N144GP Lancair Super ES
Work Logs Found: 139
Category Work Time: 256 Hours
 Date
Hours
Work Log Summary

Details

 07-03-2018
3.00
adj K factor; adj elev trim indic.; rewire elev tr
Details
       

 06-24-2018
0.00
Fully clean ADSB report - PASS
Details

 04-30-2018
0.50
adj AP VRT and pitch trim speed
Details
       

 04-25-2018
0.00
ADSB pass e-mail
Details
     

 04-23-2018
0.20
K factor adjustment #1
Details
     

 04-07-2018
1.00
update GNS 530W with correct, current SW
Details
       

 04-07-2018
1.00
install LED status light for TT autotrim; and cali
Details
       

 04-02-2018
0.50
switch wires for Dynon power in....now +5v as it s

 04-02-2018
0.00
install new GPS ground plane
Details
       

 04-02-2018
1.00
get SW version; T Jason no pics...some on phone
Details

 04-02-2018
2.50
fab, fit and install ground plane for GDU 460 and
Details
       

 03-05-2018
2.00
xponder antenna cont'd
       

 03-05-2018
2.00
testing ADSB-530W communication per Garmin
Details
       

 03-05-2018
2.00
Dynon D1 power supply
Details
       

 03-05-2018
2.00
change out transponder antenna
Details
       

 03-05-2018
2.00
AP autotrim trim
Details
       

 12-24-2017
2.50
static ins and outs
Details

 12-23-2017
5.00
pitot-static all good; ARINC 429 good
Details
       

 12-18-2017
3.00
more pitot troubleshooting
Details
       

 12-16-2017
3.00
more troubleshooting ADSB and pitot issues
Details

 12-12-2017
3.00
more TX troubleshooting
Details

 12-11-2017
3.00
more troubleshooting
Details
       

 12-11-2017
0.00
door seal pump; pitot-static test tool
       

 11-29-2017
2.00
T Jason troubleshooting issues
Details
       

 11-29-2017
1.00
redo pitot and AOA fittings at wing tip
Details
       

 11-29-2017
1.00
Adjust prop govenor to stop; was only getting ~250
       

 11-19-2017
7.00
1st flight; troubleshoot squawks
Details
       

 10-19-2017
3.00
fix tach sensor wiring; clear up remaining open it
Details

 10-15-2017
2.25
rewire RPM and FF
Details
       

 10-15-2017
6.00
many Misc items
Details
       

 10-09-2017
3.00
pull R mag; install Garmin RPM sensor
Details
       

 10-09-2017
2.25
Misc. finalizing items
Details
       

 10-09-2017
2.50
misc cont'd
Details
       

 10-03-2017
4.00
pitot-static-xponder cert test
Details
     

 10-02-2017
5.75
engine start; magnetometer cal., misc
Details
       

 09-25-2017
2.00
mag interference test; calibrate fuel tanks
Details
       

 09-25-2017
2.50
fix P8 flap control; ELT
Details

 09-23-2017
1.50
wire up ELT connection; help hangar neighbor with
Details
       

 09-23-2017
0.50
Batts (2014) A=27.3v, B (2012) =26.2 volts
Details
       

 09-16-2017
1.50
Study P-8 wires CP stick; rewire pitot; zip ties
Details
       

 09-16-2017
1.50
secure all wires mid and aft.
       

