug wires
       

 08-28-2011
0.50
PLUG VACUUM HOLE COOLING HOLE
Details
       

 08-28-2011
0.25
add silicone spacer to oil filter
Details
     

 08-27-2011
0.50
installed SS tie straps in place of safety wire
Details

 08-27-2011
1.50
install 72" prop cable and secure
       

 08-27-2011
0.00
add'l prop cable pics
       

 08-15-2011
1.00
prep and epoxy top cowling
Details
       

 08-15-2011
1.50
prep and epoxy inside of lower cowling
Details
     

 08-14-2011
3.00
install baffle seal
Details
       

 08-14-2011
1.00
FWF...virtually done... a few punch list items
Details
       

 08-14-2011
1.00
FWF continued
Details
       

 08-14-2011
1.75
firewall forward continued
Details
       

 08-08-2011
3.00
prop cable;gascolator, exhaust; drain lines; heate
       

 08-08-2011
3.00
continue on FW connections
Details
       

 08-01-2011
5.50
exhaust work and more wiring, hoses, etc.
Details
       

 07-31-2011
1.50
work on rear hoses,cables, wires and left side
       

 07-31-2011
0.00
ram air....adjust and modify spacer
Details
       

 07-31-2011
1.50
ram air
       

 07-31-2011
1.50
left side wiring
       

 07-31-2011
1.00
finish connecting throttle cable clamp
Details
       

 07-30-2011
3.25
work on wiring, hoses, etc.; moslty right side
Details
       

 07-30-2011
1.75
the fun continues...throttle cable
Details

 07-30-2011
1.25
fool with prop cable
Details
       

 07-30-2011
0.50
connect oil filter hoses; safety wire
Details
       

 07-30-2011
0.00
add'l prop cable pics
       

 07-28-2011
0.25
began work on controls and wiring in engine compar
Details

 07-24-2011
5.50
rehang engine
Details
       

 06-13-2011
1.00
research and figure sniffle valve install; misc sh

 02-07-2011
0.00
underside view of install skybolts
     

 02-07-2011
2.25
oil drain door - skybolts
Details
       

 02-07-2011
0.75
2nd 4 BID to oil drain door
     

 02-05-2011
2.00
replan oil drain door
Details
       

 02-05-2011
0.75
cut oil drain door
Details
       

 02-04-2011
0.75
plan out oil drain access door ala Bill H
Details
       

 01-30-2011
1.75
micro vertical hat rack
Details
     

 08-15-2010
0.00
remote oil hoses
Details
       

 08-15-2010
0.00
re-locate alt air cable- too short the way it was
       

 08-15-2010
0.00
install parking break cable to panel
Details
       

 08-15-2010
2.00
fabricate & install remote oil hoses
Details
       

 08-15-2010
5.00
Alt air, heat and oil cooler cables installed
       

 06-14-2010
1.25
fabricate phenolic pad for voltage regulators
Details
     

 06-13-2010
0.50
remove 37 pin double connector-room for voltage re
       

 04-25-2010
1.00
study and research firewall fwd.; pressure sensors

 09-20-2009
2.00
make template; figure out oil hose routing - measu
Details

 09-07-2009
1.00
intalled remote oil filter on firewall
Details
       

 09-07-2009
1.50
decore and add phenolic for remote oil filter
       