KitLog pro

Powered By Kitlog Pro v2.0

Ron Lendon's Aircraft Mfg.
533 Logs Found 
 Date
Hours
Work Log Summary

Details

 10-08-2012
1.0
Airflow through Cowl
Details

 05-28-2012
2.5
Gascolator heatshield and cowling attach
Details
       

 05-28-2012
4.0
Aileron trim and gascolator heat sheid
Details
       

 05-27-2012
2.5
Routing wires for aileron trim tab
Details
       

 05-27-2012
4.5
Made up sholder harness attach points
Details
       

 05-26-2012
5.0
Documents holder, pitot plumbing
Details
       

 05-25-2012
0.8
Safety wired all control cables 2 of 2
       

 05-25-2012
0.8
Safety wired all control cables 1 of 2
Details
       

 05-25-2012
1.0
Rudder adjust travel, and tow bar
Details
       

 05-24-2012
1.5
Rivet fairleads for ailerons
Details
       

 05-23-2012
2.7
Aileron fairleads and horizontal stabilizer tips
Details
       

 05-22-2012
6.0
Make cables for ailerons
Details
       

 05-21-2012
5.0
Remade the upper elevator cable
Details
       

 05-20-2012
7.0
TheTail is cabled
Details
       

 05-19-2012
5.0
Beging making cables for the controls
Details
       

 05-18-2012
1.5
Saftey wired all control cables 1 of 2
Details
       

 05-14-2012
3.0
Attach right wing
Details
       

 05-13-2012
8.0
Left wing is attached, right wing is next
Details
       

 05-11-2012
3.0
Hang rudder, canopy seal, wing root trim
Details
       

 05-06-2012
2.5
Seal canopy flashing with sikaflex gray
Details
       

 05-03-2012
1.0
Putzing before theEAA meeting
Details
       

 05-02-2012
5.0
Rudder and right wing close to done
Details
       

 04-29-2012
2.2
Set Horizontal Stabilizer
Details
       

 04-29-2012
2.2
Move rear spar attach plate, wing wiring
Details
       

 04-29-2012
2.2
Hung tail feathers
Details
       

 04-28-2012
3.0
Set horizontal stabilizer, test run engine
Details
       

 04-27-2012
4.0
Tram wing tips and set horizontal stabilizer
Details
       

 04-20-2012
3.0
Rivet canopy flashing, grind welds on cowl
Details
       

 04-19-2012
1.2
Fitting Canopy Flashing 5 of 5
Details
       

 04-19-2012
1.2
Fitting Canopy Flashing 4 of 5
Details
       

 04-19-2012
1.2
Fitting Canopy Flashing 3 of 5
Details
       

 04-19-2012
1.2
Fitting Canopy Flashing 2 of 5
Details
       

 04-19-2012
1.2
Fitting Canopy Flashing 1 of 5
Details
       

 04-18-2012
2.0
Fit and cleco inner flashing for the canopy
Details
       

 04-16-2012
1.5
Pilot drill L-Angles for canopy sides
Details
     

 04-16-2012
1.5
Creating the side attachments for the canopy
Details
       

 04-15-2012
0.5
Unload canopy and cover it
Details
       

 04-15-2012
2.0
Marked and trimmed sides of canopy
Details
       

 04-15-2012
2.5
Canopy latch mechanicals'
Details
       

 04-15-2012
0.5
Cable routing for canopy latch
       

 04-14-2012
2.0
Prep canopy latch cable through front hoop
Details
     

 04-14-2012
2.0
Fresh air ducts
       

 04-13-2012
2.0
Fresh air ducts
Details
       

 04-12-2012
3.0
Canopy Flashing
Details
       

 04-11-2012
2.5
Canopy frame flashing
Details
       

 04-10-2012
2.0
Canopy frame work
Details
       

 04-09-2012
3.0
Canopy Flashing
Details
       

 04-06-2012
4.0
Odds and ends
Details
     

 04-02-2012
1.5
Pilot drilling canopy
Details
       

 04-02-2012
0.5
Open holes to 5/16" in canopy
Details
       

 04-02-2012
1.0
Fastening canopy to the hoops
Details
       

 04-01-2012
4.0
Fit and glue the front and rear seals
Details
       

 03-31-2012
5.0
Making rear hoop template
Details
       

 03-31-2012
2.0
Fitting rear tube to the template
Details
       

 03-31-2012
1.0
Fitting front hoop length for the canopy
Details
       

 03-30-2012
3.0
Canopy fitting phase 2, 2 of 2
Details
       

 03-30-2012
3.0
Canopy fitting phase 2, 1 of 2
Details
       

 03-29-2012
2.0
Canopy fitting phase 1
Details
       

 03-29-2012
2.0
Canopy fitting phase 1
Details
       

 03-27-2012
1.0
Trial fit canopy
Details
       

 03-27-2012
2.0
Canopy frame
Details
       

 03-26-2012
2.5
Canopy frame
Details
       

 03-25-2012
2.0
Fit canopy rails
Details
       

 03-25-2012
2.0
First canopy fiting
Details
       

 03-13-2012
3.0
Remake right front baffle
Details
       