 09-11-2017
1.75
troubleshoot co-pilot stick grip issues
Details
       

 09-11-2017
1.25
pitot and ELT
Details
       

 09-11-2017
1.25
load Sorcerer settings; more pitot fooling
Details
       

 09-11-2017
3.00
cont. check out of G3 install
Details

 09-09-2017
3.25
W&B; connect batteries
Details
       

 09-09-2017
1.50
Power up
Details
       

 09-04-2017
3.75
vent hose, adels, shunt, cb cover
Details
       

 09-04-2017
2.00
G3X screens & radios back in. MILESTONE!
Details
     

 09-04-2017
1.50
CB plate; pitot-aoa-static lines
Details
       

 09-04-2017
1.25
adels behind panel; GPS & XM antennae
       

 08-31-2017
0.00
pics 3
Details
       

 08-31-2017
0.00
pics 2
Details
       

 08-31-2017
3.75
numerous small items
Details
       

 08-31-2017
0.00
firewall schematic drawing-behind panel connection
Details

 08-31-2017
0.00
add 1A fuse to shunt leads
Details
       

 08-17-2017
1.00
work on co-pilot vent hose
Details
       

 08-17-2017
1.00
move ground block to a different, more accessible
Details
       

 08-17-2017
0.00
L side so far
       

 08-17-2017
1.00
Attempt to make main power connection
Details
       

 08-15-2017
2.75
pull GMU 22 cable-run opposite direction, repin
Details

 08-14-2017
3.00
Relocate dimmer; pilot side rails; route and conne
Details

 08-13-2017
1.00
hang panel; install GPS/XM ant.shelf; CR2 batt to
Details
       

 08-13-2017
5.25
begin reconnecting everything
Details
       

 08-13-2017
0.00
additional pics
Details
       

 08-07-2017
1.00
sort & secure wires on panel; clean front window

 08-07-2017
0.00
part 2
Details
       

 08-07-2017
6.00
many final small tasks before hanging panel back o
Details
       

 08-07-2017
0.50
make rough schematic of what needs to be connector
Details
     

 08-03-2017
2.00
ring out P-2,3; ground block strap, main buss term
       

 08-03-2017
2.00
figure GPS & XM antennas; fab shelf, set 1st click
Details
       

 08-03-2017
0.00
figure ant. shelf; locate, set 1st click bond
Details
       

 08-03-2017
0.00
buss to CB
Details
     

 08-03-2017
2.50
adels, zip ties, RTV... tidy up wire runs
Details
       

 07-30-2017
1.00
wig-wag wiring to P-1, pin 14; pull some old VP wi
Details
       

 07-30-2017
0.00
P-13 plug end.
Details
     

 07-30-2017
2.00
P-1-0 fuel probes, ELT, VR #2 sense wires, door se
Details
     

 07-30-2017
2.25
GTX 345 cable and antenna cable
Details
       

 07-29-2017
1.50
run GMU 22 magnetometer cable - left side
Details
       

 07-29-2017
1.50
re-install RAM air cable
Details
       

 07-29-2017
1.00
plan GTX wiring run; drill holes. No pics yet.
Details

 07-24-2017
0.50
re-install parking brake cable

 07-24-2017
1.25
re-install oil cooler, heat and defrost cables
Details
       

 07-24-2017
0.75
mount magnetometer shelf
Details
       

 07-24-2017
1.25
install power plug for Dynon D1
Details
       

 07-24-2017
1.50
hall effect sensor to Alt 2 B lead
Details
       

 07-24-2017
0.00
3 cables + parking in; just ram air left to do
     

 07-17-2017
0.40
voltage sense jumper VR1 to VR2
Details
       

 07-17-2017
2.25
final mounting of av fan, dimmer, and 12V converte
       

 07-17-2017
1.25
add alternate static valve and related plumbing
Details
       

 07-16-2017
1.75
replumb pitot-static AOA with SafeAir fittings
Details
       

 07-16-2017
0.50
add 2nd click bonds for avionics fan & dimmer
       

 07-02-2017
1.00
pull new 3C shielded wire in R wing for OAT
Details

 07-02-2017
0.75
place dimmer/fan/inverter; click bond 1
Details
       

 07-02-2017
0.75
misc shop

 07-02-2017
1.00
flox in GTX45R rack under R rear seat
Details
       

 07-02-2017
1.25
finish wiring all connectors for OAT tips & fusela

 07-02-2017
2.00
Figure out and Fab mounting brackets for GTX45R
       

 06-26-2017
2.00
wire VR1 and VR2, ammeter shunt
       

 06-26-2017
2.00
wire up molex for FF and RPM
     

 06-26-2017
1.50
wire up GTP 59 OAT
Details
       

 06-26-2017
1.75
ring out wig-wag wires and wire up tip ends of bot
Details
       

 06-26-2017
1.50
misc adels and zip ties; plan GTX45R mounting loca
Details

 06-26-2017
1.25
fool with turning mag to get new tach sensor on
Details
       

 06-26-2017
1.00
finish up pitot and AOA plumbing/wiring
       

 06-19-2017
2.50
wire up oil temp, fuel psi, oil psi, map, adels le
Details
       

 06-18-2017
5.75
wire up EGT and CHT; route
       

 06-18-2017
2.00
unpack & inventory panel box
       

 06-18-2017
2.00
sensor manifold
Details
       

 06-18-2017
0.00
sensor manifold
     

 05-25-2017
1.00
Oil temp sensor
Details
       

 05-25-2017
0.00
GMU 44 bracket final assembly
Details
       

 05-25-2017
3.00
finish GMU 22 bracket & platform
Details
       

 05-23-2017
2.50
work on GMU 22 magnetometer shelf
Details
       

 05-23-2017
1.00
ring out J243 tach wires
Details
     

 05-22-2017
3.25
Garmin GAP 26 pitot/AOA
Details
       

 05-21-2017
4.75
Begin G3X install
Details
       

 05-08-2017
2.50
install defroster; adels for wire run; ready for i
Details
       

 04-10-2017
4.50
add last click bond for defrost plenum; reroute &
Details

 04-03-2017
0.00
VR #2 cont'd
       

 04-03-2017
1.25
Voltage Reg #2; add SB1B-28, pull LS-1
Details
       

 04-03-2017
1.25
run AOA tubing; verify sync wires for Rec LIghts
Details
       

 04-03-2017
0.00
Rec Light wiring cont'd
       

 04-03-2017
1.00
defroster fit cont'd; add 3 more clic bonds

 12-30-2016
3.50
pull all control cables; ALT, OIL, HEAT, DEFROST,
Details

 12-24-2016
3.50
rang out 3 RG400 lines; run new wire, vac.
Details
       

 12-19-2016
0.00
weigh-in
Details
       

 12-19-2016
1.00
Pul old magnetometer and xponder cable; tidy up wi

 12-19-2016
1.00
plan out mag shelf extension; cut phenolic, drill
Details
       

 12-19-2016
0.00
panel ready for boxing up
       

 12-19-2016
3.00
finish boxing up panel for shipment
       

 12-12-2016
3.25
Continue cleaning up wires; remove rest of interio
Details

 11-30-2016
2.00
Pull remaining parts/wires; ready to pack up
Details
       

 11-14-2016
5.75
pull parts, seats & side panels out, panel out
Details
       

 11-08-2016
2.50
pull ARINC, EM wiring, Cables etc
Details

 11-07-2016
5.75
Pull AFS sensors and VP200 CU unit
Details

 10-31-2016
0.00
Pulling Day 1, part 3
       

 10-31-2016
6.75
Begin removal of original panel for Upgrade
Details
     

 10-31-2016
0.00
Begin pulling panel
Details
       