KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  11-11-2011
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Continued with empenage and work outlined in Thurs

Continued the final drilling and riveting of vert stab attach plate to stab spar,
Re installed the V-stab in place but found a problem with interference from the Tie down bracket rivets, had to drill them all out (6 rivets), remove the bracket and re drill and re rivet with flush head pop rivets. some more work on the cable exit fairings.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.