KitLog pro

Powered By Kitlog Pro v2.0

Nate's RV-7 Site
' style=
Date:  10-21-2020
Number of Hours:  3.50
Manual Reference:  Sect 7-6
Brief Description:  Fuel Tanks, Day 4

In this work session I taped up the inside of the the left and the right tank in preparation for applying sealant and riveting. I then instaled and clecoed four ribs, two in the left tank and two in the right tank for a total of four ribs, then set the tank aside for the sealant to set.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.