KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
Work Logs Found: 128
Category Work Time: 276 Hours
 Date
Hours
Work Log Summary

Details

 07-30-2017
0.50
clean up hangar a bit and blow out.

 10-20-2012
5.25
cowl, aileron hinges, B battery
Details

 08-20-2012
3.00
mount bolts. trim door flange, skybolt 4 nose gear
Details
       

 08-06-2012
6.00
work on plane while engine is rebuilt
Details
       

 07-09-2012
2.50
Misc. squawks
Details
       

 06-18-2012
1.75
replace static line; work on MG wheel pants covers
Details
       

 06-17-2012
2.25
misc. - try new cover - recowl
Details
       

 05-21-2012
1.25
cowlings back on and misc.

 05-20-2012
1.50
misc.
Details

 04-14-2012
4.75
get ready for test flight tomorrow
Details
       

 04-01-2012
2.50
update checklist; begin editing AFS checklist file

 03-26-2012
1.00
misc. shop and sort cup full of misc hardware back

 03-25-2012
1.00
test parking brake; engine run
Details

 03-24-2012
3.00
.DAR visit & inspection
Details
       

 03-19-2012
1.00
wipe down entire plane and clean up - prep for DAR

 03-12-2012
3.75
Weight and Balance day
Details
       

 03-12-2012
0.00
add'l w&b pics
       

 03-11-2012
3.25
drain fuel, paint/install glareshield
Details

 02-25-2012
0.00
3 view pics for DAR inspection
       

 02-24-2012
1.50
prep and mail paperwork to Ron Jones, DAR
Details

 02-21-2012
1.50
document AD compliance for 8130-6 form
Details
       

 02-13-2012
0.75
review staged parts; clean up; clean tape off of s

 02-11-2012
0.50


 01-30-2012
0.75
talk to John Reider & reinstall wing tip lights

 01-29-2012
0.75
run engine and misc clean up
Details

 01-21-2012
1.00
pull tip lighst for painting; record prop info
Details
       

 12-17-2011
1.50
run engine; inadvertant taxi!!!
Details

 10-31-2011
1.50
trim engine hoses; plan L armrest
Details

 09-21-2011
0.75
misc shop and try to clean foam mess: no joy

 08-27-2011
0.50
assembled and test AeroKart tug
Details
     

 08-15-2011
0.50
change descicant plugs; sweep hangar

 07-23-2011
3.75
work at airport a bit...hot!
Details

 07-04-2011
1.00
B batt leads; vacuum fusleage; count screws
Details

 07-03-2011
0.50
misc shop
Details

 06-04-2011
2.50
Ron & Debbie Perry visit and tour

 05-22-2011
0.50


 05-14-2011
1.00
misc and make up ELT GPS power lead
     

 02-05-2011
0.50
misc shop

 02-04-2011
0.50
misc shop stuff

 01-30-2011
1.00
micro top of vert hat rack; soften epoxy and reloa
Details

 01-29-2011
0.25
get pics & measurements on inertia reel for 2 buil
Details

 01-23-2011
0.75
misc shop and prep rudder bellcrank

 11-30-2010
0.50
misc. shop...had to clean up some!

 11-21-2010
1.25
clean epoxy pump; put new 11/10 epoxy in
Details

 09-12-2010
1.00
misc shop; cut BIDS for VS-HS; clean up

 09-04-2010
2.50
lower fuse and level; give tour to Sonex guy...Ran

 08-29-2010
1.00
measure aft seats and install ground strap
Details
     

 08-16-2010
4.50
prep/remove engine; rotate fuselage
Details
       

 08-15-2010
0.75
figure nose wheel air; fire sleeve fuel flow cube
     

 04-26-2010
1.50
cowl parts upstairs; fuse dolly, clean up
     

 04-24-2010
1.00
misc shop and drill 1/8" vent hole in nose pant

 04-12-2010
0.25
change desicant plugs in al cylinders

 01-31-2010
1.00
misc shop clean up and reorg.

 01-31-2010
0.50
misc shop

 01-24-2010
1.25
flip fuse; misc shop

 01-18-2010
0.50
put stuff away, clean up a bit, etc.

