KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  7-27-2012
Number of Hours:  9.00
Manual Reference:  
Brief Description:  Devices reinstalled, new cable bracket created and

With the UHMW fixed to all necessary parts the relavant parts were re-assembled into the various devices all reinstalled in the cabin and on the deck.

A problempicked up earlier was the 'kinked' engine control cables, I spent time considering then designing a solution until finally a suitable bracket was fabricated, assembled then installed on the previous sub panel flange location - this resolved the issue completely.

Also started cutting and fitting plastic edging to the sharp edges all over the fuselage particularly the front and firewall which had cut me seriously a number of time in the past few days work in those areas.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.