KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  12-12-2011
Number of Hours:  11.00
Manual Reference:  
Brief Description:  Forward deck final dissasembly and re installation

took apart the front deck assembly for the final time to prime all the ,matching surfaces then final drilled, deburred and dimpled the applicable holes for riveting. re assembled the entire assembly and began riveting part by part. Also made up F-697 channel and primed then clamped in place on sub panel then match drilled and cleco'd in place. Also mad eup and fitted the forward fuselage channel F-643-1 following the same process of clamping, match drilling, processing the holes and cleco for riveting.
' style=

F-697 channel riveted to sub panel

F-697 channel riveted to sub panel

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.