KitLog pro

Powered By Kitlog Pro v2.0

Ron Lendon's Aircraft Mfg.
174 Logs Found 
 Date
Hours
Work Log Summary

Details

 01-13-2013
1.0
Spot face upper head bolt bosses
Details

 01-13-2013
4.0
Installed the Falcon heads and adjusted the valves
Details
       

 01-12-2013
4.0
Assemble rods to crank
Details
       

 01-11-2013
2.0
Assemble rods and new 2850 pistons
Details
       

 12-02-2012
4.0
Tear down engine top end
Details
       

 11-29-2012
1.0
Check Cylinder piston clearance
Details
       

 11-28-2012
1.0
Remove pistons from rods, check piston size
Details
       

 09-16-2012
1.0
Made a clay squash heads
Details
       

 04-07-2012
2.0
Caulking gaps on baffle
Details
       

 04-04-2012
1.0
Cooling baffle on left front
Details
       

 03-24-2012
3.0
Front Center Baffel
Details
       

 03-23-2012
2.0
Front Center Baffel
Details
       

 03-22-2012
1.0
Front center Baffel
Details
       

 03-22-2012
1.0
Front Center Baffel
Details
       

 03-19-2012
1.0
Front Center Baffel
Details
       

 03-18-2012
4.0
Left front Baffel
Details
       

 03-14-2012
1.0
Engine torsional test and static run
Details

 03-12-2012
2.5
Cooling baffel seals
Details
       

 01-13-2012
1.0
Changed out EGT sensors with new ones

 01-07-2012
1.0
Engine idle test
Details

 01-03-2012
3.0
Carb re-assemble and mount
Details
       

 12-28-2011
2.0
Carb Idle investigation
Details
     

 11-19-2011
3.0
Alternator Bracket trim
Details
       

 11-04-2011
3.0
Throttle ends and Steering rod boots
Details
       

 11-02-2011
3.0
Throttle cables and steel lock nuts
Details
       

 11-01-2011
3.0
Throttle Cables
Details
       

 10-30-2011
1.0
Flottorp Test 2
Details
     

 10-29-2011
1.0
First test Flottorp 1
Details

 10-28-2011
4.0
Replace cylinder head
Details
       

 10-26-2011
1.0
Right head
Details
       

 10-26-2011
1.5
Get ready for next run
Details
       

 10-25-2011
2.0
Marked Dip Stick & added Mixture cable
Details

 10-23-2011
1.0
Cleaning things up on the engine
Details
       

 10-14-2011
3.0
Set upthe Warp Drive prop
Details
       

 10-09-2011
2.0
Tack Pickup mounting
Details
       

 10-07-2011
3.0
Air/Oil Separator plumbing
Details
       

 10-04-2011
3.0
Alternator Bracket
Details
       

 10-01-2011
2.0
Heat muff modification and plug wire spacer
Details
       

 10-01-2011
1.0
Engine Dress, Oil Cooler lines
Details
       

 09-30-2011
2.0
Engine Dress, Oil System
Details
       

 09-29-2011
2.0
Engine Dress, Oil System
Details
       

 09-27-2011
2.0
Engine Dress, Ignition system
Details
       

 09-24-2011
2.0
Engine Dress, Ignition system
Details
       

 09-23-2011
2.0
Made brace for plug wire loom, dist ends
Details
       

 09-22-2011
1.5
Make brackets to hold plug wires
Details
       

 09-20-2011
2.0
Patch air leak in left rear heat shield
Details
       

 09-20-2011
1.5
Engine dress
Details
       

 09-18-2011
1.0
Upper engine baffel
Details
       

 09-18-2011
2.0
Make wire loom and through hole in baffel
       

 09-17-2011
3.0
Baffel oil cooler
Details
       

 09-16-2011
2.5
Baffel and Oil Cooler work
Details
       

 09-15-2011
2.0
Baffel work
Details
       

 09-14-2011
1.5
Baffel work
Details
       

 09-14-2011
1.5
Baffel work
Details
       

 09-13-2011
2.0
Rear Baffel work
Details
       

 09-11-2011
4.0
Fifth bearing oil supply line
Details
       

 09-10-2011
3.0
Ignition system
Details
       

 09-09-2011
1.0
Fabricate repair for heat shield, left rear
Details
       

 09-08-2011
2.0
Carb heat box
Details
       

 08-28-2011
1.5
Rivet intake flange for carb inlet
Details
       

 08-27-2011
2.0
Fabricate air inlet for carb.
Details
       

 06-19-2011
2.0
Prop crush plate
Details
       

 05-12-2011
3.0
Welding the exhaust
Details
       

 05-12-2011
1.0
Heat muff for carb and cabin heat
Details
       

 05-10-2011
1.6
Turn left exhaust towards the rear
Details
       

 05-08-2011
1.3
Fabricate exhaust right and left side 2 of 2
Details
       

 05-08-2011
1.3
Fabricate exhaust right and left side 1 of 2
Details
       

 05-07-2011
0.9
Fabricate right exhaust pipe & heat muff 4 of 4
Details
       

 05-07-2011
0.9
Fabricate right exhaust pipe & heat muff 3 of 4
Details
       

 05-07-2011
0.9
Fabricate right exhaust pipe & heat muff 2 of 4
Details
       

 05-07-2011
0.9
Fabricate right exhaust pipe & heat muff 1 of 4
Details
       

 05-04-2011
1.5
Replace my distributor with WW E/P unit
Details
       

 04-06-2011
2.0
Make up fuel line and connect pumps to carb
Details
       

 04-04-2011
1.0
Carb parts arrived
Details
       

 02-23-2011
