KitLog pro

Powered By Kitlog Pro v2.0

Nate's RV-7 Site
Work Logs Found: 191
Category Work Time: 402 Hours
 Date
Hours
Work Log Summary

Details

 02-26-2020
4.00
Right Wing Fuel Tank Work
Details
       

 02-25-2020
2.00
Right Fuel Tank Work
Details
       

 02-24-2020
2.00
W-408 Wing Leading edge ribs and W-423 Joint Plate
Details
       

 02-24-2020
2.00
Right and Left Fuel Tank
Details
       

 02-23-2020
2.50
Right Fuel Tank
Details
       

 02-22-2020
1.50
Right Fuel Tank Match Drilling
Details
     

 02-21-2020
2.00
Fuel Tank Work #3
Details
       

 02-21-2020
3.00
Fuel Tank Work #2
Details
       

 02-21-2020
3.00
Fuel Tank Work #1
Details
       

 02-20-2020
5.00
Fitting Fuel Tank Z-Brackets
Details
       

 02-19-2020
2.00
Fuel Tank Z-Bracket Work
Details
     

 02-11-2020
3.00
Match Drilling Wing Skins and Leading Edge Rib
Details
       

 02-10-2020
1.50
Match Drilled Wing Skins
Details

 02-10-2020
2.00
Fuel Tank Fittings
Details
       

 02-07-2020
1.00
Match Drill Wing Skins
Details

 02-06-2020
1.50
Match Drill Wing Skins
Details

 02-06-2020
1.50
Fuel Tank Fittings
Details
     

 02-05-2020
0.50
Match Drill Wing Skins
Details

 01-23-2020
3.50
Fitting and Match drilling Wing Skins
Details
       

 01-22-2020
4.00
Right Wing Leading Edge
Details
       

 01-21-2020
2.00
Test fit Tank to the Wing
Details
       

 01-20-2020
4.00
Fuel Tank Z - Bracksts
Details
       

 01-20-2020
3.00
Fuel Tank Stiffeners T-711A-D
Details
       

 01-17-2020
2.50
Fuel Tank Z-Brackets and Baffle Flanges
Details
       

 01-16-2020
2.00
Fuel Tank Z-Brackets
Details
       

 01-15-2020
2.00
Removing twist from the wings on the jig
Details
       

 01-15-2020
3.00
Began fuel tank work
Details
       

 01-14-2020
6.00
Right Wing Leading Edge and Wing Skins
Details
       

 01-13-2020
6.00
Wing Leading Edge Rib work
Details
       

 01-09-2020
2.00
Hanging Wings in the Jig
Details
       

 01-07-2020
3.00
Fit Inboard Wing skins
Details
     

 01-03-2020
3.00
Inboard Wing Section and Wing Walk
Details
       

 01-03-2020
2.00
Cut and Match Drill Wing Walk
Details
       

 01-01-2020
4.00
Riveting Right Wing
Details
       

 01-01-2020
3.00
Right Wing Work
Details
       

 12-19-2019
4.00
Wing Jig Work - Left Wing
Details
       

 12-09-2019
4.00
Left Wing Work
Details
       

 11-29-2019
1.50
Wing jig/stand
Details
       

 11-28-2019
1.50
Wing Assembly Jig/Stand
Details
     

 11-26-2019
3.00
Wing Stand
Details

 11-25-2019
3.00
Priming Wing Ribs
Details
       

 11-25-2019
1.00
Final Rudder Rivets
Details
       

 11-24-2019
2.50
Prep Ribs for Priming
Details
     

 11-23-2019
3.00
Wing jig/stand
Details

 11-22-2019
3.00
Wing Jig/Stand
Details

 11-21-2019
4.50
Rear Spar Riveting
Details
       

 11-20-2019
3.00
Wing Structure Match Drilling
Details
     

 11-19-2019
4.50
Rear Spar and Wing Ribs
Details
       

 11-18-2019
2.50

Details
       

 11-12-2019
3.00
Spar, Rear Spar Riveting and Wing Tie Down Priming
Details
       

 11-11-2019
5.00
Wing Rib Prep
Details
       

 11-11-2019
1.50
Rear Spar priming
Details

 11-10-2019
4.00
Wing Rib Prep and Rear Spar Work
Details
     

 11-08-2019
3.00
Wing Rib Preparation
Details
       

 11-07-2019
4.00
Rear Spar Preparation
Details
       

 10-23-2019
2.00
Rear Spar
Details
     

 10-22-2019
2.50
Wing Tie Down Brackets
Details
       

 10-22-2019
1.00
Rolled Rudder Leading Edges
Details
       

 10-21-2019
2.50
Riveting the Trailing Edge of the Rudder
Details
       

 10-21-2019
1.50
Primed Left and Right Wing Spar Screw Countersinks
Details

 10-21-2019
1.00
Counter Sink #6 screw on spar flange
Details
       

 10-20-2019
3.00
Wing Spar Screw Countersinks
Details
     

 10-15-2019
1.00
Wing Tiedown Brackets
Details
       

 10-14-2019
2.00
Wing Tie Down Brackets
Details
       

 10-14-2019
2.50
