KitLog pro

Powered By Kitlog Pro v2.0

Nate's RV-7 Site
' style=
Date:  1-12-2021
Number of Hours:  6.00
Manual Reference:  Sect 7-8
Brief Description:  Prepping fuel tanks for closing

In this work session I began the final work prior to closing and sealing the fuel tanks. The three measly pictures don't do the amount of work completed justice. I final drilled the and deburred the requisite rivet holes, then sealed the parts to the inspection hatches with fuel tank sealant. After that I put a small dab of fuel tank sealant over every rivet head, and put a final layer of sealant over the edges of the fuel tank walls and interior baffles. I then set the tanks in a warm part of the basement to allow the sealant to cure. There's not much left to completing these tanks, and I can't wait to be done.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.