Powered By Kitlog Pro v2.0
Larry Winger's 601XL Project
Zodiac CH 650
Wings
285 Logs Found
Date
Hours
Work Log Summary
Details
01-13-2013
8.0
A long weekend of experimenting and learning
Details
12-31-2012
2.1
Left wing tip and landing light lens installed
Details
12-30-2012
3.5
3 - Right. landing light lens and wing tip
Details
12-30-2012
1.8
2 - Balanced ailerons
Details
09-06-2010
6.3
Right wing mods completed!
Details
09-04-2010
7.3
Reassembled right wing
Details
08-26-2010
2.5
Riveted aileron bellcrank support & placed L angle
Details
08-25-2010
2.5
Airleron bellcrank supports fitted and drilled
Details
08-24-2010
2.3
Riveted rear channel mods
Details
08-23-2010
3.0
Rear Channel mods drilled in place
Details
08-22-2010
1.8
Drilled aileron rod hole doubler
Details
08-12-2010
1.0
Enlarged rivets to A6 and replaced fuel tank fill
Details
08-11-2010
2.8
Replaced fuel tank and riveted nose skin
Details
08-02-2010
1.8
Riveted nose skin to bottom of ribs
08-01-2010
6.0
Remade Front Upper Spar Doubler
Details
08-01-2010
6.0
Remade Front Upper Spar Doubler
Details
08-01-2010
4.5
Completed nose rib modifications
Details
07-25-2010
5.0
Nose ribs mounted
Details
07-24-2010
1.5
Remade nose rib angles
Details
07-21-2010
0.8
Started rib 2 mods
Details
07-04-2010
3.3
Mounted root doubler and rib #1
Details
07-03-2010
1.3
Remade root doubler
Details
06-28-2010
1.8
Botched the root doubler
Details
06-27-2010
2.8
Drilled root doubler
Details
06-26-2010
3.3
Bolted on new extrusion
Details
06-24-2010
1.5
Backdrilled extrusion
Details
06-23-2010
2.3
Solid rivets removed and extrusion in place
Details
06-22-2010
2.0
Started solid rivet removal in right wing
Details
06-21-2010
1.8
Right wing top skin removed
Details
06-20-2010
2.3
Started right wing modifications
Details
06-20-2010
1.8
Completed right aileron mods
Details
06-07-2010
1.8
More work on right aileron mod
Details
05-23-2010
3.3
Started right aileron mods
Details
05-22-2010
3.5
Finished and stored left wing
Details
05-21-2010
4.5
Installed left aileron
Details
05-20-2010
1.5
Installed balance arm in left aileron
Details
05-19-2010
2.3
Placed aileron ribs and balance arm
Details
05-18-2010
1.3
Started mod on left aileron
Details
05-06-2010
2.0
Left nav/position/strobe installlation complete
Details
05-04-2010
2.5
Misc. work on left wing
04-19-2010
2.5
Installed left nav/position/strobe
Details
03-25-2010
1.8
Started riveting topside nose skin
Details
03-24-2010
2.3
Riveted nose skin & replaced fuel tank
Details
03-21-2010
2.8
Riveted left wing top skin
Details
03-15-2010
2.3
L angles on top skin
Details
03-13-2010
4.5
Primed and riveted spar/bellcrank mods
Details
03-12-2010
1.8
L angles added to bottom skin
Details
02-28-2010
3.0
Completed aileron bellcarnk supports
Details
02-27-2010
4.3
Completed rear spar modifications
Details
02-24-2010
1.0
Torqued wing mod bolts and repositioned wing
02-22-2010
6.0
Completed and bolted wing mods
Details
02-20-2010
4.0
Final drilling of wing root doubler/extrusion mods
Details
02-19-2010
2.0
Installed angles on rib 2
Details
02-18-2010
2.3
Located and drilled nose rib 1 angles
Details
02-17-2010
1.3
More challenges with nose rib 1
Details
