KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
Work Logs Found: 163
Category Work Time: 300 Hours
 Date
Hours
Work Log Summary

Details

 06-04-2012
0.75
re-rig left aileron
Details
       

 05-20-2012
2.00
repair stripped screw and mount nav/strobe lights
Details
       

 05-09-2012
1.50
wire up Sunray Plus LED wing tip lights
Details
       

 05-07-2012
2.00
make pattern for R side light bulkhead
Details
       

 03-19-2012
0.25
install SS tie down rings...nice!
Details
       

 03-19-2012
1.50
blow off aircraft; WLS primer to flaps/ailerons/ti
Details
       

 02-25-2012
0.50
installed 3 tie down rings
     

 02-25-2012
0.75
access panels on
Details
       

 02-20-2012
0.25
leading edge tape to wing root gap
Details
       

 02-11-2012
0.75
sand s/f on flaps; still have a few pinholes
     

 12-24-2011
0.50
add fuel placards; add "EXPERIMENTAL" to door
Details
       

 11-07-2011
1.25
super-fill R wing tip gap; s/f pinholes in flap bo
       

 11-07-2011
1.25
install speed brake covers
Details
       

 11-07-2011
0.50
finish up R wing tip & misc shop
     

 10-31-2011
1.75
replace R strobe; install wing tips
Details
     

 10-31-2011
1.75
pull outside; sand flaps....looking good
Details
       

 10-24-2011
1.50
Super-fill pass #4 to both flaps - inboard side
Details

 10-17-2011
0.75
2nd pass super-fill to flaps
       

 10-16-2011
2.50
body work root of flaps at wing fairing
Details
       

 10-03-2011
1.50
trim flaps; finish hardware; position sensor; VP s
Details
       

 10-03-2011
1.50
Add'l flap work
Details
       

 10-02-2011
1.25
rig left aileron
Details
       

 10-02-2011
1.25
rig ailerons - right side
Details
       

 10-02-2011
2.50
modify flap push rods and rig
Details
       

 10-02-2011
2.50
flap rods and rigging
Details
       

 09-21-2011
0.50
tighten and torque aileron and flaps bolts

 09-21-2011
0.75
more flap rigging
Details
       

 09-21-2011
0.75
flap rods and flap rigging
       

 09-17-2011
3.50
work on aileron tubes and rigging
Details
       

 09-17-2011
2.75
hang flaps and begin rigging
Details
       

 09-17-2011
0.00
alieron over-length
       

 09-11-2011
2.00
ailerons
Details

 09-05-2011
2.50
re-install RS fuel quick drain
Details

 09-05-2011
0.50
aileron controls; right side
       

 09-04-2011
1.50
slosh wings
Details
       

 09-04-2011
3.00
hang right wing
Details
       

 09-04-2011
0.00
final wing hanging pics
Details
       

 09-04-2011
0.00
add'l wing hanging pics
       

 09-04-2011
13.50
add'l pics
Details
       

 09-03-2011
4.75
get ready for wings; 2 BID nose pant
Details
       

 01-25-2010
0.00
prime all wing access panels
     

 01-24-2010
1.25
super-fill wing tip tops prep to re-do WLS
Details
       

 01-17-2010
1.25
WLS primer to tops of ailerons & elevators

 01-16-2010
0.50
rebond left flap cover flange with flox

 01-16-2010
1.50
prep ailerons and elevators for WLS #2

 01-11-2010
0.75
stow right wing
Details
       

 12-26-2009
1.50
WLS primer coat #3 to top R wing

 12-26-2009
1.50
Vac. fuse and R wing; prep wing for WLS #3

 12-26-2009
0.75
sand and prep top right wing for WLS coat #3 (doub

 12-26-2009
0.10
aileron to wing tip alignment - right wing
       

 12-21-2009
4.50
final sand/prep and apply 2 coats WLS primer; top
Details
     

 12-20-2009
1.50
prep top right wing for super-fill #1
     

 12-14-2009
2.25
prep top right wing; micro release wing tip
       

 12-13-2009
2.00
WLS #2 bottom right wing
Details
     

 12-13-2009
2.00
sand and prep bottom RW for WLS #2

 12-07-2009
1.25
WLS primer bottom RW
Details
       

 12-07-2009
2.75
sand & prep bottom RW; s/f #4

 12-07-2009
1.75
finish sand and prep bottom RW

 12-07-2009
1.00
final sand bottom right wing
Details

 11-29-2009
3.00
body work
Details
       

 11-28-2009
1.75
fit/release tape access panels
Details
     

 11-22-2009
3.50
sand bottom right wing, and misc grinding, etc
Details

 11-14-2009
1.00
super-fil #1 to bottom right wing
       

 11-14-2009
2.25
sand right bottom wing; fairing, flap pocket
Details
       

 11-09-2009
0.50
stow l wing and position right wing
Details
       

 11-09-2009
1.75
sand bottom right wing
Details
       

 11-09-2009
1.50
micro LE and flap pocket of right wing (bottom)
       

 11-09-2009
0.75
alignment issues with left wing???
Details
       

 11-09-2009
0.10

       

