KitLog pro

Powered By Kitlog Pro v2.0

RV-7A Tip-up QB build project
' style=
Date:  2-18-2011
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Steps installation

Included drilling and riveting step plates to fuz
' style=

hole cut in fuz bottom and tourque tube installed

hole cut in fuz bottom and tourque tube installed

' style=

Top view of assembly on Left side

Top view of assembly on Left side

' style=

detail of the blocks at the 2 attachment points inside the fuz.

detail of the blocks at the 2 attachment points inside the fuz.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.