Powered By Kitlog Pro v2.0
Larry Winger's 601XL Project
Zodiac CH 650
Empennage
93 Logs Found
Date
Hours
Work Log Summary
Details
12-13-2008
3.0
Prepped and primed rudder parts
Details
12-13-2008
2.0
Finished new 650 rudder
Details
12-12-2008
2.8
Completed drilling rudder
Details
12-09-2008
3.5
Assembled trailing edge side of rudder
Details
12-08-2008
2.8
Assembled rudder skeleton
Details
12-07-2008
1.3
Fabricated rudder rear ribs #3 and #4
Details
12-06-2008
1.3
Remade rudder rear ribs #1 and #2
Details
12-06-2008
2.8
Fabricated vertical tail spar and doublers
Details
12-05-2008
3.8
Fabricated vertical tail leading & trailing edge s
Details
12-04-2008
1.8
Fabricated rudder rear ribs #1 and #2
Details
12-03-2008
2.0
Fabricated nose rib for new rudder
Details
01-25-2008
3.5
Finished polishing horizontal stabilizer/elevator
Details
11-12-2006
0.8
Temporarily connected and tested trim rocker & LED
Details
11-11-2006
3.3
Completed Empennage
Details
10-30-2006
2.0
Drilled out rivets and positioned new hinge
Details
10-29-2006
2.0
Riveted the elevator
Details
10-28-2006
2.5
Riveted bottom and part of top skin flange
Details
10-28-2006
4.0
Disassembled, deburred & primed elevator
Details
10-28-2006
8.3
Completed assembly of elevator & trim tab
Details
10-26-2006
3.0
Completed the Elevator cut out and bent strip
Details
10-24-2006
4.3
Installed upper and lower elevator horns
Details
10-22-2006
5.8
Completed all remaining elevator parts
Details
10-21-2006
3.0
Drilled rest of elevator and clecoed to stabilizer
Details
10-21-2006
4.3
Completed Upper & Lower Elevator Horns
Details
10-20-2006
1.8
Predrilled skins and attached ribs from bottom
Details
10-19-2006
1.5
Made Elevator Center Channel & installed L angles
Details
10-19-2006
3.0
Attached ribs to back and laid out rivet lines
Details
10-18-2006
1.3
Fixed the Elevator Skin Flange
Details
10-17-2006
1.0
Made form blocks for Elevator Ribs
Details
10-17-2006
5.0
Made elevator ribs and attempted elevator skin
Details
10-15-2006
3.5
Riveted tip ribs and pre-drilled fiberglass tips
Details
10-14-2006
7.3
Completed Stabilizer
Details
10-11-2006
5.5
Riveted stabilizer bottom skin
Details
10-10-2006
2.8
Secured Skeleton to table & made skin template
Details
10-09-2006
3.0
Cleaned, primed and riveted stabilizer skeleton
Details
10-09-2006
1.0
Bent Stabilizer Skin
Details
10-04-2006
1.8
Drilled center ribs to spar, L angle and deburred
Details
10-03-2006
3.0
Made attachment doublers and drilled front spar
Details
10-03-2006
1.0
Deburred and reassembled rear spar
Details
10-02-2006
2.5
Front Spar and Front Spar Attachments Remade
Details
09-29-2006
2.5
Drilled Stab Skeleton rivet holes to size
Details
09-29-2006
1.0
Added L angles to ends of stab spars
Details
09-25-2006
2.3
Drilled and clecoed stabilizer skeleton
Details
09-24-2006
1.0
Rear Spar Upper Doubler redone
Details
09-24-2006
4.5
Measured, drilled and clecoed rear spar
Details
09-23-2006
6.8
Metal cutting experiments and rear spar parts redo
Details
09-19-2006
1.5
Finished stabilizer front spar assembly
Details
09-19-2006
2.5
Completed rear spar assembly
Details
09-18-2006
2.5
Started stabilizer front spar assembly
Details
09-17-2006
0.8
Modified end rib forms to make center ribs
Details
09-17-2006
2.1
Completed stabilizer end ribs
Details
09-17-2006
4.5
Completed stabilizer center ribs
Details
09-16-2006
2.0
Remade rear spar attachment
Details
09-16-2006
3.8
Front spar attachment & rear spar attachment
Details
09-14-2006
3.0
End rib and attachment forms
Details
09-09-2006
4.3
Marked and pre-drilled front and rear stabilizer s
Details
09-07-2006
1.5
Made Horizontal Stabilizer Rear Spar
Details
09-06-2006
1.3
Made Front Spar for Horizontal Stabilizer
Details
09-06-2006
2.0
Completed spar doublers, shim and standard angles
Details
09-05-2006
1.3
Cut blanks for spar doublers & made 6T1-7HD
Details
09-04-2006
1.5
Rudder riveted and complete
Details
09-04-2006
1.5
Cleaned primer from exterior areas
Details
09-04-2006
1.5
Cleaned and primed skins
Details
09-03-2006
0.5
Prepared Rear Rib #3 for re-drilling
Details
09-03-2006
0.8
Deburred all rudder parts
09-03-2006
4.8
Added leading edge skin and drilled all holes
Details
09-02-2006
3.0
Trimmed bottom of trailing edge skin and pre-drill
Details
09-02-2006
0.8
Riveted Rudder Skeleton
Details
09-02-2006
0.8
Primer touch-up on rudder skeleton
09-02-2006
2.8
Drilled and clecoed trailing edge rudder skin
Details
09-01-2006
2.3
Prepped and primed rudder skeleton
Details
08-30-2006
1.0
Made Stabilizer Tip Ribs
Details
08-29-2006
0.8
Deburred and cleaned rudder parts
Details
08-27-2006
0.8
Re-drilled rudder skeleton rivet holes
Details
08-26-2006
2.5
Remade rib #1 and reinstalled
Details
08-25-2006
2.5
Pre-drilled and clecoed rudder skeleton
Details
08-25-2006
1.5
Final fabrication of tip and nose ribs
Details
08-25-2006
1.0
Cut spar doubler angles and marked spar and angles
Details
08-23-2006
0.8
Remade Vertical Tail Tip Rib
Details
08-23-2006
1.0
Completed Vertical Tail Tip Rib
Details
08-23-2006
1.8
Completed Doubler Angles and Bent Strip
Details
08-22-2006
2.0
Redo of rib 1 and fabrication of rudder nose rib
Details
08-20-2006
5.8
Completed Vertical Stabilizer Rear Ribs
Details
08-19-2006
3.0
Routed/chamfered forms and attempted rudder horn
Details
08-19-2006
3.0
Completed Vertical Tail (Rudder) Horn
Details
08-18-2006
1.5
Rough cut form blanks for rudder ribs
Details
08-15-2006
0.5
Bent Trailing Edge Rudder Skin
Details
08-12-2006
0.5
Bent Leading Edge Rudder Skin
Details
08-09-2006
3.0
Cut Rudder Skins
Details
08-08-2006
1.8
Bent Vertical Tail Spar
Details
07-27-2006
1.5
1st airplane part complete
Details
07-26-2006
2.0
Second attempt at rib
Details
07-18-2006
4.5
First form block and rib
Details
SITE NAVIGATION
Contact Builder
Zodiac CH 650 Home
All
Avionics
Empennage
Engine
Fuselage
Miscellaneous
None
Planning
Shop Supplies
Tools
Total Hours
Wings
Work Area
Copyright © 2001-2013 Matronics. All Rights Reserved.