 01-16-2010
0.75
clean out epoxy pump; resin side had some crystali

 12-20-2009
0.50
re-plumb compressoer fittings to get out of way
       

 12-07-2009
7.00
HF compressor died; to Lowes for new
Details
       

 12-07-2009
1.50
get fittings, install, adjust new compressor

 11-01-2009
0.75
DC4 filter, descicant plugs, misc

 09-07-2009
1.25
re-arrange shop, move fuse, lay left wing flat
Details
       

 08-09-2009
8.00
transport engine & prop to Perry County Airplane F
Details
       

 08-09-2009
0.10
snap shots of mags and alt. for Aerotronics
       

 08-09-2009
0.10
set engine on dolley for now..may rig engine stand
     

 08-02-2009
0.50
lool through box that shipped with engine
Details

 07-19-2009
1.25
hang primed parts upstairs in the loft (aka Chris'
Details
       

 07-19-2009
1.00
flipped tileboard at layup table around; gen'l cle
       

 07-06-2009
0.50
misc shop & clean up

 06-28-2009
1.75
Assemble shop crane; misc shop
Details
       

 05-31-2009
0.50
rebuild wing stands
Details
       

 05-31-2009
1.00
misc. shop, cleanup, reorg., etc

 05-30-2009
1.00
take off fuselage top on rotisserie
Details
       

 05-30-2009
1.00
rebuild wing stands so both wings face the same wa

 05-10-2009
7.00
drove to VA - Bill Harrelson to pick up rotisserie
Details
       

 05-04-2009
1.50
misc. including figuring firewall connectors
Details
       

 05-03-2009
0.50
research various issues

 04-11-2009
0.10
my faithful helper, Maggie... on the job!
       

 03-29-2009
0.50
shop clean up

 03-08-2009
0.50
reserach and order crimper and stripper
Details

 01-31-2009
0.50
misc shop and pull parts

 12-28-2008
3.50
turn fuse; stow left wing; clean shop; fill pump
Details
       

 12-27-2008
2.50
trim fuse supports; lower wing
Details

 12-07-2008
0.50
general, long overdue, shop cleanup

 09-07-2008
0.50
organize new bolt and nut, etc trays, label

 08-24-2008
0.50
clean shop and think through foam for fairing

 08-09-2008
0.75
turn threads on perma-grit countersink
Details
       

 07-19-2008
0.10
took time out to knock off a ground hog
       

 07-14-2008
1.50
finished up securing wall cut-out to accomodate bo
Details

 06-29-2008
5.00
rearrange shop; cut hole in garage wall
Details
       

 06-29-2008
0.10
opening framed up
       

 06-22-2008
2.00
KCXY pilot gang came up for a tour
Details

 06-21-2008
0.10
had a visitor today...3 foot black snake
Details
       

 06-13-2008
0.50
misc shop; received BO'd nose gear strut...looks g
Details

 06-09-2008
0.50
clean up shop and put lots of tools away

 06-08-2008
0.50


 06-08-2008
0.50


 06-02-2008
1.00
remove left wing and position fuselage higher to m
Details

 06-02-2008
0.10
my faithful helper, Maggie
       

 05-18-2008
0.50
finish up AC, rehang lights. etc.

 05-17-2008
8.00
install A/C
Details
       

 05-12-2008
0.75
general clean-up; fill epoxy pump; clean table; pu

 04-28-2008
1.75
reposition wing and fuselage; cut glas for remaini
     

 04-27-2008
1.00
pull flap parts while waiting for micro to set up

 04-26-2008
1.00
finish running HVAC ducts downstairs
Details

 04-07-2008
0.25
Not in the manual, but..........
Details
       

 04-06-2008
0.50
misc. shop stuff

 04-05-2008
2.00
Installed new air compressor
Details
       

 03-30-2008
1.50
clean up and misc.
Details

 03-29-2008
2.00
moved parts around...right to left
Details
       

 03-29-2008
0.10
Another shot of left wing now mated to fuselage
     

 03-09-2008
1.00
Lynn and I removed right wing to access push tubes
     

 02-16-2008
1.50
set up epoxy pump; level fuse
Details
       

 02-10-2008
4.00
Organized and stored parts
Details
       

 02-09-2008
5.00
Moved kit from Capital City to Porter's Ridge
Details
       

 02-05-2008
1.00
Unload trailer from Partain - finally
Details
       

 02-05-2008
0.50
Most of the kit in the hangar...wings set on horse
       

 01-25-2008
0.10
Kit finally picked up
Details

 01-06-2008
0.10
this will be my building home
Details
       

 01-06-2008
3.00
finish up getting workshop ready
Details
       

 01-05-2008
3.00
Build Fuse cradles and misc. workshop - while wait
Details
       

 12-30-2007
8.00
Finsh set up of shop
Details

 12-23-2007
3.00
continue set up of shop; build engine stand to tur
Details

 12-21-2007
0.10
Bob Carter's favorite place - Timber Inn, Route 97
Details
     

 12-20-2007
0.10
scope out dimensions for fusleage cradle that will
Details
       

 12-16-2007
0.10
Old Columbia plant in Bend OR, now ownes by Cessna
Details
       

 12-14-2007
80.00
Working assitant during builder assist at Lancair

 12-11-2007
1.00
Inventory parts with Tory
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.