Brief Description: safety baffle, mount prop, torque, safety, spinner
and misc punch list to get ready to run tomorrow; checked all nuts and fittings, did standoffs finish connections for ALT and landing light RTV various baffles pieces and hoses; re-affix wire clamps change out oil PSI fitting; reclock to get hose to go on like it was before ram air on..need to fine tune adjustment to get full open connect battery 'check lights and all electric functions prime fuel line hand prop 50 times then run starter for 3-4 15 second runs to pre-oil engine had Reiff heat on all day and left on when I left as it is supposed ot be 16 overnight replace and torque plugs sand off mess on exhaust pipe L side air up tires 60 and 40 reset oil alarm for 25 PSI audio alarm lower cowl and nose gear leg fairing back on