Trimming Rear Spar Reinforcement Plates
Details
       

 10-11-2019
4.00
Wing Spar Nut Plates
Details
       

 10-10-2019
3.50
Wing Spat Nut plates #1
Details
     

 10-10-2019
0.50
Tie Down Spacer Marked
Details
     

 10-10-2019
1.50
Rudder Trailing Edge Proseal
Details
       

 10-10-2019
0.50
Practice kit trailing edge proseal
Details
       

 10-10-2019
0.50
Marked Rear Spar Reinforcement Bars
Details
       

 10-08-2019
0.50
Riveted on Left Elevator trim tab
Details

 10-07-2019
1.00
Wing Rib Flange Squaring Tool
Details
       

 10-07-2019
2.00
Rolling Elevator Leading edge
Details
     

 10-07-2019
1.00
More leading edge rolling
Details
       

 10-06-2019
1.00
Rolling Elevator Leading Edges
Details
       

 09-23-2019
0.50
Wings, Day #1
Details
       

 09-23-2019
1.00
Rudder Trailing Edge
Details
       

 09-23-2019
2.00

Details
       

 09-22-2019
1.50
Trim tab/Left Elevator fitting
Details
       

 09-22-2019
0.50
Trim tab Left elevator joining
Details
       

 09-22-2019
2.00
Riveting and Final fitting of the Trim Tab, Day 5
Details
       

 09-15-2019
1.00
Trim Tab construction Day 4
Details
       

 09-15-2019
1.50
Practice Project 3, Fianl assembly and trailing ed
Details
       

 09-14-2019
1.00
Trim Tab Construction Day 3
Details
       

 09-13-2019
1.50
Trim Tab Construction Day 2
Details
       

 09-12-2019
2.00
Elevator Trim Tab Construction, Day 1
Details
       

 09-11-2019
1.00
Attaching Rudder Skins
Details
       

 09-10-2019
1.50
Prepping the Electric Pitch Trim System
Details
       

 09-09-2019
2.00
Rudder Counterbalance Skin and Spar Riveting
Details
       

 09-05-2019
1.50
Rudder counter balance rib and skin
Details
     

 09-05-2019
2.50
Riveting the Rudder Skeleton
Details
       

 09-04-2019
2.00
Left Elevator Riveting
Details
       

 09-03-2019
1.00
Left Elevator Trailing Edge Complete
Details
       

 09-03-2019
2.00
Left Elevator Trailig Edge Work
Details
       

 08-04-2019
0.50
Brief Rudder work
Details
       

 08-03-2019
3.00
Working on the Rudder
Details
       

 08-02-2019
1.50
Left Elevator
Details
       

 07-19-2019
2.00
Left Elevator Work
Details
       

 07-18-2019
3.00
Left Elevator work
Details
       

 07-17-2019
1.50
Left Elevator work
Details
       

 07-17-2019
1.50
Left Elevator Work
Details
       

 07-16-2019
2.00
Left Elevator Work
Details
       

 07-15-2019
2.00
Right Elevator Work (continued)
Details
       

 07-14-2019
1.50
Right Elevator Final Assembly
Details
       

 07-13-2019
1.00
Sealing wooden work benches
Details

 07-13-2019
1.50
Right Elevator counter balance
Details
       

 07-05-2019
2.00
Back Riveting Table
Details

 06-20-2019
2.00
Right Elevator Skin Bending
Details
       

 06-20-2019
1.50
Back Riveting Table
Details
       

 06-19-2019
3.00
Right Elevator Skin Back Riveting
Details
       

 06-18-2019
3.00
Right Elevator Assembly
Details
       

 06-17-2019
3.00
Right Elevator Assembly
Details
       

 06-17-2019
1.00
Right Elevator Assembly
Details
       

 06-16-2019
2.00
Right Elevator Assembly
Details
       

 06-14-2019
4.00
Horizontal Stabilizer
Details
       

 06-13-2019
3.00
Riveting the Vertical Stabilizer Skin
Details
       

 06-11-2019
3.00
Horiztonal Stabilizer
Details
       

 06-10-2019
1.50
Right Horizontal Stabilizer
Details
       

 06-09-2019
2.00
Riveting Horizontal Stabilizer
Details

 06-06-2019
3.00
Riveting Horizontal Stabilizer
Details

 06-05-2019
2.00
Riveting Horizontal Stabilizer Skin
Details
     

 06-05-2019
2.00
Priming Elevator and Rudder components
Details
       

 06-04-2019
2.00
Riveting the Vertical Stabilizer
Details
       

 06-03-2019
0.30
Horizontal Stabilizer work HS-411BPP
Details
       

 05-30-2019
2.50
Inventory Wing kit parts
Details
       

 05-30-2019
3.00
EAA Technical Counselor Visit and Horizontal Stabi
