KitLog pro

Powered By Kitlog Pro v2.0

Ron Lendon's Aircraft Mfg.
' style=
Date:  11-12-2011
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Carb heat cable placement

Modified a 1/4-28 bolt to clamp the cable end and act as a pivot point on the lever. Using jam nuts to hold the cable at the through hole in the bolt.

The test worked so it's only going to take one adel clamp and a couple layers of shrink tube to hold the cable in place.
' style=

test idea

test idea

' style=

Closed

Closed

' style=

Clamped

Clamped

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.