02-16-2010
0.8
Located position for nose rib 1
Details
02-15-2010
1.5
Drilled top of new extrusion angle
Details
02-07-2010
6.0
Installed left wing root doubler
Details
02-04-2010
2.0
Backdrilled left wing extrusion angle
Details
01-23-2010
2.0
Drilled bolt holes where necessary
Details
01-18-2010
4.5
Removed spar rivets
Details
01-17-2010
3.5
Removed top skin left wing
Details
01-16-2010
2.0
Started wing mods on left wing
Details
11-24-2008
8.0
Polished top of left wing
Details
11-22-2008
4.5
Plans on the way / polished left wing bottom
Details
01-20-2008
3.8
Polished bottom of horizontal stab/elevator
Details
01-19-2008
3.8
Polished rudder
Details
01-17-2008
2.8
Right flap polished
Details
01-16-2008
2.0
Finished polishing left flap bottom
Details
01-15-2008
2.3
Left flap topside polished
Details
01-14-2008
2.0
Leaning more about polishing
Details
01-12-2008
3.5
Started polishing
Details
01-02-2008
0.8
Tested Nuvite polishing
Details
01-01-2008
1.8
Left wing top skin riveted
Details
01-01-2008
3.8
Completed left wing riveting
Details
12-31-2007
8.3
Started riveting left wing
Details
12-22-2007
4.0
Riveted top skin
12-22-2007
4.0
Deburred, primed and reassembled right wing
Details
12-22-2007
3.8
Completed right wing
Details
12-20-2007
5.5
Finished wiring right wing & started deburring
Details
12-19-2007
0.0
Wings passed EAA tech inspection
Details
12-19-2007
1.3
Routed AOA differential pressure tubes
Details
12-19-2007
0.8
Routed aileron trim cable
Details
12-18-2007
2.0
Installed tank senders/fitting and tested tanks
Details
12-18-2007
1.3
Attached pitot LED wires and ground
Details
12-17-2007
4.3
Installed pitot nutplates and controller
Details
12-16-2007
4.3
Mounted conduit and ran wires
Details
12-15-2007
1.0
Installed left wing aileron bellcrank
Details
12-15-2007
3.5
Cut wire and made/mounted conduit brackets
Details
12-14-2007
2.3
Installed right wing aileron bellcrank and rod
Details
12-13-2007
3.3
Installed AOA ports
Details
12-11-2007
1.5
Closed aileron trim tabs and prepped for AOA
Details
12-10-2007
0.3
Re-closed elevator trim tab system
Details
12-09-2007
4.0
Rewired aileron and elevator trim tabs
Details
12-08-2007
10.5
Finished aileron trim tab
Details
12-07-2007
3.8
Cut out for aileron trim tab and made horn angle
Details
12-04-2007
2.5
Made trim tab trailing edge skin and channel
Details
12-03-2007
2.3
Re-made left wing aileron access cover
Details
12-01-2007
3.8
Placed and pre-drilled flaps and ailerons
Details
11-25-2007
3.8
Right fuel tank in place
Details
11-25-2007
2.5
Added extra nose rib to right wing
Details
11-24-2007
4.5
Completed 1st access cover and opened right wing
Details
11-23-2007
1.0
Installed & tested right tank fuel sender
Details
11-23-2007
2.0
Installed & tested left tank fuel sender
Details
11-22-2007
6.5
Fit left wing fuel tank and prepped senders
Details
11-14-2007
1.3
Completed heated pitot access cover/mount install
Details
11-11-2007
5.3
Added nose rib and started fitting fuel tank
Details
11-04-2007
6.0
Installed right wing landing light & made pitot mo
Details
11-03-2007
4.8
Installed left wing fiberglass tip
Details
11-02-2007
0.0
Process for making landing light lens
Details