 03-06-2012
2.0
Fitting & Wiring Flap Motor
Details
       

 02-16-2012
1.0
Bleed brakes
Details

 02-06-2012
2.0
Measure coax and wire flap motor switches
Details
       

 01-26-2012
2.0
Planning location for Remote Compass
Details
       

 01-24-2012
4.0
Mount ELT and rear spinner bulkhead
Details
       

 01-18-2012
8.0
Front Right Baffle
Details
       

 01-17-2012
8.0
Front Right Baffle
Details
       

 01-12-2012
1.5
Parking brake handle
Details
     

 01-11-2012
1.5
Bleed Brakes
Details

 11-30-2011
1.5
Protect wires and cabin heat air deflector
Details
       

 11-25-2011
2.0
Reset main gear
Details
       

 11-25-2011
1.5
Brake line routing
Details
       

 11-24-2011
2.0
Hide the brake line 3 of 3
Details
       

 11-23-2011
0.8
Hide the brake line 2 of 3
Details
       

 11-23-2011
0.8
Hide the brake line 1 of 3
Details
       

 11-16-2011
2.0
Route ignition and temp probe wires through FW
Details
       

 11-15-2011
2.0
Route oil pressure and temp lines through firewall
       

 11-14-2011
2.0
Safety wired the cables
       

 11-13-2011
2.0
Putzing
Details
       

 11-13-2011
1.5
Cabin heat cable
Details
       

 11-12-2011
2.5
Carb heat cable placement
Details
       

 11-11-2011
2.5
Mixture and Carb heat cables
Details
       

 11-09-2011
3.0
Route brake lines from parking brake to caliper
Details
       

 11-08-2011
2.0
Mount parking brake, route lines
Details
       

 11-07-2011
3.0
Parking brake mechanicals
Details
       

 11-06-2011
1.0
Steering rod boots
Details
       

 11-06-2011
2.0
Making things airworthy
Details
       

 11-06-2011
3.0
Brake cylinders
Details
       

 11-05-2011
1.5
Plates for the steering rod boots
Details
       

 10-31-2011
2.0
Remove test shroud and start front baffel
Details
       

 10-17-2011
3.0
ReDo Parking Brake
Details
       

 10-16-2011
3.0
Mounted parking brake valves
Details
       

 09-10-2011
1.0
Trim leading edge of the air scoop
       

 09-09-2011
0.5
Inside heat muff 4 of 4
Details
       

 09-09-2011
0.5
Inside heat muff 3 of 4
Details
       

 09-09-2011
0.5
Inside heat muff 2 of 4
Details
       

 09-09-2011
0.5
Inside heat muff 1 of 4
Details
       

 09-07-2011
2.0
Make heat muff from galvanized steel
Details
       

 09-06-2011
2.5
Heat muff mock up
Details
       

 09-03-2011
6.0
Air Scoop
Details
       

 09-02-2011
3.0
Air Scoop
Details
       

 09-01-2011
2.0
Air scoop work
Details
       

 08-31-2011
4.0
Carb heat valve for the air scoop
Details
       

 08-30-2011
2.0
Air Scoop for Carb
Details
       

 08-27-2011
1.5
Tune up line on cowl top skins
Details
       

 08-26-2011
2.0
Nose bowl is held by the cowl panels now
Details
     

 08-25-2011
1.5
Lower Side Cowl Panels
Details
       

 08-25-2011
2.5
Lower Cowl Panels
Details
       

 08-24-2011
2.5
Layout and trim rear lower cowl panels
Details
       

 08-24-2011
1.5
Layout and trim front lower cowl panels
Details
       

 08-23-2011
2.5
Make lower cowl panels
Details
       

 08-22-2011
3.0
Tuning up the cowl transistions
Details
       

 08-21-2011
5.0
Added nut plates for the top side cowl skins
Details
       

 08-20-2011
5.0
Side work fueslage and cowl
Details
       

 08-19-2011
2.5
Side upper panels cowl
Details
       

 08-18-2011
1.5
Bubble up Nose Bowl to clear starter
Details
       

 08-18-2011
3.0
Attach hinges to top and bottom cowl panels
       

 08-17-2011
2.0
Parts and cowl hinge work
Details
       

 08-16-2011
1.0
Trim fuselage sides by firewall
       

 08-15-2011
2.0
Trim and fit upper door templates
Details
       

 08-14-2011
4.0
Bracket fab and skin (door) templates
Details
       

 08-13-2011
4.0
Nut plates and dimples for Cowl top and bottom
Details
       

 08-12-2011
3.0
Joggle nose bowl and tune up and structure cowl
Details
       

 08-10-2011
3.0
Prep for putting joggle in the nose bowl
Details
       

 08-09-2011
3.0
Upper center cowl
Details
       

 08-09-2011
3.0
Lower cowl / air intake
Details
       

 08-08-2011
1.0
Align Nose Bowl with Fuselage
Details
       

 08-07-2011
2.0
Trim rear edge of Nose Bowl & make Alt Brkt
Details
       

 08-06-2011
4.0
Cowl and Nose Bowl
Details
       

