KitLog pro

Powered By Kitlog Pro v2.0

Larry Winger's 601XL Project
' style=
Date:  9-25-2006
Number of Hours:  2.25
Manual Reference:  
Brief Description:  Drilled and clecoed stabilizer skeleton

The fiberglass tail tips arrived today from Zenith and that coincided perfectly with my chance to drill and cleco the stabilizer skeleton. Everything went very smoothly.
' style=

Tail tips in place -- sort of

Tail tips in place -- sort of

' style=

A long way from pieces of flat aluminum

A long way from pieces of flat aluminum

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.