Powered By Kitlog Pro v2.0
Larry Winger's 601XL Project
Zodiac CH 650
Miscellaneous
74 Logs Found
Date
Hours
Work Log Summary
Details
01-06-2013
0.0
2 - Pounds and pounds of rivet mandrels
Details
01-06-2013
0.0
1 - Restored garage for two cars
Details
01-05-2013
7.0
Trimmed wing roots and attempted wing install
Details
01-03-2013
0.0
4 - Hangar pictures
Details
01-03-2013
0.0
3 - Moved project to EAA Builder Center
Details
01-03-2013
2.3
2 - Miscellaneous last minute installations
Details
01-01-2013
0.0
N819P Open House today
Details
12-29-2012
3.3
1 - Attached nose wheel fairing
Details
12-28-2012
2.0
5 - Wired rudder strobe
Details
12-28-2012
2.0
4 - Cut and placed rudder strobe fairing
12-28-2012
0.8
3 - Secured upper rudder hinge and strobe wire
12-28-2012
1.0
2 - Removed and rerouted strobe wire
Details
12-21-2012
1.5
3 - Installed left wheel fairing
Details
12-21-2012
3.3
2 - Installed right wing fairing
Details
12-21-2012
1.0
1 - Finished left attachment bracket install
Details
12-20-2012
4.8
Mounting brackets for main wheel fairings
Details
12-13-2012
2.5
Replaced canopy, center console/side panels
Details
12-12-2012
1.4
1 - Prepped and painted center console & panels
Details
12-11-2012
26.0
A day of flying and odd jobs
Details
12-09-2012
1.9
1 - Reattached rubber canopy seals
Details
12-04-2012
0.8
2 - Temporarily replaced wire covers
Details
12-04-2012
0.8
1 - Reattached nose gear safety wire
Details
11-21-2012
0.0
Took a break and took to the air
Details
11-20-2012
3.0
Wire routing and ELT fix
Details
11-19-2012
1.5
2 - Attached rear strobe and tested ELT
Details
11-19-2012
1.5
1 - Installed SCAT hoses to cabin air vents
11-17-2012
2.0
2 - Installed cabin heat control cable
Details
11-17-2012
2.5
1 - Removed canopy and riveted top skin
Details
11-12-2012
0.0
1 - It's official now -- I can build an aeroplane
Details
10-19-2012
3.8
Labeled instrument panel
Details
10-14-2012
0.5
2 - Rearranged panel switches
Details
10-14-2012
1.0
1 - Secured stick grip cables around center suppor
Details
09-29-2012
0.0
Passed Sport Pilot Practical Test
Details
08-25-2012
1.5
Wired flap motor and installed new capacitor
Details
08-18-2012
1.0
Fixed brake fitting leak
Details
08-12-2012
4.5
Made CAD of busses and labeled
Details
08-11-2012
8.5
Completed stick grip wiring harness
Details
08-07-2012
3.0
Completed stick grip wiring D sub connectors
Details
08-06-2012
2.3
Wired co-pilot side D-sub connector for stick grip
Details
08-05-2012
6.6
Started wiring stick grip connectors
Details
08-04-2012
2.5
3 - Wired elevator trim LED indicator
Details
08-04-2012
3.8
2 - Routed elevator trim cable
Details
05-01-2012
0.0
Reinstalled Kitlog
Details
10-20-2011
0.8
Installed ELT and soldered 1st lug
Details
10-17-2011
2.3
Installed battery and master solenoid relay
Details
10-16-2011
2.5
Fabricated battery box
Details
10-15-2011
2.5
Installed ELT and panel switches
Details
10-11-2011
1.5
Nosebowl fitting complete and misc.
Details
10-10-2011
3.5
2 - Made seat back supports and torqued exhaust
Details
10-10-2011
3.3
1 - Installed seat belts
Details
10-08-2011
0.0
2 - Tip for finding the tip of the spinner
Details
10-07-2011
0.0
Seat cushions and center console cover arrived
Details
09-05-2011
0.0
Picture of swivel bolt mechanism
Details
08-08-2010
0.0
Fuel tank ready to install
Details
01-03-2010
1.0
Made PVC chocks
Details
11-29-2009
0.0
Moved Kitlog Pro to Macbook
Details
05-21-2009
0.0
Great online resource for builders
Details
04-14-2009
0.0
NTSB report on 601XL sent to FAA
Details
02-28-2009
0.0
Learning oxyacetylene welding
Details
01-27-2009
0.0
Part 2: Technique for matching bulkhead holes
Details
01-27-2009
0.0
Part 1: Technique for matching bulkhead holes
Details
12-31-2008
0.0
Confirmation of modifications with ZAC
Details
08-29-2008
0.0
Notes on using a laser level for alignment
Details
08-26-2008
0.0
Update on 601XL to 650 upgrade
Details
08-22-2008
0.0
Reinstalled Kitlog Pro
Details
08-06-2008
1.8
Busy month away from building...but back
Details
06-27-2008
0.0
2nd Anniversary of my project
Details
06-21-2008
0.0
Note on Project Status
Details
01-27-2008
0.0
Moved horizontal stab to hangar
Details
01-26-2008
0.0
Moved wings to hangar
Details
01-21-2008
0.0
Visit to Ken Smith and his new 601XL
Details
01-16-2007
0.0
Bend Line Calculator addition ready for testing
Details
01-13-2007
0.0
Why scratch build...why not scratch build
Details
10-06-2006
0.0
Attended FWF Workshop with William Wynne
Details
SITE NAVIGATION
Contact Builder
Zodiac CH 650 Home
All
Avionics
Empennage
Engine
Fuselage
Miscellaneous
None
Planning
Shop Supplies
Tools
Total Hours
Wings
Work Area
Copyright © 2001-2013 Matronics. All Rights Reserved.