KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  12-14-2011
Number of Hours:  11.00
Manual Reference:  
Brief Description:  some more forward deck riveting, a little more san

Spent another 3.4 hours on maintenence work, can provide details but basically re painting and re wiring the washline and re-fitting. Also checked several lights not working and checked a faulty stoe with Don's electrician. Was asked to fix a leaking water meter which I attempted by could not fix. Returning to the RV I worked a little more on the now dried fiberglass tips and bits, they still require much sanding and a little triming for a final fit, rivet and screw. Did some more riveting on the forward deck but could not reach some and soent some time making a bucking bar to reach from an iron bar I keep in the car. Spent 3.5 hours on Avcom and mailing you and Gus re the fuel booster pump and which of the two choices to go for and why. Started cutting the Panel angle flange parts in the evening before leaving at 8 when I got a call about a crash near my house -see email attachment.
' style=

rough points of mitre cuts to get desired bend was not easy freehand

rough points of mitre cuts to get desired bend was not easy freehand

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.