 08-05-2011
2.0
Finish welding nose bowl
Details
       

 07-14-2011
2.0
Patching and welding nose bowl
Details
       

 07-10-2011
3.5
Tune up front face of lower nose bowl
Details
       

 07-10-2011
1.5
Tack welding and cutting center hole in Nose Bowl
       

 07-08-2011
3.0
Fitting lower nose bowl
Details
       

 07-08-2011
2.0
Fitting lower nose bowl
Details
       

 07-07-2011
5.0
Tack Welding Upper Nose Bowl
Details
       

 07-06-2011
7.0
Upper Nose Bowl
Details
       

 07-05-2011
3.0
Upper Nose Bowl
Details
       

 07-05-2011
2.0
Lower Nose Bowl
Details
       

 07-04-2011
4.0
Lower Nose Bowl
Details
       

 07-02-2011
3.0
Lower Nose Bowl
Details
       

 07-01-2011
3.0
Finished the Battery Box
Details
       

 06-24-2011
1.0
Nosebowl Lower Panel restart
Details
       

 06-24-2011
4.0
Battery box
Details
       

 06-20-2011
0.6
Template lower nosebowl 4 of 4
Details
       

 06-20-2011
0.6
Template lower nosebowl 3 of 4
Details
       

 06-20-2011
0.6
Template lower nosebowl 2 of 4
Details
       

 06-20-2011
0.6
Template lower nosebowl 1 of 4
Details
       

 06-18-2011
1.0
Lower nosebowl templates
Details
       

 06-17-2011
2.0
Templates for the top side of the nosebowl
Details
       

 06-16-2011
2.0
Nosebowl template and fuel line
Details
       

 06-13-2011
2.0
Make a template of nosebowl
Details
       

 06-09-2011
1.0
Destroyed the material by over working it
Details
       

 06-07-2011
1.0
Soften bends in lower nosebowl
Details
       

 06-01-2011
2.0
Focused metal movement to tighten it up to form
Details
       

 05-31-2011
2.0
Little tune up and lots of rest today
Details
       

 05-30-2011
3.5
Almost destroyed the bottom nose bowl
Details
       

 05-29-2011
3.5
Shaping the air inlets
Details
       

 05-28-2011
4.0
Shaping the air inlets
Details
       

 05-21-2011
0.5
Smooth out main center shape and tuck in one side
Details
       

 05-20-2011
0.6
Nosebowl Shot Bag 4 of 4
Details
       

 05-20-2011
0.6
Nosebowl Shot Bag 3 of 4
Details
       

 05-20-2011
0.6
Nosebowl Shot Bag 2 of 4
Details
       

 05-20-2011
0.6
Nosebowl Shot Bag 1 of 4
Details
       

 05-19-2011
1.5
Afternoon nose bowl work
Details
       

 05-19-2011
2.0
4am morning, can't sleep, so get to work...
Details
       

 05-17-2011
0.6
Nose bowl bottom skin 4 of 4
Details
       

 05-17-2011
0.6
Nose bowl bottom skin 3 of 4
Details
       

 05-17-2011
0.6
Nose bowl bottom skin 2 of 4
Details
       

 05-17-2011
0.6
Nose bowl bottom skin 1 of 4
Details
       

 05-15-2011
0.3
Nosebowl Air inlet remake 7 of 7
Details
       

 05-15-2011
1.4
Nosebowl Air inlet remake 6 of 7
Details
       

 05-15-2011
0.3
Nosebowl Air inlet remake 5 of 7
Details
       

 05-15-2011
0.5
Nosebowl Air inlet remake 4 of 7
Details
       

 05-15-2011
0.1
Nosebowl Air inlet remake 3 of 7
Details
       

 05-15-2011
0.1
Nosebowl Air inlet remake 2 of 7
Details
       

 05-15-2011
0.3
Nosebowl Air inlet remake 1 of 7
Details
       

 05-14-2011
0.8
Nosebowl 5 of 5
Details
       

 05-14-2011
0.8
Nosebowl 4 of 5
Details
       

 05-14-2011
0.8
Nosebowl 3 of 5
Details
       

 05-14-2011
0.8
Nosebowl 2 of 5
Details
       

 05-14-2011
0.8
Nosebowl 1 of 5
Details
       

 05-14-2011
1.0
Begin nose bowl fabrication
Details
       

 05-03-2011
2.5
Re-riveted nut plates, Fuel system pressure test
Details
       

 05-02-2011
1.0
Fuel system plumbing 2 of 2
Details
     

 05-02-2011
2.0
Fuel system plumbing 1 of 2
Details
       

 05-01-2011
3.0
Top Skin Fitting
Details
       

 04-30-2011
3.5
Nut plates for removable top skin
Details
       

 04-28-2011
1.0
Drilling holes for nut plate rivets
Details
     

 04-26-2011
2.0
Inventory, tool making, dimpling
Details
       

 04-25-2011
3.0
Fuel system and IP brace
Details
       

 04-22-2011
2.0
Rivet step farings
       

 04-22-2011
3.0
Fitting the side panels behind canopy hinge
Details
       

 04-21-2011
1.0
Test fit top skin
Details
       

 04-20-2011
2.0
Structure planning
Details
       

 04-11-2011
2.0
Step farings (verticle)
Details
       

 04-09-2011
2.0
Step faring bottom
Details
       

 04-08-2011
4.0
