03-07-2013
|
9.00
|
Canopy frame, fitted, trimmed, and assembled
|
Details
|
|
|
03-07-2013
|
2.50
|
Canopy frame fit, canopy bubble fit, R wing moved
|
Details
|
|
|
03-05-2013
|
9.00
|
Canopy frame assembly, corrosion treated
|
Details
|
|
|
03-04-2013
|
7.00
|
Canopy frame, panel, shroud and canopy work
|
Details
|
|
|
01-04-2013
|
8.00
|
Cabin misc and wire routing, drive to collect pane
|
Details
|
 |
|
08-23-2012
|
9.00
|
Pitot assembly, wings moved in, tips glassed
|
Details
|
|
|
08-21-2012
|
9.50
|
Servo rod redo and fit, stab tips and elvator tips
|
Details
|
|
|
08-20-2012
|
6.50
|
Supplies, Finalized the compass tray,
|
Details
|
|
|
08-17-2012
|
9.50
|
SP7 brckt fabricated, fitted..Pitch srvo instlled
|
Details
|
|
|
08-15-2012
|
9.00
|
workshop, AHRS bracket, AP servo arm and bellcrank
|
Details
|
|
|
08-14-2012
|
10.00
|
Compas bracket, SP-7 new bracket and fit
|
Details
|
|
|
08-13-2012
|
9.50
|
servo brckt brace, compass re fitted, bracket adju
|
Details
|
|
|
08-03-2012
|
9.00
|
finalised servo installation, compass bracket fitt
|
Details
|
|
|
08-02-2012
|
10.50
|
Avionics installation, painting
|
Details
|
|
|
08-01-2012
|
9.00
|
Rear window fit, Pitch servo mounting design and f
|
Details
|
|
|
07-31-2012
|
9.50
|
Frame spacers fabricated, frame fitted, painting
|
Details
|
|
|
07-30-2012
|
7.50
|
Protective edging, shroud and frame adjustment and
|
Details
|
|
|
07-27-2012
|
9.00
|
Devices reinstalled, new cable bracket created and
|
Details
|
|
|
07-26-2012
|
9.50
|
Taping and assembly of frame parts and latch.
|
Details
|
|
|
07-25-2012
|
9.00
|
Painting - jettison pins refined - panel flanges t
|
Details
|
|
|
07-24-2012
|
9.00
|
Canopy masked, fitted, Painted all canopy frame pa
|
Details
|
|
|
07-23-2012
|
9.00
|
Hinges drilled, rear glass marked
|
Details
|
|
|
07-20-2012
|
8.50
|
Big cut! canopy cut and edged,
|
Details
|
|
|
07-19-2012
|
9.50
|
Supplies, bubble trimmed and polishing
|
Details
|
|
|
07-17-2012
|
8.00
|
Bubble prepped for cut, ears trimmed, misc outstan
|
Details
|
|
|
07-16-2012
|
9.00
|
Design ribs, canopy spacers,
|
Details
|
|
|
07-13-2012
|
8.00
|
Supplise, frame final fit, marked hinges to drill
|
Details
|
|
|
07-11-2012
|
9.50
|
Rib stiffeners made up,
|
Details
|
|
|
07-10-2012
|
9.00
|
Shroud skin prepped,first panel rib repair
|
Details
|
|
|
07-06-2012
|
6.50
|
Shroud frame parts made up, frame assembled
|
Details
|
|
|
07-05-2012
|
9.50
|
Canopy frame fabrication and assmbly, shroud final
|
Details
|
|
|
07-04-2012
|
9.00
|
Cabin interior fittings, panel brackets modified,
|
Details
|
|
|
06-29-2012
|
9.00
|
jettison assembly mod, final coat on painted parts
|
Details
|
|
|
06-28-2012
|
9.50
|
Canopy jettison, canopy frame, clocked jettison ar
|
Details
|
|
|
06-27-2012
|
9.50
|
Canopy frame, Parts prep&prime, Static bracket add
|
Details
|
|
|
06-26-2012
|
8.50
|
proper installation of latch, prep and prime of pa
|
Details
|
|
|
06-25-2012
|
8.00
|
cut slot, latch mech. assembly installed
|
Details
|
|
|
06-22-2012
|
9.00
|
Canopy latch begun, slotted the fuz wall
|
Details
|
|
|
06-21-2012
|
10.50
|
Deck to shroud fitting, hinge drilling,
|
Details
|
|
|
06-20-2012
|
10.00
|
Finalized all the deck fittings and installations,
|
Details
|
|
|
06-14-2012
|
10.00
|
Additional panel brackets, replaced bad rivets on
|
Details
|
|
|
06-13-2012
|
9.50
|
Deck rivets set, panel final installed with attach
|
Details
|
|
|
06-12-2012
|
9.00
|
Right side vent ass installed, deck rivets set
|
Details
|
|
|
06-08-2012
|
9.00
|
L Vent installed, vent brackets made up,
|
Details
|
|
|
06-07-2012
|
9.50
|
panel primed and fitted, vent brackets made up, de
|
Details
|
|
|
06-06-2012
|
9.50
|
F-703B bracket finalized and installed, vent brack
|
Details
|
|
|
06-05-2012
|
8.50
|
panel brackets completed, F703B and panel finalize
|
Details
|
|
|
06-04-2012
|
8.50
|
panel brackets, cleaned up cabin, covers in cabin
|
Details
|
|
|
06-01-2012
|
9.00
|
Panel rib final riveted, jettison machanism fixed.
