KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  4-27-2012
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Front deck assemb. panel installed, brackets desig

I continued riveting the major and smaller components to the front deck, most rivets were hand 'squeezed' and the necessary bolts installed, torqued and safetied accordingly. There are more than 100 rivets in this major assembly so an ongoing effort which was delayed from time to time for work on the control cable brackets (fore and aft), front deck skin match-drilled and fitted, and the attachment brackets installed. Having installed the 3 main and cabin heat cables in postion on the forward bracket (with nutplates) I went about drawing up the layout template for the aft bracket on which the knobs are mounted that is fitted to the panel.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.