Test fit IP with all the stuff in it
Details
       

 04-03-2011
2.0
Step faring
Details
       

 04-03-2011
2.0
Make step tube pilot to connect the step
Details
       

 04-02-2011
2.0
Flap controls
Details
       

 04-01-2011
1.5
Brake pedal riviting and pedal placement
Details
       

 03-31-2011
8.0
Fuel delivery system
Details
       

 03-29-2011
3.5
Brakes and steering link windows
Details
       

 03-28-2011
2.0
Triming seat foam and sending it out for upolstery
Details
       

 03-27-2011
3.0
Seat foam gluing
Details
       

 03-27-2011
3.5
Brake pedals
Details
       

 03-26-2011
3.0
Gluing the seat foam
Details
       

 03-26-2011
3.0
Engine mount, brake pedal hinges
Details
       

 03-24-2011
2.0
Brake pedals, steering rods, & seat cushions
Details
       

 03-23-2011
2.0
Test fit rudder pedals and make two brake pedals
Details
       

 03-22-2011
1.5
Reset main gear with 3/16" red neoprene
Details
       

 03-19-2011
7.0
On its gear finally
Details
       

 03-17-2011
2.0
Landing gear
Details
       

 03-16-2011
3.5
Attaching the steel parts.
Details
       

 03-12-2011
1.5
IP Reinforcement angles
Details
       

 03-11-2011
1.5
IP Cutouts for trim controls
       

 03-09-2011
2.5
More IP work
Details
       

 03-07-2011
2.0
Custom fitting guages
Details
       

 03-06-2011
7.0
Poking Large holes in the IP
Details
       

 03-05-2011
2.0
Top skin firewall to IP
Details
       

 03-05-2011
2.0
remake the Panel Side Angles
Details
       

 03-05-2011
1.0
Paste print to IP
Details
       

 03-05-2011
1.0
Center punch and pilot drill IP face
Details
       

 03-03-2011
1.0
Cut paper IP layout and Top skin
Details
       

 03-01-2011
1.3
Cutting seat foam
Details
       

 02-28-2011
1.0
Cutting seat foam
Details
       

 02-26-2011
2.0
Drill holes in the fork and doubler
Details
       

 02-25-2011
3.0
Nose wheel fork and mount 3 tires
Details
       

 02-24-2011
1.5
Nose wheel fork
Details
       

 02-21-2011
2.0
Forward center console verticle panels
Details
       

 02-20-2011
3.0
Center console screw mounting
Details
       

 02-19-2011
4.0
Reverse some rivets and test bend nose gear
Details
       

 02-19-2011
3.0
Nose gear lower bearing
Details
       

 02-18-2011
4.5
Little bit of fab and a lot of welding
Details
       

 02-17-2011
2.2
Cross drilling Nose Gear down tube
Details
       

 02-16-2011
1.5
Nose gear Bottom plate
Details
       

 02-15-2011
1.0
Nose gear, cut and fit pipe
Details
       

 02-10-2011
4.0
Collect steel parts for media blast and paint
Details
       

 02-09-2011
7.0
Center console
Details
       

 02-08-2011
2.0
Cut and bend 6-K-2 parts for the Center Console
       

 02-07-2011
4.0
IP and firewall fuel pass through fabrication
Details
       

 02-06-2011
2.0
Add a few rivets and plan instrument panel
Details
       

 02-05-2011
3.5
Riviting top skins and seat
       

 02-05-2011
3.0
Longeron Doubler
Details
       

 02-04-2011
1.5
Shaping metal around front hoop
Details
       

 02-03-2011
3.0
Rear forward top skin
Details
       

 02-02-2011
5.0
Forward rear skin
Details
       

 02-01-2011
8.0
Layout and drill upper rear forward skin
Details
       

 01-31-2011
3.0
Positioned forward rear skin
Details
       

 01-30-2011
3.0
Trim and fit fuselage hoops
       

 01-29-2011
3.0
Canopy hoops
Details
       

 01-28-2011
2.0
Bending tube
Details
       

 01-28-2011
2.0
Bending tube
Details
       

 01-27-2011
2.5
Bend tube for fuselage
Details
       

 01-26-2011
2.0
Flap torque arm install 3 of 3
Details
       

 01-26-2011
2.0
Flap torque arm install 2 of
Details
       

 01-26-2011
1.0
Flap torque arm install 1 of
Details
       

 01-25-2011
2.0
Seats and arm rest
Details
       

 01-25-2011
1.5
Cutting holes
       

 01-25-2011
1.4
Arm rest & Flap Torque Tube
Details
       

 01-24-2011
2.8
Center console / arm rest
Details
       

 01-22-2011
1.0
Position front control stick bearing
Details
       

 01-21-2011
2.0
Seat back Chanel & forward torque tube bearing
Details
       

 01-19-2011
3.5
Seat back, center support & doubler
Details
       

 01-19-2011
2.0
Seat back riveted in place
Details
       

 01-19-2011
3.0