11-02-2007
4.5
Installed landing light in left wing
Details
10-30-2007
4.3
Made light support channel and cut hole
Details
10-29-2007
4.3
Made landing light lenses and riblets
Details
10-27-2007
1.5
Installed right wing fiberglass tip
Details
10-27-2007
0.0
Fuel tank update
Details
10-27-2007
5.0
Completed left leading edge placement & drilling
Details
10-26-2007
1.5
Determined top leading edge overlap and rivet line
Details
10-25-2007
0.5
Match drilled left wing top to front spar
Details
10-24-2007
5.0
Cut pitot access cover/hole & riveted left wing bo
Details
10-23-2007
2.5
Cut access holes in left wing bottom
10-21-2007
7.8
Drilled left wing leading edge
Details
10-20-2007
7.0
Made another leading edge skin, trimmed and primed
Details
10-17-2007
0.0
Fuel tanks arrive
Details
10-11-2007
4.3
Trimmed right wing tip
Details
10-10-2007
6.8
Placed and drilled leading edge skin top side
Details
10-09-2007
10.0
Riveted right wing bottom
Details
10-08-2007
7.8
Nearly ready to rivet right bottom skin
Details
10-07-2007
6.0
Attached nose ribs and trimmed nose skin bottom
Details
10-06-2007
9.0
Corrected alignment of left wing
Details
09-29-2007
5.3
Right wing bottom skin placed
Details
09-29-2007
4.8
Cut and placed right wing top skin
Details
09-24-2007
0.0
Proposed solution to wing skin mess-up
Details
09-23-2007
4.0
Drilled right wing top skin & discovered error
Details
09-22-2007
1.8
Cut remaining wing skins
Details
09-22-2007
3.0
Bent leading edge skins
Details
09-21-2007
2.5
Drilled left wing bottom skin
Details
09-20-2007
4.0
Cut and pre-drilled left wing bottom skin
Details
09-19-2007
1.5
Prepared left wing bottom for skin
Details
09-15-2007
11.0
Top skin attached
Details
09-14-2007
2.3
Right wing skeleton cleaned, primed and riveted
Details
09-14-2007
3.0
Right wing nose ribs attached
Details
09-14-2007
2.3
Attached rear channel and trimmed / cut hole
Details
09-13-2007
3.3
Right wing rear ribs attached
Details
09-11-2007
4.0
Left wing skeleton riveted
Details
09-10-2007
1.3
Drilled aileron hole and cut rear channel tip
Details
09-09-2007
2.8
Attached rear channel to rear ribs
Details
09-05-2007
0.0
Test fit rear channel to ribs
Details
09-05-2007
2.8
Attached nose ribs and drilled to size
Details
09-03-2007
1.5
Started placing nose ribs
Details
09-03-2007
6.0
Left wing rear ribs attached to main spar
Details
09-02-2007
7.0
Added L angles to rear ribs 1 to 4
Details
09-01-2007
1.5
Nose rib grommets drilled
09-01-2007
5.0
Installed Aileron Bellcrank Supports & Support Cha
Details
08-31-2007
0.0
Test assembly of entire wing spar structure
Details
08-29-2007
2.8
Left wing dihedral set
Details
08-29-2007
0.0
Dihedral setting technique
Details
08-28-2007
5.0
Set dihedral on right wing spar
Details
08-26-2007
4.5
Test run on setting dihedral & drilling for bolts
Details
08-26-2007
3.5
Attached spar tips
Details
08-25-2007
2.0
Redo of rear channel splice
Details
08-25-2007
2.0
Rear channels complete
Details
08-24-2007
3.0
Rear Channels drilled
Details
08-24-2007
1.0
Completed wing rib support L angles
Details
08-23-2007
3.0
Completed bellcrank supports and aileron stops
Details
08-22-2007
4.0
Formed 2nd rear channel and misc.
