Powered By Kitlog Pro v2.0
Larry Winger's 601XL Project
Zodiac CH 650
Empennage
9-25-2006
< Previous Log Entry
Next Log Entry >
Date:
9-25-2006
Number of Hours:
2.25
Manual Reference:
Brief Description:
Drilled and clecoed stabilizer skeleton
The fiberglass tail tips arrived today from Zenith and that coincided perfectly with my chance to drill and cleco the stabilizer skeleton. Everything went very smoothly.
Tail tips in place -- sort of
A long way from pieces of flat aluminum
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Zodiac CH 650 Home
Category
# Logs
# Hours
All
1084
3152
Avionics
77
284
Empennage
93
231
Engine
87
293
Fuselage
306
915
Miscellaneous
132
294
None
2
Planning
22
21
Shop Supplies
1
2
Tools
22
4
Total Hours
32
Wings
296
1103
Work Area
14
5
Copyright © 2001-2024 Matronics. All Rights Reserved.