Flanging hole back into shape
Details
       

 01-18-2011
4.0
Seat back support and flap motor mount
Details
       

 01-18-2011
3.0
Finish left front seat panel, start seat back supp
Details
       

 01-17-2011
1.8
Right front seat panel rivetd in place
Details
       

 01-13-2011
1.5
Front seat panel / angles
Details
       

 01-12-2011
1.5
Front Seat Panel
Details
       

 01-11-2011
2.0
Clean up and rivet bottom of fuselage
Details
       

 01-10-2011
1.5
Layout trim and rivet last section of side skin
       

 01-09-2011
1.0
Rivet gussets right side start seats
Details
       

 01-08-2011
1.0
Caulk, rivet front side skins and firewall 3 of 3
       

 01-08-2011
2.0
Caulk, rivet front side skins and firewall 2 of 3
Details
       

 01-08-2011
2.0
Caulk, rivet front side skins and firewall 1 of 3
Details
       

 01-07-2011
1.5
Fresh air vents
Details
       

 01-04-2011
2.0
Fresh air vents
Details
       

 01-03-2011
0.5
Finish up forward side skin rivet lines 3 of 3
Details
       

 01-03-2011
1.0
Finish up forward side skin rivet lines 2 of 3
Details
       

 01-03-2011
1.0
Finish up forward side skin rivet lines 1 of 3
Details
       

 01-01-2011
1.0
L-Angles front side skins 2 of 2
Details
       

 01-01-2011
1.0
L-Angles front side skins 1 of 2
Details
       

 12-31-2010
4.0
Fitting forward side skins
Details
       

 12-30-2010
2.0
Begin joining front floor and side skins
Details
       

 12-26-2010
5.0
Set center spar rear wing attachment uprights
Details
       

 12-25-2010
2.0
Reset wing jigs and mark for transfer punch
Details
       

 12-25-2010
1.0
Front outer Seat Belt Attach points
     

 12-24-2010
3.0
Rivet baggage floor in place
Details
       

 12-23-2010
2.0
Rivet parts together
Details
       

 12-23-2010
2.0
Establish rivetline on outer skins
Details
       

 12-23-2010
3.0
Baggage floor
Details
       

 12-22-2010
2.0
Rivet splice upper rear longerons
Details
       

 12-20-2010
2.0
Main cabin floor and baggage floor
Details
       

 12-20-2010
2.0
Baggage floor
Details
       

 12-19-2010
3.0
Main cabin floor
Details
       

 12-11-2010
5.0
Fuselage Center Spar and Baggage Floor
Details
       

 12-10-2010
1.0
Rear baggage floor
Details
       

 12-07-2010
1.0
Enlarge pilot holes to 5/32 and 1/8 side skins
       

 12-05-2010
3.0
Main gear upright supports
Details
       

 12-04-2010
2.5
Main Landing Gear Attachment
Details
       

 12-04-2010
2.5
Main Landing Gear Attachment
Details
       

 12-01-2010
1.0
Main Landing gear
Details
       

 11-30-2010
2.0
Main Landing Gear Attachment
Details
       

 11-29-2010
2.0
Main Landing Gear Attachment
Details
       

 11-27-2010
1.0
Making the rear baggage floor
Details
       

 11-27-2010
4.0
Baggage tray
Details
       

 11-26-2010
2.0
Main gear attachment stud tool
Details
     

 11-25-2010
2.0
Adjust side skins and deburr some update parts

 11-23-2010
3.0
Cut holes in side skins
Details
       

 11-22-2010
1.0
Adjust bend near center spar on floor
Details
       

 11-21-2010
2.0
Trimmed and hung side skins
Details
       

 11-20-2010
2.5
Upper Seat & Baggage Floor Support
Details
       

 11-20-2010
1.5
Set instrument panel and hang side skins
Details
       

 11-19-2010
3.0
More fuselage work
Details
       

 11-19-2010
2.5
Fuselage work
Details
       

 11-17-2010
2.0
Setting rear wing attach points
Details
       

 11-15-2010
6.5
Recheck and reset everything
Details
       

 11-13-2010
2.5
Remove rear frame assembly to relocate it
Details
       

 11-04-2010
3.5
Wing Jigs
Details
       

 11-03-2010
3.5
Move rear fuselage back and start front build up
Details
       

 11-02-2010
4.0
Setting up for fuselage marriage
Details
       

 11-02-2010
1.0
Set rear fuselage
Details
       

 11-02-2010
1.0
Rear fuslage prep work
Details
       

 11-02-2010
1.0
Rear fuselage prep work
Details
       

 11-01-2010
1.0
Putzing around
Details

 10-30-2010
1.1
Rough trim rear top skin
Details
       

 10-29-2010
0.5
Drill and cleco rear top skin 3 of 3
Details
       

 10-29-2010
0.5
Drill and cleco rear top skin 2 of 3
Details
       

 10-29-2010
1.0
Drill and cleco rear top skin 1 of 3