Details
08-21-2007
1.5
More work on rear channel
Details
08-19-2007
6.0
More miscellaneous wing parts
Details
08-18-2007
8.0
Miscellaneous wing parts
Details
08-17-2007
0.0
Wing structure recap
Details
08-17-2007
2.5
Nose ribs complete
Details
08-16-2007
2.5
Finished left nose ribs
Details
08-15-2007
4.5
New nose rib form with metal faces
Details
08-14-2007
3.3
Trimmed and prepped all nose rib blanks
Details
08-13-2007
3.0
Marked nose ribs and experimented a bit
Details
08-12-2007
1.3
Test nose rib
Details
08-11-2007
7.5
Wing ribs complete
Details
08-11-2007
0.0
Lightening hole information
Details
08-10-2007
3.8
Completed forming wing ribs
Details
08-09-2007
0.0
Tested flanged lightening holes in wing ribs
Details
08-09-2007
3.0
Completed right #6 rib and both #5 ribs
Details
08-05-2007
1.5
Miscellaneous trimming and formed rib 6
Details
08-04-2007
2.5
Trimmed rib blanks
Details
08-04-2007
3.8
#7 to 9 wing ribs completed
Details
08-03-2007
2.0
Marked and drilled wing rib blanks
Details
07-30-2007
3.0
Rough cut nose and wing rib blanks
Details
07-30-2007
2.0
Formed first wing rib
Details
07-29-2007
1.5
Made nose rib form block
Details
07-29-2007
5.5
Completed wing rib form blocks
Details
07-28-2007
6.0
Work on wing rib forms
Details
07-26-2007
2.8
Match sanded wing rib edges
Details
07-25-2007
3.5
Rough cut wing rib form block & applied templates
Details
07-21-2007
4.0
Completed aileron bellcranks
Details
07-16-2007
1.8
Practiced riveting bellcrank
Details
06-16-2007
3.3
Fabricated aileron bellcrank parts
Details
06-15-2007
2.0
Center spar completed
Details
06-14-2007
3.5
Center spar riveted
Details
06-13-2007
2.0
Center spar parts cleaned and primed
06-12-2007
3.5
Center spar fabrication complete
Details
06-11-2007
2.8
Drilled all center spar uprights
Details
06-09-2007
1.0
Cut and marked uprights
Details
06-09-2007
1.5
Completed drilling webs to size
06-05-2007
1.0
Completed match drilling of bottom center spars
Details
06-04-2007
2.0
Top center spar caps match drilled & reamed
Details
06-03-2007
3.5
Center spar marked and drilled
Details
05-28-2007
1.5
Finished right wing spar
Details
05-27-2007
4.5
Solid riveting on right spar
Details
05-27-2007
2.0
Pre-assembled and bolted/clecoed spar
Details
05-26-2007
3.5
Right wing spar drilling complete
Details
05-26-2007
1.0
Right spar primed
05-26-2007
3.5
Right spar polished and cleaned
05-25-2007
1.8
Pre-drilled spar cap angles
05-25-2007
2.5
More spar drilling
Details
05-25-2007
3.5
Drilled misc spar parts to size
Details
05-22-2007
0.8
Completed pre-drilling of caps and doublers
Details
05-21-2007
2.3
Pre-drilled spar caps and one angle
Details
05-20-2007
3.0
Trimmed and sanded spar parts
Details
05-19-2007
3.5
Work on misc. right spar parts
Details
05-19-2007
0.8
Spot drilled upper and lower spar caps
Details
05-18-2007
1.5
Right spar lightening hole and caps/doublers
Details
05-17-2007
4.0
Marked and drilled right wing spar web
Details
05-06-2007
2.0
Left wing spar complete
Details
05-05-2007
6.0
Left wing spar riveting
Details
04-15-2007
3.5
Cut Center Spar Webs and OB spar cap angles
Details
04-15-2007
2.5
Bent Center Spar Webs
Details
04-14-2007
2.8
Cut web blank for right OB spar
Details
04-13-2007
2.5
Started riveting left OB spar
Details
04-12-2007
4.0
Learned standard riveting technique
Details
04-07-2007
5.0
Riveting problems - spar ruined
Details
04-06-2007
11.0
OB spar parts polished, cleaned and primed
