N144GP Lancair Super ES
Work Logs Found: 22
Category Work Time: 25 Hours
 Date
Hours
Work Log Summary

Details

 08-11-2018
2.50
SB install switch, test, finalize
Details
       

 08-06-2018
1.00
SB J1 control cable wiring
Details
       

 08-06-2018
2.00
SB install 3A breaker; run ground wire
Details
       

 08-06-2018
0.75
SB couldn't access ground lug properly; butt splic
     

 08-06-2018
1.00
SB bundle up wires; reinstall some of interior
Details
       

 08-06-2018
0.75
SB drill holes in panel for switch and LED
Details
       

 08-02-2018
2.25
SB; work on wiring
Details
       

 08-02-2018
1.00
SB; did final install of SB units in wing pockets
Details
       

 07-30-2018
0.50
SB; mount ALC unit
     

 07-30-2018
1.00
SB; make CPC connections at both wing pockets
       

 07-30-2018
1.50
SB; J1 CPC connector at ALC
Details
       

 07-30-2018
1.50
SB; CPC connectors under front seat at ALC
Details
       

 07-30-2018
0.00
SB cable routing on R side
Details
       

 07-30-2018
0.00
SB cable routing L side
Details
       

 07-29-2018
2.25
speed brakes - pull L and R wing wires
Details
       

 07-29-2018
0.50
flox pad for ALC unit in- SB
Details
       

 07-21-2018
1.25
move fuel line adel clamps
Details
       

 07-21-2018
1.25
locate and drill drain holes
       

 07-21-2018
1.25
flox in 8-32 screws for ALC mounting pad
Details
       

 07-21-2018
1.25
ALC mounting location
Details
       

 07-16-2018
0.00
speed brake install planning
       

 07-16-2018
1.75
Beg planning/work on speed brakes
Details
       