|
Details
|
|
|
05-29-2012
|
8.50
|
Continued closing up the map box, panel rib marked
|
Details
|
|
|
05-28-2012
|
7.50
|
Map box final trim and construction,
|
Details
|
|
|
05-25-2012
|
9.00
|
riveting of deck, canopy ribs
|
Details
|
|
|
05-23-2012
|
8.50
|
canopy frame made up, final riveting and completio
|
Details
|
|
|
05-22-2012
|
9.00
|
canopy release handle installed, hinge bloack spac
|
Details
|
|
|
05-21-2012
|
8.00
|
Continued hinge blocks, release mech. installation
|
Details
|
|
|
05-18-2012
|
9.00
|
canopy release mechanism, hinge blocks
|
Details
|
|
|
05-17-2012
|
9.00
|
Assembly of full canopy frame, shroud drilling, hi
|
Details
|
|
|
05-16-2012
|
9.00
|
Map box continued, jettison mechanism assembled
|
Details
|
|
|
05-15-2012
|
8.00
|
Canopy shroud disassembly and prime
|
Details
|
|
|
05-14-2012
|
8.50
|
canopy shroud braces, parts fabrication, prep for
|
Details
|
|
|
05-11-2012
|
9.50
|
canopy shroud, fitment to deck and panel ribs
|
Details
|
|
|
05-09-2012
|
10.00
|
Designed and made a tool for edge forming, finaliz
|
Details
|
|
|
05-08-2012
|
9.00
|
Control bracket finalized and installed, canopy br
|
Details
|
|
|
05-04-2012
|
9.50
|
Final control cable face,
|
Details
|
|
|
05-03-2012
|
9.50
|
Supply shopping, new bracket made up and installed
|
Details
|
|
|
05-02-2012
|
9.50
|
cable bracket redo,
|
Details
|
|
|
05-01-2012
|
6.50
|
Cable brackets and installation of cables and brac
|
Details
|
|
|
04-27-2012
|
8.00
|
Front deck assemb. panel installed, brackets desig
|
Details
|
|
|
04-26-2012
|
9.50
|
front deck install, cable brackets and cables
|
Details
|
|
|
04-25-2012
|
9.00
|
Continued bleeding and eventual completion of brak
|
Details
|
|
|
04-24-2012
|
9.50
|
bought supplies to bleed brakes
|
Details
|
|
|
04-23-2012
|
9.50
|
brake system bleed, leak repair
|
Details
|
|
|
04-20-2012
|
9.00
|
Continued front deck install, brakes bled,
|
Details
|
|
|
04-19-2012
|
10.00
|
Finalized the front deck and fittings.....
|
Details
|
|
|
04-18-2012
|
10.00
|
Front upper deck riveting and fitting fabrication
|
Details
|
|
|
04-17-2012
|
9.00
|
Final assembly of front deck structure...
|
Details
|
|
|
03-29-2012
|
11.00
|
Interior design, cotter pin, interior painting
|
Details
|
|
|
03-28-2012
|
10.00
|
finalized second brakes installation, inside of ca
|
Details
|
|
|
03-27-2012
|
7.50
|
Brakes installation redo
|
Details
|
|
|
03-26-2012
|
9.00
|
Finalized Brake system but had to redo
|
Details
|
|
|
03-23-2012
|
8.00
|
Brake callipers and external lines assembly
|
Details
|
|
|
03-09-2012
|
10.00
|
Boost pump cover final installation and unit final
|
Details
|
|
|
02-13-2012
|
9.00
|
Reworked the seat back supports, installled the he
|
Details
|
|
|
02-09-2012
|
9.50
|
Sealing of belly, Battery box adjustment, heat shu
|
Details
|
|
|
02-03-2012
|
8.00
|
Firewall installations,
|
Details
|
|
|
02-01-2012
|
9.00
|
Fixed attach brackets, panel reinstall, interior c
|
Details
|
|
|
01-27-2012
|
8.50
|
research, bellcrank + pushrod, cabin interior
|
Details
|
|
|
01-26-2012
|
9.50
|
Firewall revisited, stripping and ducts
|
Details
|
|
|
01-25-2012
|
9.00
|
Cabin air vents and ducts assembled and installed.