Details
03-27-2007
3.0
Completed drilling outboard spars
Details
03-22-2007
1.0
Completed drilling left top spar cap angle
Details
03-21-2007
2.0
Center Spar Complete
Details
03-20-2007
4.5
Replaced center spar upright rivets
Details
03-19-2007
3.0
Completed 1st step drilling and all right top hole
Details
03-18-2007
2.8
Step one drilling on 6-14 rivets complete
Details
03-18-2007
5.5
Spar cap angles placed and pre-drilled
Details
03-18-2007
0.5
Final drilling procedure chosen
Details
03-17-2007
5.3
Placed and drilled nose rib angles and hat stiffen
Details
03-17-2007
2.0
Center spar riveted
Details
03-16-2007
2.0
Riveted caps to rear web
Details
03-15-2007
1.5
Practiced solid riveting
Details
03-15-2007
2.5
Cleaned and primed center spar parts
Details
03-13-2007
2.3
Practiced solid riveting
Details
03-13-2007
0.8
Drilled rear web and bottom spar cap out to larger
Details
03-12-2007
6.5
Center spar ready to prime and rivet
Details
03-11-2007
2.0
Center Spar drilled and aligned
Details
03-10-2007
5.5
Work on Center Spar bolt and rivet drilling/alignm
Details
03-10-2007
3.5
Completed bending center spar webs (front & rear)
Details
03-09-2007
3.0
Completed hat stiffeners and spar tips
Details
03-07-2007
2.3
Cut and lightened spar tips
Details
03-06-2007
1.0
Made lightening holes in web spars
Details
03-03-2007
8.0
Completed Top & Bottom Spar Cap Angles
Details
03-03-2007
0.0
Completed spar cap angles - Part 2
Details
03-02-2007
1.5
Completed all blanks for spars
Details
03-02-2007
1.3
Bent nose rib angles
Details
03-01-2007
3.5
Cut blanks for nose rib & spar cap angles plus cen
Details
02-27-2007
2.5
Completed pre-drilling wing spars
Details
02-26-2007
1.8
Finished pre-drilling right wing caps and doublers
Details
02-25-2007
1.3
Spot drilled caps and doublers
Details
02-25-2007
3.3
Completed pre-drillling right bottom cap and doubl
Details
02-24-2007
3.5
Flanged and marked left outboard spar web
Details
02-24-2007
2.5
Cut spar caps and doubler (also center spar caps)
Details
02-24-2007
3.0
Completed matched pre-drilling of OB spar webs
Details
02-17-2007
4.0
Cut wing spar webs
Details
02-04-2007
3.5
Ailerons finished - all control surfaces complete!
Details
02-03-2007
2.5
Final drilling on right aileron
Details
02-03-2007
6.5
Ailerons ready to prime and rivet
Details
02-02-2007
6.0
Laid out, cut and pre-drilled ailerons
Details
01-30-2007
2.3
Flaps completed
Details
01-29-2007
1.3
Deburred and cleaned right flap parts
Details
01-28-2007
4.3
Left flap complete
Details
01-27-2007
5.0
Located and drilled flap hinges
Details
01-20-2007
6.5
Flaps ready for hinges
Details
01-18-2007
2.0
Flap rib lines and rivet pitch laid out
01-16-2007
2.1
Made both aileron skins
Details
01-16-2007
1.5
Made 2nd flap skin
Details
01-15-2007
2.5
Completed first flap skin
Details
01-15-2007
1.5
Calculated bend lines for flap skins
Details
01-13-2007
2.0
Completed flap ribs
Details
01-13-2007
2.0
Completed aileron tips
Details
01-13-2007
2.0
Completed aileron ribs
Details
01-12-2007
3.5
More work on flap ribs
Details
01-07-2007
1.5
Completed Flap and Aileron Rib Forms
Details
01-02-2007
1.3
Began flap and aileron ribs
Details
08-06-2006
1.0
1st successful bend
Details
SITE NAVIGATION
Contact Builder
Zodiac CH 650 Home
All
Avionics
Empennage
Engine
Fuselage
Miscellaneous
None
Planning
Shop Supplies
Tools
Total Hours
Wings
Work Area
Copyright © 2001-2013 Matronics. All Rights Reserved.