KitLog pro

Powered By Kitlog Pro v2.0

N144GP Lancair Super ES
Work Logs Found: 27
Category Work Time: 28 Hours
 Date
Hours
Work Log Summary

Details

 06-04-2011
0.75
add extra screw to elev inspection plate, 8-32 riv
Details

 12-26-2010
0.75
super-fill #1 to elevator horns; prep & s/f o/h co
Details
       

 12-23-2010
0.50
sand elev. weight flox area; prep for bodywork

 12-20-2010
0.00
right side elev balancing
       

 12-20-2010
0.00
left elevator balancing
Details
       

 12-20-2010
2.50
final work on balancing elevators
Details
       

 12-15-2010
1.00
set up jig to balance elevators separately
Details
       

 12-15-2010
1.25
ream out 1/2" holes to 5/8"; drill more holes
       

 12-15-2010
1.25
final trim to fit of both elevators
Details
       

 12-15-2010
1.25
drilled 6 holes to 5/8" on right side
       

 12-13-2010
0.50
add rivnut to repair right elev insp plate
Details
       

 12-12-2010
1.50
work on elevator rigging; seems like too much weig
       

 12-12-2010
1.00
Phil helped hang elevators; will work on rigging
Details

 12-11-2010
0.25
redo elev inspection plate repair

 12-06-2010
0.25
start repair of nutplate on right elev inspection
Details
     

 10-03-2010
0.50
repair elev trim tab; new foam, add super-fill
     

 10-03-2010
1.00
grind for elev weldment plate cover
Details
       

 10-03-2010
1.50
fit & trim elevator to VS
Details
       

 09-27-2010
3.00
sand super-fill #2
       

 09-27-2010
2.25
sand SF #2; prep for pass #3
       

 09-27-2010
0.75
rough trim both elevators
       

 09-27-2010
1.00
release tape weldment plates; fair in with super-f
     

 09-20-2010
1.75
fit elev. and mark for initial trim
Details
       

 09-05-2010
1.00
cut, drill and rivit rod ends on final elev. P/P t
Details
     

 09-04-2010
2.00
fit elev.; trim; measure last elev. push tube
Details
       

 09-04-2010
0.00
check elevator travel
Details
       

 09-04-2010
0.00
check elevator travel
       










Copyright © 2001-2024 Matronics. All Rights Reserved.