Details
       

 10-28-2010
1.2
Setting top rear skin on fuselage
Details
       

 10-28-2010
1.8
Rear top fuselage skin
Details
       

 10-28-2010
0.5
Clamping rear top skin in place
Details
       

 10-26-2010
2.0
Setup bulkheads on rear fuselage
Details
       

 10-25-2010
3.0
Prepping rear fuselage for assembly
Details
       

 10-24-2010
4.0
Prime mating surfaces on rear fuselage
Details
       

 10-07-2010
2.0
Cutout rear spar clearance in rear side skin
Details
       

 10-06-2010
2.0
Assembled rear sides of fuselage
Details
       

 08-28-2010
3.0
Riveting firewall
Details
       

 08-27-2010
2.0
Firewall riveting
Details
       

 08-27-2010
2.0
Firewall Riveting
Details
       

 04-23-2010
1.5
Finished welding motor mount
Details
     

 10-24-2009
1.5
Cutting sheets for rear top fuselage
Details
       

 10-24-2009
2.5
Canopy parts
Details

 10-15-2009
1.0
Made front Axle Spacers

 09-26-2009
1.0
Make clearance for calipers on the main gear
Details
       

 09-25-2009
0.5
Bolt holes for axel 3 of 3
Details
       

 09-25-2009
2.0
Bolt holes for axel 2 of 3
Details
       

 09-25-2009
2.0
Bolt holes for axel 1 of 3
Details
       

 09-22-2009
2.5
Main Gear
Details
       

 09-19-2009
2.5
Main Gear
Details
       

 09-06-2009
2.5
Grind forms to line and smooth shape
Details
       

 09-04-2009
2.3
Layout and trim forms for canopy tubes
Details
       

 09-02-2009
1.0
Weld canopy hinge / engine mounts
Details
       

 09-01-2009
1.0
Clean up and make lists of needed material
Details
       

 08-28-2009
1.0
Layout, cut, and bend air vents 5 of 5
Details
       

 08-28-2009
1.0
Layout, cut, and bend air vents 4 of 5
Details
       

 08-28-2009
0.1
Layout, cut, and bend air vents 3 of 5
Details
       

 08-27-2009
1.8
Layout, cut, and bend air vents 2 of 5
Details
       

 08-27-2009
1.8
Layout, cut, and bend air vents 1 of 5
Details
       

 08-26-2009
2.0
Gusset and Fairleads
Details
       

 08-25-2009
2.0
Flap motor & fairleads
Details
       

 08-24-2009
1.5
Small B Details
Details
       

 08-23-2009
2.0
Small B details
Details
       

 08-23-2009
1.5
Making small B details, sheet 18
Details
       

 08-22-2009
1.0
Layout, cut, drill, deburr
       

 08-21-2009
2.0
Making more B details
Details
       

 08-20-2009
2.0
Cleaned up bench and made some parts
Details
       

 08-17-2009
2.0
Discovered I didn't have long enough .040 left
Details
       

 08-16-2009
2.0
Started on 6b16 details
Details
       

 08-16-2009
1.8
Make tool for setting rivets
Details
       

 08-13-2009
1.5
Prep corners for NutPlates MS21075L3
Details
       

 08-11-2009
0.7
Dimple and rivet frame around access hole
       

 08-08-2009
1.0
Trim and bend 6b-15-2
Details
       

 08-08-2009
3.0
Made left and right parts of 6B15-4
Details
       

 08-08-2009
2.0
Getting all the 6B15 details made
Details
       

 08-06-2009
1.0
Small parts fabrication 6b-12,14,& 15
Details
       

 08-05-2009
1.5
Scrap built layout
Details
       

 08-05-2009
1.0
Bend the other two parts
       

 08-04-2009
2.0
Modify form 10 degrees, bend 85 part 3
Details
       

 07-08-2009
0.2
bending flange on hardwood 6 of 6
Details
       

 07-08-2009
0.2
bending flange on hardwood 5 of 6
Details
       

 07-08-2009
0.2
bending flange on hardwood 4 of 6
Details
       

 07-08-2009
0.2
bending flange on hardwood 3 of 6
Details
       

 07-08-2009
0.2
bending flange on hardwood 2 of 6
Details
       

 07-08-2009
0.2
bending flange on hardwood 1 of 6
Details
       

 06-25-2009
2.5
Fitting rudder bearing and spar jig
Details
       

 06-21-2009
2.5
Landing Gear and extra parts
Details
       

 06-21-2009
1.0
Disassemble canopy frame, test fit rudder pedals
Details
       

 06-20-2009
2.0
Made shutter slides for steering rods
Details
       

 06-20-2009
1.4
Drilled center spar rivet line to size
       

 06-19-2009
3.5
Deburred side skins, mounted center spar
Details
       

 06-18-2009
1.0
Cut side skins for cabin
Details

 06-17-2009
3.5
Bend other upper longeron
Details
       

 06-14-2009
2.0
Start 6B11-1 template
Details
       

 06-14-2009
1.5
Bend upper forward longerons
Details
       

 06-13-2009
2.0
