Brief Description: Prep and Rivet the F-704C to the F-704A
In this work session, I worked on prepping and riveting the Left and Right F-704C & -704D to the respective F-704A & -704B. First I matched the respective parts together, then I marked and then filed down the -704C and -704D parts to ensure the bushings will fit completely through the holes. I then deburred all of the match drilled holes, and clecoed the C and D parts in place with the Close tolerance bolts in place to ensure a satisfactory fit. I then installed the AN470AD4-5 rivets. I later installed the F-704G Center Section Vertical Bars with AN426AD4-14 rivets to hold them in place.