KitLog pro

Powered By Kitlog Pro v2.0

Nate's RV-7 Site
' style=
Date:  4-23-2021
Number of Hours:  3.00
Manual Reference:  Sect 8-2
Brief Description:  Building the Upper F-705A Bulkhead

In this work session I worked on the Upper 705A seat back bulkhead. I match drilled the F-705K & L parts to the F-705F Channel. I accomplished by drawing a line down the center of each respective mating surface, clamping, then sequentially drilling and clecoing each hole as I went down the line. Once I completed the F-705L, I repeated the process on the F-705K.

To match drill the F-705J, I drew a line along the directed rivet line and marked each rivet poisition, beginning the first hole 1/4" x 1/4" from the left side, then marked a rivet hole every 1 31/32" interval. Then I deduced the correct vertical position of the F-705J on the F-705F using math to find the position which left a 1/8" gap between the inside edge of the F-70J and the top of the F-705F.

I still have to accomplish two more tasks on the F-705K:
1) I have to countersink the rivet holes on the top of the F-705K.
2) I have to impart a 4 degree bend onto the F-705K

I also countersunk the rivet positions for the K1000-08 nutplates on the F-705D-L & -R

I also still have to drill the F-661EF Flap Bearing Blocks.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.