KitLog pro

Powered By Kitlog Pro v2.0

Larry Winger's 601XL Project
' style=
Date:  10-19-2006
Number of Hours:  1.50
Manual Reference:  6T3-2
Brief Description:  Made Elevator Center Channel & installed L angles

Fabricated the Elevator Center Channel and several feet of standard L angle for future work. Marked the two centermost Elevator Ribs for the standard L angle used to attach the channel, drilled and clecoed them in place, and trimmed them to size.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.