 11-02-2009
2.00
sand & prep top left wing
Details
       

 11-02-2009
1.50
2 coats WLS primer on top left wing
Details
     

 10-26-2009
2.50
sand left lower wing for "fuzzies"
Details
     

 10-17-2009
6.25
final prep left lwr wing; 2 coats WLS primer
Details
       

 10-10-2009
4.50
sand and super-fil bottom of left wing
Details

 10-05-2009
2.75
trim aileron fairing, sand bottom left wing
       

 10-05-2009
1.25
super-fill #2, bottom left wing
       

 10-05-2009
1.00
prep releases for access panels and tips
       

 10-04-2009
2.75
prep for 2 BID flap to aileron on left wing
       

 10-04-2009
2.50
flip left wing, sand, grind prep add super-fil
Details
       

 09-28-2009
1.25
break out brake cover release; sand LT wing; add'l
Details
       

 09-27-2009
0.75
super-fill top left wing; pass #1
     

 09-27-2009
1.25
S/F #2 TL wing; s/f speed brake pocket
       

 09-27-2009
1.00
release tape speed brake pocket LT wing
Details
       

 09-27-2009
1.75
prep top left wing for repairs and s/f
       

 09-27-2009
2.00
micro release left wing tip
Details
       

 09-27-2009
2.50
clean up tip release; prep top left wing
Details
     

 09-27-2009
1.00
add 2 BID to LE L wing, and 3 BID to flap control
Details
       

 09-20-2009
1.50
spray flaps and wingtips with WLS primer
Details
       

 09-20-2009
3.00
set up hanging wire; prep flaps and wing tips
Details

 08-30-2009
1.50
sand flaps and tips...ready, but need Wonder-fil
Details
       

 08-17-2009
2.50
sand flaps and wing tips again
Details
     

 08-16-2009
2.50
sand flaps and apply Super-fil coat #2
Details

 08-10-2009
1.25
Super-fill to top of both flaps; surface is actual
     

 08-10-2009
3.50
sand bottom side of both flaps
Details

 05-11-2009
2.00
build wing cradle stand
Details
       

 12-06-2008
1.50
finish step and left aileron push rod
Details

 11-30-2008
0.50
left wing back on
Details
       

 11-02-2008
0.50
flox pre-preg in trailing edge of right wing tip
     

 10-27-2008
4.00
fit & cut wing tip lights
Details
       

 10-26-2008
1.00
install nutplates for light mount
       

 10-26-2008
1.00
grind out mount for strobe and nav lights
Details
       

 10-26-2008
1.50
fit, trim, fit wing tip light mount and lense
       

 10-25-2008
1.00
install nutplates for right wing tip

 10-25-2008
0.75
flox in brass fittings to each NACA scoop
       

 10-25-2008
0.50
figure out new plan for fuel vent
Details
       

 10-25-2008
0.50
drill holes for R tip nutplates

 10-25-2008
1.00
drill hole for vent in NACA scoop in each wing tip
       

 10-25-2008
0.25
cut off AN fittings for fuel vent in wing
       

 10-25-2008
0.50
begin trimming light brackets

 10-19-2008
1.75
prep and 2 BID left wing end for tip
     

 10-19-2008
0.25
fool with fuel vent thinking some more
     

 09-28-2008
0.10
pics from 9/28 and prior
Details
       

 09-28-2008
9.50
bodywork fuselage, wing tips, fuel access panels
Details
       

 09-28-2008
0.10

Details
     

 09-15-2008
0.50
trim left and right wing tips with longboard
Details
       

 09-15-2008
1.25
add'l and final fitting of aileron into wing pocke
Details
     

 09-14-2008
2.25
fit left aileron
Details
       

 09-14-2008
