KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
Work Logs Found: 102
Category Work Time: 124 Hours
 Date
Hours
Work Log Summary

Details

 04-16-2012
2.50
install wheel pants to main gear
Details
       

 04-16-2012
1.75
install nose pant
Details
       

 03-26-2012
0.75
re-charge nose strut
Details

 02-12-2012
0.25
add a washer to each aft bolt in nose strut, -5s
Details
     

 02-11-2012
0.75
prep, mask & paint nose strut
Details
       

 12-19-2011
0.00
prep and WLS primer to MG paant access panel
Details
     

 10-16-2011
4.50
finish bleeding brakes
Details

 10-03-2011
1.51
EFIS mount; glareshield; defroster
Details

 10-03-2011
3.25
attempt to bleed brakes
Details

 09-05-2011
0.50
2 BID to 2nd side of nose pant

 08-29-2011
2.00
flox washers into nose pant
Details
     

 08-28-2011
0.75
work on nose gear repair
Details
       

 08-15-2011
0.50
torque main legs and safety wire
Details
       

 07-24-2011
0.00
re-install nose gear and nose wheel
Details
       

 07-18-2011
2.50
lift fuselage up and install main gear
       

 08-02-2010
1.00
install nose wheel and pant
Details
       

 05-10-2010
1.00
sand main gear fairings and prep for add'l super-f

 05-03-2010
0.75
super-fill main fairings; 2 BID mag. shelf
       

 05-03-2010
2.00
sand and prep main gear fairings

 05-03-2010
2.00
prep and WLS nose fairing; wingtips; o/h console
Details

 05-01-2010
1.50
super fill to nose gear and wingtips again; flox i
       

 05-01-2010
1.50
sand wingtips, nose and main fairings

 04-18-2010
0.50
tap nose gear fork; open up pant hole and counters
       

 04-18-2010
0.50
drill hole for nose gear attachment
       

 04-18-2010
1.50
2 BID gear fairing bulkhead

 04-12-2010
4.50
nose gear fit and fabrication
Details
       

 04-12-2010
0.00
fabricate aft bulkhead for nose pant
       

 04-12-2010
0.00
aft bulkhead and fork spacers
       

 04-11-2010
1.50
prop off; jack up to work on nose pant
       

 04-11-2010
1.00
drill 3" hole in nose pant; open up bottom opening
       

 04-11-2010
0.75

       

 03-08-2010
1.00
trim nose gear to length; add 6 1000-6 nutplates
Details
       

 01-31-2010
0.00
set strut to limits
       

 01-31-2010
0.00
nose strut installation continued
Details
       

 01-31-2010
0.00
mount nose wheel to forward fork
       

 01-31-2010
0.00
drill and install nutplates
       

 01-31-2010
1.00
assemble nose wheel/tire; research nose strut
Details
       

 01-31-2010
7.75
assemble nose strut and mount
Details
       

 01-25-2010
1.25
sand, prep & sup-fil one side of each gear leg

 09-15-2008
1.00
remove wheel pants and trim - no pics

 09-07-2008
1.00
sand repaired
Details
       

 09-07-2008
2.25
apply 2 BID to TE of both leg fairings
       

 08-25-2008
0.75
whoops...hole forward and s/b aft
Details
       

 08-25-2008
1.75
trim and fit fairings; add access holes
Details
       

 08-18-2008
3.50
trim upper fairing access panels
Details
       

 08-17-2008
1.50
nutplates to top panel; countersink
Details
       

 08-17-2008
1.50
flox left side; used temp. screws to get a good al
       

 08-17-2008
2.75
add nutplates to left fairing, flox
Details
       

 08-10-2008
1.00
right side...
     

 08-10-2008
1.50
prepare right side fuselage inner panel cover

 08-10-2008
2.00
jig for panel; release tape top accerss panel
       

 08-10-2008
1.50
fit and trim inside fuse fairings
       

 08-09-2008
1.00
flox both outside fusleage fairings in place
       

 08-09-2008
0.20
fix threads in both axles....mainly left.
Details
     

 08-09-2008
0.75
fit and trim both outside fuselage fairings
       

 08-03-2008
0.75
fit gear to fuselage fairings
       

 08-03-2008
1.00
fit fairing...mark for trimming
Details
       

 08-03-2008
0.75
cleco gear-fuselage fairing in place
       

 08-03-2008
0.10
both sides marked and cleco'd - will trim cut next
     

 07-21-2008
0.75
trim wheel pants and trim excess flox on build-up

 07-21-2008
0.75
grind fwd right buildup in prep to add material
Details
       

 07-21-2008
0.50
countersink wheel pant holes

 07-21-2008
1.50
add nutplates to all wheel pant brackets
       

 07-21-2008
0.10

Details
       

 07-20-2008
0.75
redo right side forward flox realese
Details

 07-20-2008
0.75
flox release to forward brackets
Details
     

 07-20-2008
0.50
dril holes into aft wheel pant bracket
       

 07-19-2008
3.00
flox release on aft brackets on both sides
Details
       

 07-19-2008
1.00
add nutplates for leg fairing to wheel pant
Details
       

 07-14-2008
4.00
fit both wheel pants to leg fairing...lots of fit
Details
       

 07-14-2008
0.10

     

 06-23-2008
0.50
slide left gear fairing on left main after removin
       

 06-23-2008
1.00
more fit, grind, fit, grind left wheel pant to lef
       

 06-23-2008
0.50
install and 2 BID washer inside left pant

 06-23-2008
2.00
fit, drill, fit right pant
       

 06-23-2008
1.50
fit, drill, fit left wheel pant
Details
       

 06-23-2008
1.00
drill, countersink and add nutplates to all pant b
       

 06-23-2008
0.50
add washer & 2 BID to right pant
       

 06-15-2008
1.00
trim access panels
       

 06-15-2008
1.50
micro release both wheel pants...not hard, but tim
       

 06-15-2008
0.75
install nutplates on right wheel pant
       

 06-15-2008
0.75
improvised pliers for squeezing rivets
Details
       

 06-15-2008
0.50
flox right leg fairing; used a bit more flox this
     

 06-15-2008
1.00
fit and trim access panel to right wheel pant
Details
       

 06-13-2008
1.25
prep, fit and figure contour of leg fairing
       

 06-13-2008
1.25
install 6 nutplates on left wheel pant
Details

 06-13-2008
1.75
flox left left fairing after a lot of trial and fi
Details
       

 06-13-2008
1.50
cut and trim brake access panel to both wheel pant
       

 06-08-2008
0.10
width at front of tire 102 1/8"....56"+ at center
     

 06-08-2008
1.00
set up toe in jig and measure, measure, measure
       

 06-08-2008
1.00
more jig work
Details
       

 06-08-2008
2.50
install brake calipers on each wheel
       

 06-08-2008
0.75
drill 4 - 1/4" holes in gear legs after setting pr
Details

 06-08-2008
0.50

Details
       

 06-02-2008
0.10
torqued wheel bolts
Details
     

 06-02-2008
0.25
safety wiring brake bracket AN5 drilled head bolts
Details
       

 06-02-2008
1.00
Mounted gear legs to fuselage
Details
       

 06-02-2008
0.25
Is this "cant" on the camber correct?
Details
       

 06-02-2008
0.25
gear legs ready to mount
Details
     

 06-02-2008
0.10
Cleveland brake calipers
     

 06-02-2008
5.00
assemble main gear wheels, mount tires; attach axl
Details
       

 06-02-2008
0.10
aft views with gear on
       










Copyright © 2001-2024 Matronics. All Rights Reserved.