Details

 05-28-2019
0.30
Wing Kit Arrival
Details
       

 05-08-2019
1.00
HS-411BPP Attatchment
Details
       

 05-08-2019
1.00
Horizontal Stab Nose Rib Installation
Details
       

 05-03-2019
1.50
Horizontal Stabilizer Riveting (Final)
Details
       

 05-02-2019
3.00
Horizontal Stabilizer Riveting
Details
       

 05-02-2019
3.00
Horizontal Stab Riveting (Continued)
Details
       

 05-01-2019
4.00
Riveting the Horizontal Stab Spars
Details
       

 04-30-2019
2.00
Riveting Empennage Components
Details
       

 04-29-2019
2.00
Priming Empennage Parts
Details
       

 04-25-2019
3.00
Primer Work Continued
Details
       

 04-24-2019
2.00
Empenage Priming
Details
       

 04-23-2019
2.00
Deburring Rudder and Priming Prep
Details
       

 04-22-2019
2.00
Finishing up Rudder Frame Work
Details
       

 04-03-2019
0.50
Rudder Trailing Edge Match Drilling
Details
       

 02-14-2019
2.00
Rudder Frame work
Details
       

 02-12-2019
2.00
Rudder Frame Match Drilling
Details
       

 02-11-2019
1.50
Rudder Work -- Skin Stiffeners
Details
       

 02-11-2019
1.00
Rudder and Elevator Counter Balance Weights
Details

 02-10-2019
1.00
Rudder Work
Details

 02-09-2019
1.00
Rudder
Details
       

 02-08-2019
1.00
Rudder Work, cont...
Details
       

 02-08-2019
1.00
Rudder Work
Details
       

 02-08-2019
2.00
Rudder
Details
       

 01-30-2019
1.50
Left Elevator Work, Cont...
Details
       

 01-30-2019
1.00
Left Elevator Work, cont..
Details
       

 01-30-2019
1.50
Left Elevator Work
Details
       

 01-30-2019
1.50
Left Elevator Construction
Details
       

 01-27-2019
2.50
Right Elevator Work, Cont...
Details
       

 01-27-2019
1.50
Right Elevator Work
Details
       

 01-27-2019
1.50
Right Elevator Counterbalance Work
Details
       

 01-22-2019
1.50
Right Elevator Reinforcement plates
Details
       

 01-22-2019
1.00
Right Elevator
Details
       

 01-21-2019
1.00
Vertical Stab Reinforcement Plate
Details
       

 01-21-2019
1.50
Right Elevator
Details
       

 01-21-2019
0.50
Practice project #3
Details

 01-21-2019
1.50
Horizontal Stabilizer Reinforcement Bars
Details
       

 01-11-2019
2.00
Priming Work, Practice Kit
Details
       

 01-11-2019
3.00
Practice Kit #2
Details
       

 01-10-2019
1.00
Vertical Stab Skin dimpling and Deburring
Details
     

 01-10-2019
2.00
Horintal and Vertical Stab Dimpling and Deburring
Details
       

 01-09-2019
1.50
Vertical Stab Work
Details
       

 01-09-2019
2.00
Vertical and Hroizontal Stab Dimpling and Deburrin
Details
       

 01-08-2019
1.00
Vertical Stab Work
Details
       

 01-08-2019
1.00
Vertical Stab Work
Details
       

 01-08-2019
1.00
Vertical Stab VS-707 damage
Details
       

 12-19-2018
4.00
Vertical Tail Work
Details
       

 12-19-2018
2.00
Dimpling Empenage Spars
Details
       

 12-19-2018
2.00
Deburring and Dimpling
Details
       

 12-18-2018
2.00
Right Horizontal Stab
Details
     

 12-18-2018
4.00
Dimpling Table, Vertical Stab, Deburring and Dimpl
Details
       

 12-10-2018
2.00
Right Horiz. Stab
Details
     

 12-09-2018
3.00
Right Horiz. stab.
Details

 12-08-2018
2.00
Right Horiz. stab
Details
       

 12-07-2018
1.50
Left Horiz. Stab.
Details

 12-06-2018
2.00
Left Horiz. Stab.
Details

 12-05-2018
1.00
Left Horz. Stab.
Details
     

 12-04-2018
1.50
Left Horizontal Stabilzer Skin
Details
       

 12-04-2018
1.00
Left Horizontal Stab Skinning
Details
       

 12-03-2018
1.50
Horizontal Stab Spar Work
Details
       

 11-28-2018
2.00
Horizontal Stab Rough fit
Details
       

 11-28-2018
3.00
Horizontal Stab Forward Spar
Details
       

 11-11-2018
3.00
Rear and Fwd Spar Work
Details
       

 11-10-2018
4.00
Horizontal Stab Rear Spar
Details
       

 10-23-2018
2.00
Received Empennage Kit in the
Details
       










Copyright © 2001-2020 Matronics. All Rights Reserved.