KitLog pro

Powered By Kitlog Pro v2.0

Nate's RV-7 Site
' style=
Date:  5-14-2021
Number of Hours:  2.00
Manual Reference:  Sect 8-3
Brief Description:  Preparing the F-711 Bulkhead

In this work session I prepared and match drilled the F-711C Horizontal Stabilizer Attatchment Bar to the F-711A&B Bulkhead, and also cut, filed, and sanded the area where the elevator control arms will articulate fore and aft. I still have to trim, and match drill the F-711D (AA6 125 x 3/4 x 3/4). The plans call for this piece to be 6 5/32" inches long, but at that length the bar is too long and will need to be trimmed down in the next work session.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.