|
Details
|
|
|
01-24-2012
|
9.00
|
Flap system clean up and re-install...
|
Details
|
|
|
01-23-2012
|
4.50
|
Half-day, seats installed and harnesses installed.
|
Details
|
|
|
01-20-2012
|
9.50
|
Final seraled up the firewall and recess and...
|
Details
|
|
|
01-19-2012
|
10.00
|
right side of firewall was bonded and sealed and l
|
Details
|
|
|
01-18-2012
|
9.00
|
Removed and cleaned and replaced major assemblies
|
Details
|
|
|
01-17-2012
|
9.00
|
continued Retrospective work begun with stripping
|
Details
|
|
|
12-15-2011
|
12.00
|
fitted the canopy bubble and re marked and located
|
Details
|
|
|
12-14-2011
|
11.00
|
some more forward deck riveting, a little more san
|
Details
|
 |
|
12-12-2011
|
11.00
|
Forward deck final dissasembly and re installation
|
Details
|
|
|
12-07-2011
|
10.00
|
ready to mount the first hinge blocks and vebnt sy
|
Details
|
|
|
12-06-2011
|
11.00
|
Tip up to forward deck hinge points and attachment
|
Details
|
 |
|
12-05-2011
|
8.00
|
Forward deck skinnning and full assembly
|
Details
|
 |
|
12-02-2011
|
10.00
|
Cabin forwared deck and panel modifications
|
Details
|
|
|
11-29-2011
|
8.00
|
Firewall drilling and locations.
|
Details
|
|
|
11-24-2011
|
11.00
|
Changes made to the drawings and designs, boost pu
|
Details
|
 |
|
11-15-2011
|
10.00
|
Continued retro work
|
Details
|
  |
|
11-11-2011
|
10.00
|
Continued with empenage and work outlined in Thurs
|
Details
|
  |
|
11-10-2011
|
10.50
|
Continued work on retro steps, empennage, fairings
|
Details
|
  |
|
11-09-2011
|
7.50
|
return to first outstanding work to work my way ba
|
Details
|
  |
|
11-08-2011
|
10.00
|
redo of the fuel lines system...drive for parts an
|
Details
|
  |
|
11-07-2011
|
10.00
|
Installation of new fuel lines and plumbing
|
Details
|
  |
|
11-04-2011
|
9.00
|
Fuel lines replacement, and make up
|
Details
|
  |
|
11-03-2011
|
9.50
|
Fwd deck continued, panel layout research, fuel li
|
Details
|
  |
|
11-02-2011
|
10.00
|
More panel research and discussion, final fit and
|
Details
|
  |
|
11-01-2011
|
10.00
|
Prime of forward deck parts
|
Details
|
  |
|
10-28-2011
|
10.50
|
Canopy frame screws, parts prep
|
Details
|
  |
|
10-27-2011
|
9.50
|
More struggle with screws and asembly of front dec
|
Details
|
|
|
10-26-2011
|
9.00
|
Aft cabin skin fitted and drilled to the cabin fra
|
Details
|
|
|
10-25-2011
|
9.50
|
Panel design made up and more parts fab
|
Details
|
|
|
10-24-2011
|
7.00
|
Canopy frame area finished painted
|
Details
|
 |
|
10-21-2011
|
10.00
|
Cabin frame area painted, Canopy frame assembled
|
Details
|
 |
|
10-20-2011
|
10.00
|
Panel research and templates and mockups created.
