Powered By Kitlog Pro v2.0
Ron Lendon's Aircraft Mfg.
Zodiac CH 601 XL
Fuselage
12-19-2008
< Previous Log Entry
Next Log Entry >
Date:
12-19-2008
Number of Hours:
2.00
Manual Reference:
6-b-3-8
Brief Description:
Fitting access door
To get things to lay down flat I plan to use flush rivets. Here I test the concept by placing 5 tack rivets and installing all the screws.
Both frame and skin get dimpled separately then tack riveted in place.
All screws are installed and the ones that won't thread are reamed out with a .220 reamer.
All screws are tightened.
Dimple skin and frame piece
.220" reamer
Tighten screws
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
CZAW CH601XL Home
Light Sport Recumbent Bike Home
Zodiac CH 601 XL Home
Category
# Logs
# Hours
All
1605
3634
Avionics
19
36
Electrical
22
49
Empennage
91
225
Engine
181
358
Facilities
57
177
Flight Testing
12
17
Fuselage
533
1137
Maintenance
8
9
Miscellaneous
35
-74
None
6
196
Nose Gear
7
10
Planning
21
47
Shop Supplies
6
22
Tools
85
185
Wings
457
1054
ZU601XLB
65
186
Copyright © 2001-2024 Matronics. All Rights Reserved.