KitLog pro

Powered By Kitlog Pro v2.0

Nate's RV-7 Site
' style=
Date:  10-21-2020
Number of Hours:  3.50
Manual Reference:  Sect 7-6
Brief Description:  Fuel Tank Sealing, Day 4

I was able to rivet the rib in the left and the right tank. This method works!!!! It was much easier to set the rivets when I was no longer fighting the constant drip of fuel sealant on my tools. I was also able to make sure each rivet was properly set.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.