Weld and finish lower engine mount bracket
Details
       

 06-13-2009
2.0
Fit lower engine mount and drill holes
Details
       

 06-11-2009
1.2
Cabin Floor 3 of 3
Details
       

 06-11-2009
1.2
Cabin Floor 2 of 3
Details
       

 06-11-2009
1.2
Cabin Floor 1 of 3
Details
       

 06-10-2009
1.0
Drill cabin floor to rivet size
       

 06-09-2009
4.5
Layout and pilot drill Cabin Floor
Details
       

 06-08-2009
4.0
Layout rivet holes on Cabin Floor
Details
       

 06-07-2009
3.0
Layout cabin floor
Details
       

 06-05-2009
1.0
Front Floor Skin
Details

 05-26-2009
2.0
Brake Cylinder Supports
Details

 05-23-2009
1.0
Cut 3/4 x 3/4 x 1/8 angle
Details
       

 05-21-2009
2.5
Brake Cylinder Supports
Details
       

 05-19-2009
2.0
Toe Brake Pedal and Lateral Pedal Bearing
Details
       

 05-18-2009
1.0
Cut and fabricate Heel Support
Details
       

 05-11-2009
2.0
Central Pedal Bearing mfg
Details
       

 05-01-2009
1.5
Lower LG Bearing
Details
       

 05-01-2009
0.7
Lower LG Bearing
Details
       

 04-30-2009
1.0
Lower LG Bearing
Details
       

 04-30-2009
1.0
Lower LG Bearing
Details
       

 04-14-2009
2.0
Finish Upper Gear Bearing & Start Lower
Details
       

 04-13-2009
2.5
Fabricate Upper Bearing for Nose Gear
Details
       

 02-08-2009
0.5
Disassemble firewall for storage
Details
     

 02-07-2009
2.0
Layout and cut Lower Engine Mount Fitting
Details
       

 02-07-2009
1.0
Holes and bend Lower Engine Mount Fitting
Details
       

 02-07-2009
0.5
Bend Upper Engine Mount & Canopy Hinge 3 of 3
Details
       

 02-07-2009
0.5
Bend Upper Engine Mount & Canopy Hinge 2 of 3
Details
       

 02-07-2009
0.5
Bend Upper Engine Mount & Canopy Hinge 1 of 3
Details
       

 02-05-2009
1.0
Trim brackets
Details
       

 02-04-2009
1.5
Upper Engine Mount & Canopy Hinge
Details
       

 02-02-2009
1.0
Upper Engine Mount & Canopy Hinge
Details
       

 02-01-2009
2.0
Layout and locate 6b8-11 & 6b8-10
Details
       

 01-31-2009
8.0
Center Firewall Stiffener and Gear Gusset
Details
       

 01-30-2009
1.0
Remade 6b8-7 for better fit
Details
       

 01-28-2009
3.0
Layout and cut 6b8-3, 1, & 7. Bent 1 & 7
Details
       

 01-27-2009
2.0
Cut material for 6b13-1
Details
     

 01-26-2009
2.0
Layout and make 6b8-2
Details
       

 01-25-2009
2.0
Cut two strips of .062 for 6b8-10 & 11
Details
       

 01-25-2009
2.0
Cut and made 6b8-9
Details
       

 01-24-2009
1.0
Attached 6b7-3's to 6b7-1
Details
     

 01-22-2009
4.0
Trimmed ends of 6b6-3,6b7-1 & 2, and L-angles.
Details
       

 01-22-2009
2.0
Layout and drill all rivets holes in main firewal
Details
       

 01-21-2009
2.2
Layout and silver cleco firewall, 6b7-1 and 6b6-1
Details
       

 01-20-2009
2.5
Cut and made 6b6-1, 6b6-3, 6b7-2, and 6b7-3
Details
       

 01-20-2009
2.5
Cleaned up table and worked 6b7-1
Details
       

 01-19-2009
1.0
Straightened flange on 6B7-1
Details
       

 01-16-2009
1.2
Qualify flange of Firewall
Details
       

 01-16-2009
3.0
Firewall Top Stiffener (front)
Details
       

 01-15-2009
0.6
Trim Firewall 6b6-2
Details
       

 01-15-2009
0.2
Ready firewall form for hammering
Details
       

 01-15-2009
1.1
Form firewall
Details
       

 01-14-2009
3.0
Making more bulkheads
Details
       

 01-14-2009
2.5
Making 6b12-2 Baggage Back Bulkhead
Details
       

 01-13-2009
0.3
Tune up part to specs 6b12-3
Details
       

 01-13-2009
0.5
Test forms, make 6b12-3 from scrap piece 3 of 3
Details
       

 01-13-2009
1.0
Test forms, make 6b12-3 from scrap piece 2 of 3
Details
       

 01-13-2009
1.0
Test forms, make 6b12-3 from scrap piece 1 of 3
Details
       

 01-13-2009
0.9
Form Middle Bulkhead
Details
       

 01-12-2009
1.0
Rear Frame Assembly Storage
Details
       

 01-12-2009
1.5
Mark crimp locations in all bulkhead forms 2 of 2
Details
       

 01-12-2009
1.5
Mark crimp locations in all bulkhead forms 1 of 2
Details
       

 01-10-2009
4.0
Rear Frame Assembly trial fit
Details
       

 01-10-2009
4.0
Final fit of Rear Frame Channel
Details
       

 01-09-2009
1.0
Make template, make and fit 6-b-5-4
Details
       

 01-09-2009
1.0
Cut and flange 115mm hole
Details
       

 01-08-2009