1.00
decore, prep and 2 BID left top wing skin core
       

 09-14-2008
2.00
decore right side top skin; prep and 2 BID
Details
       

 09-07-2008
1.25
fit left aileron with weights attached
Details
     

 09-07-2008
1.50
dril and attach lead aileron weights
Details
       

 09-07-2008
1.50
add add'l 2 BID to right wing fairing over foam
     

 08-24-2008
0.10
close up after balancing
       

 08-24-2008
2.00
balance ailerons; mark for holes
Details
       

 06-22-2008
1.50
prep aileron for balance
Details
     

 06-22-2008
1.00
grind groove and try to balance right aileron
Details
       

 06-22-2008
1.50
attemtp left aileron balance (cont'd)
Details
       

 06-21-2008
1.25
try to fish servo wires through aileron
Details
     

 06-21-2008
0.50
super-glue conduit in
Details
       

 06-21-2008
1.25
flatten all 14 lead rods for aileron balancing
Details

 06-21-2008
0.50
fit and trim roll servo to hole in aileron

 06-15-2008
1.50
research and prep for aileron balancing
Details
       

 04-07-2008
2.25
measure and build aileron tubes for left wing
Details

 04-07-2008
2.75
fit & trim left side wing fairings, cleco in
Details
       

 04-06-2008
1.00
pull parts for left wing aileron controls; begin f

 04-06-2008
2.00
fit, align and cleco top left wing fairing
Details
       

 04-05-2008
1.50
install left side flap brackets; hang flap
Details
       

 03-29-2008
1.50
fabricate access panel in right fairing
       

 03-22-2008
3.75
rib and webs for right wing fairing
Details
       

 03-22-2008
1.00
prep fairing - will bond in tomorrow
Details
       

 03-10-2008
1.00
finish inboard portion of aileron push tubes
       

 03-09-2008
4.00
prep and install right side wing fairings
       

 03-09-2008
0.50
outboard aileron tube; ready to drill
     

 03-09-2008
1.00
fabricate outboard aileron tube, right side
       

 03-08-2008
2.00
install flap brackets
Details
       

 03-08-2008
3.00
hang right alieron
Details
       

 03-08-2008
1.00
fabricate outboard aileron push tubes
       

 03-08-2008
1.00
aileron bellcrank in wing after push rod installat
       

 02-25-2008
1.50
trim lines for 1st pass cutting fairings
Details
       

 02-25-2008
2.00
test fitting top and bottom wing fairing - right s
       

 02-25-2008
2.00
re-install correct fwd aileron support #1105
Details
       

 02-25-2008
0.50
added end to long aileron push tube; drilled holes

 02-23-2008
0.20
leveled up fuselage with right wing on
Details
       

 02-17-2008
2.00
hang left wing, mate right wing
Details
       

 12-20-2007
3.00
work on wing tips until top fuselage can be lifted
Details
       

 12-17-2007
1.00
repair some bubbles in in LW flap trailing edge.
Details
       

 12-14-2007
4.00
add micro fillet to trailing edges; add 2 bid
       

 12-12-2007
6.00
Prep and close right wing
       

 12-11-2007
4.00
prep RW - top
Details
       

 12-11-2007
4.00
prep RW - bottom skin, COM antenna & AOA detail
Details
       

 12-11-2007
7.00
close out Left wing
Details
       

 12-10-2007
14.00
Day #1 Builder Assist - Left wing
Details
       

 12-07-2007
2.00
add 2 BID to LW joggle
     










Copyright © 2001-2024 Matronics. All Rights Reserved.