|
Details
|
  |
|
10-19-2011
|
7.50
|
Assembly and prep of parts for the forward deck an
|
Details
|
  |
|
10-18-2011
|
9.00
|
fitted the final canopy frame and all associted sh
|
Details
|
  |
|
10-17-2011
|
10.00
|
Began dry fit and assembly of the canopy framework
|
Details
|
  |
|
10-14-2011
|
9.50
|
Fabricated the new shims for the canopy frame asse
|
Details
|
  |
|
10-13-2011
|
10.50
|
After consultation with Gus at Vans (Wed) I measur
|
|
  |
|
10-12-2011
|
6.50
|
Re fabricated new brackets L and R - not drilled
|
|
  |
|
10-11-2011
|
10.00
|
Discussed a solution with Willem for the mistakes
|
|
  |
|
10-10-2011
|
9.00
|
Manufactured shims for outside brackets on canopy
|
|
  |
|
10-07-2011
|
10.00
|
Drilling of fitted canopy frame and canopy test fi
|
|
 |
|
10-06-2011
|
10.00
|
Re assembly and final fit of painted cabin frame a
|
|
 |
|
10-05-2011
|
8.00
|
Painting of first and some final coats fo rear cab
|
|
  |
|
10-03-2011
|
9.00
|
Prep of rear cabin assembly parts for paint
|
|
 |
|
09-30-2011
|
10.00
|
final fit for drilling of final assembly to cabin
|
|
 |
|
09-29-2011
|
10.50
|
Frame fix and panel beating
|
|
|
|
09-28-2011
|
7.15
|
Canopy frame stripped and re assembled
|
|
 |
|
09-26-2011
|
10.00
|
Canopy frame 3rd test fit - problems with fit and
|
|
 |
|
09-23-2011
|
10.10
|
Canopy frame fabrication and fit of new parts
|
|
 |
|
09-22-2011
|
10.90
|
canopy frame parts fabricated and mistakes re-fabr
|
|
|
|
09-21-2011
|
8.00
|
canopy frame assembly and 1st dry fit to cabin
|
|
 |
|
09-20-2011
|
10.00
|
cabin frame fabricationand test fit of parts
|
|
 |
|
09-19-2011
|
9.00
|
Begun work on the cabin frame. Cable ties used to
|
|
 |
|
08-22-2011
|
10.00
|
Cabin re-fit and Armrest mods
|
Details
|
|
|
07-18-2011
|
10.00
|
Elevator pushrods parts made up and prepped and pr
|
|
 |
|
06-09-2011
|
9.50
|
Baggage floor replaced
|
Details
|
 |
|
06-03-2011
|
10.00
|
Wing root fairing rubbers fitted and trimmed, fair
|
|
 |
|
05-20-2011
|
10.00
|
Holes cut then enlarged for flap pushrods
|
|
 |
|
05-05-2011
|
10.00
|
Gear mounts installed final L&R
|
|
|
|
05-04-2011
|
9.00
|
Gear mounts continued
|
|
  |
|
05-03-2011
|
10.00
|
Gear mounts drilled. prepped and fitted
|
|
 |
|
05-02-2011
|
10.00
|
Flaps system - fuz to wing
|
|
  |
|
04-29-2011
|
10.00
|
Flap actuator and motor housing box retro finalize
|
Details
|
  |
|
04-21-2011
|
10.00
|
Rear fuz work and cabin covers primed
|
|
  |
|
04-20-2011
|
10.00
|
Baggage area skins primed, prepped and fitted
|
|
  |
|
04-19-2011
|
10.00
|
Pedals finalized and dry fitted in forward positio
|
|
  |
|
04-18-2011
|
10.00
|
Pedals and baggage area fittings
|
|
  |
|
04-15-2011
|
10.00
|
Pedals L&R and fuz retro
|
|
  |
|
03-08-2011
|
7.50
|
Flaps pushrods assembled and tested
|
|
 |
|
02-28-2011
|
4.50
|
Final installation of Steps L&R
|
Details
|
 |
|
02-25-2011
|
5.00
|
Step shims final fit and drilled
|
|
  |
|
02-24-2011
|
6.50
|
Step shims dry fitted and trimmed
|
|
  |
|
02-23-2011
|
6.50
|
Continued work on Seatbacks and fabricated step sh
|
|
 |
|
02-18-2011
|
9.00
|
Steps installation (Right)
|
Details
|
|
|
02-18-2011
|
10.00
|
Steps installation
|
Details
|
|
|
02-17-2011
|
10.15
|
Forward upper skin,"... new Gussets and angles"
|
|
 |
|
02-16-2011
|
8.75
|
Fit, dimpled and drilled baggage area decking skin
|
|
|
|
02-16-2011
|
8.75
|
Cut holes for steps retrofit
|
Details
|
 |
|
02-11-2011
|
9.50
|
Work on Fuz
|
|
  |
|
02-11-2011
|
9.00
|
Work on Fuz
|
|
  |
|
02-10-2011
|
9.00
|
Work on Fuz
|
|
  |
|
02-10-2011
|
9.00
|
Work on Fuz
|
|
  |
|
02-09-2011
|
9.50
|
Wor begun on Fuselage
|
|
  |