1.0
Scrap built the uprights
Details
       

 01-08-2009
1.0
Bend and qualify Parts 6-b-5-1, 6-b-5-3, and 6-b-5
Details
       

 01-07-2009
1.5
Deburr and layout 3 parts
Details
     

 01-06-2009
1.0
Repair elongated hole
Details

 01-05-2009
2.0
Lower left rear longeron repair
Details
       

 01-04-2009
2.0
Take rear fueslage apart for deburring
Details
       

 01-03-2009
1.0
Cable outlet farings 2 of 2
Details
       

 01-03-2009
1.5
Cable outlet farings 1 of 2
Details
       

 01-02-2009
1.0
Attach 6-b-3-6 and L-angles 3 of 3
Details
       

 01-02-2009
2.0
Attach 6-b-3-6 and L-angles 2 of 3
Details
       

 01-02-2009
2.0
Attach 6-b-3-6 and L-angles 1 of 3
Details
       

 01-01-2009
1.0
Drill and cleco left rear fuselage side
Details
       

 12-31-2008
2.0
Tool for cable farings 2 of 2
Details
       

 12-31-2008
2.0
Tool for cable farings 1 of 2
Details
       

 12-31-2008
1.0
Drill right bottom side skin to lower longeron
Details
       

 12-30-2008
1.0
Set rear sides on fuselage bottom
Details
       

 12-30-2008
4.0
Get sides ready to hang on floor
Details
       

 12-30-2008
1.0
Clecoed H.T. frames & brackets
Details
       

 12-30-2008
1.0
Adjust rear side skins down in front
Details
       

 12-29-2008
1.2
Position and pilot drill upper longerons
Details
       

 12-29-2008
2.0
Dimpled skins and longerons, cut L-angles
Details
       

 12-29-2008
1.0
Attached L-Angles to rear sides
Details
       

 12-28-2008
2.0
Layout longeron rivet lines on side skins
Details
       

 12-26-2008
1.0
Upper & lower rudder bushings for rudder
Details
       

 12-26-2008
3.5
Rear side skin layout
Details
       

 12-24-2008
3.0
Fit and rivet rear floor bottom
Details
       

 12-23-2008
2.0
Prime and assemble bottom
Details
       

 12-22-2008
5.0
deburred and fabricated some parts
Details
       

 12-21-2008
4.0
Prep bottom for primer
Details
       

 12-19-2008
2.0
Fitting access door
Details
       

 12-19-2008
2.0
Fitting access door
Details
       

 12-17-2008
0.8
Trim & joggle cross pieces, begin clamping
Details
       

 12-17-2008
1.0
Rear longerons
Details
       

 12-17-2008
0.5
Crease access door
Details
       

 12-17-2008
1.0
Clamp lonerons to bottom skin
Details
       

 12-17-2008
0.5
Attach hinge to access door
Details
       

 12-17-2008
1.5
Access door screw holes
Details
     

 12-16-2008
0.5
Qualify 6-b-2-1 angles

 12-14-2008
3.5
Cut material for rear longerons & sides
Details
       

 12-14-2008
0.5
Bend rear longerons
Details
       

 12-13-2008
1.0
Rivet nut plates to access door frame
Details
       

 12-13-2008
1.0
Make screw holes and layout and drill hinge
       

 12-13-2008
1.0
Drill, drill, drill frame work
Details
       

 12-11-2008
2.0
Make tool for nut plate rivet spacing
Details
       

 12-10-2008
2.0
6-b-3-6 and nut plate layout for access door
Details
       

 12-08-2008
2.7
Layout bottom access hole in floor
Details
       

 12-07-2008
1.0
Smooth out flange on the Z-Angles
Details
       

 12-07-2008
1.0
Layout rivet holes in 6-b-2-3
Details
       

 12-07-2008
1.0
Joggle Forward angles for fit over longerons
Details
       

 12-07-2008
1.0
Form Bottom Longerons
Details
       

 12-07-2008
1.0
Cleco longerons and Z-angles
Details
       

 12-06-2008
1.0
Trimmed ends of L & Z Angles
Details
       

 12-06-2008
0.1
Flange hole in 6-b-1-1
Details
     

 12-06-2008
1.0
Add L angles and other Z angles to bottom skin
Details
       

 12-03-2008
3.0
Layout rivet lines on bottom skin
Details
       

 12-01-2008
1.5
Re-layout bottom skin and trim
Details
       

 12-01-2008
0.5
Layout, cut, cleco and attach fairlead
       

 11-30-2008
1.0
Form Z angle short flange
Details
       

 11-30-2008
1.5
Details 8 & 9
Details
       

 11-30-2008
2.5
Cut and form Z angles
       

 11-30-2008
1.0
Bottom skin layout
Details
       

 11-29-2008
2.0
Trimmed and formed details 1 and 2
Details
       

 11-29-2008
1.5
Formed 5, 6, & 7 details
Details
       

 11-29-2008
0.5
Deburr parts
Details
       

 11-27-2008
1.0
Pull out cut metal and survey what's next
Details
       











Copyright © 2001-2013 Matronics. All Rights Reserved.