0.8
Starter support bracket 2 of 2
Details
       

 02-23-2011
0.8
Starter support bracket 1 of 2
Details
       

 02-22-2011
2.0
Starter bracket and dip stick
Details
       

 02-12-2011
5.0
Alternator bracket redesign for Kubota
Details
       

 02-11-2011
6.0
Alternator bracket fabrication
Details
       

 09-27-2010
0.5
Fitting exhaust manifolds
Details
       

 09-26-2010
2.0
Rework exhaust manifolds
Details
       

 09-26-2010
2.0
Make tools and rework exhaust manifolds
Details
       

 09-25-2010
5.0
Make fixture for exhaust manifold
Details
       

 09-22-2010
1.5
Purge weld exhaust manifold
Details
       

 09-21-2010
2.0
Tack exhaust manifold tube to stubs
Details
       

 09-20-2010
1.3
Shape exhaust manifold end
Details
       

 09-20-2010
1.3
Rough cut holes
Details
       

 09-18-2010
1.0
Fabricate exhaust
Details
       

 09-18-2010
1.0
Fabricate exhaust
Details
       

 09-18-2010
1.0
Check inside of intake
Details

 09-17-2010
5.0
Intake weld clean up
Details
       

 09-10-2010
1.0
Weld intake system
Details
       

 09-10-2010
1.5
Adjust / Fit intake after welding
Details
       

 09-08-2010
1.0
Tack weld intake on the engine
Details
       

 09-04-2010
2.3
Intake Fabrication
Details
       

 09-04-2010
1.3
Intake Fabrication
Details
       

 09-04-2010
1.0
Intake Fabrication
Details
       

 09-03-2010
2.0
Intake Fabrication
Details
       

 09-03-2010
2.5
Intake Fabrication
Details
       

 09-03-2010
1.0
Intake Fabrication
Details
       

 08-31-2010
2.0
Intake fabrication
Details
       

 08-30-2010
2.5
Begin fab of intake system
Details
       

 08-18-2010
1.5
Rebuilding MA3PA 10-2948
Details
       

 08-17-2010
2.5
Rebuilding MA3PA 10-2948
Details
       

 08-14-2010
3.5
Rebuilding MA3PA 10-2948
Details
       

 05-01-2010
4.0
Welded and cut hole in intake transition
       

 04-30-2010
6.5
Fab carb mounting plate
Details
       

 04-24-2010
2.0
Remove stuck parts from Carb
Details
       

 03-24-2010
2.0
Unpacked Van and stored engine
Details
       

 03-20-2010
3.0
Getting engine running at CC17
Details
       

 03-19-2010
16.0
At CC 17
Details
       

 03-13-2010
3.0
Getting ready for CC #17
Details
       

 03-12-2010
4.0
Paint engine parts, wire distributor, safety shaft
Details
       

 03-12-2010
2.5
Make cardboard paint spray booth
Details
       

 03-11-2010
1.0
Sand blast parts for paint
Details
       

 03-10-2010
1.0
Right vavle cover
Details
       

 03-10-2010
1.5
Right Valve Cover mods, oil fill
Details
       

 03-10-2010
1.0
Left Valve Cover
Details
       

 03-04-2010
1.5
Threading Safety Shaft
Details
     

 03-03-2010
2.5
Safety Shaft
Details
       

 03-02-2010
2.0
Safety Shaft for Roy's 5th bearing
Details
       

 02-28-2010
3.0
Cleaning up parts for CC 17
Details
       

 01-05-2010
1.5
Make tool to remove float seat
Details
       

 01-01-2010
1.5
Set advance curve on distributor machine
Details
       

 12-28-2009
1.0
Prep for distributor machine setup
Details
       

 11-30-2009
1.0
Modify rotor plate
Details
       

 11-27-2009
1.0
Make template for weight movement in Distributor
Details
       

 11-27-2009
1.0
Fine tuning distributor bushings
Details

 11-27-2009
1.0
Cleaning up pieces of carb
Details
       

 11-27-2009
0.5
Check advance degrees
Details
       

 11-25-2009
1.0
Finish stripping down carb
Details
       

 11-23-2009
1.0
Tear down Carb
Details
       

 11-23-2009
0.5
Face off bottom bushing on Distributor
Details
     

 11-22-2009
0.2
Went to Roys to Hone the ID of Distributor
Details

 11-20-2009
1.0
Finish bore Distributor ID
Details

 11-17-2009
1.0
Finish ID Boring
Details
       

 11-17-2009
1.0
Drilled out center and bored ID of bushings
Details
       

 11-17-2009
0.1
Distributor ID
Details

 11-17-2009
1.0
Bore lower base for bushing
Details
       

 11-16-2009
2.0
Turn down shaft to add bushing for rotor cam
Details
       

 11-16-2009
2.0
Setup face plate to machine the ID's of Dist Base
Details
       

 11-16-2009
2.0
Make shaft to press out bushing from distributor
Details
       

 11-16-2009
2.0
Finish size bushing OD and press in place
Details
       

 11-15-2009
2.0
Re-work Points plate for proper orentation
Details
       

 11-13-2009
1.0
Machine OD of bushings
Details
       

 11-13-2009
1.5
Machine bushing material to near size
Details
       

 11-05-2009
0.1
Picked up a Marvel Schleber carb
Details
       

 10-27-2009
3.0
Setup and machine holes in points plate
Details
       

 10-26-2009
2.5
Working on distributor point plate
Details
       

 10-24-2009
0.5
Might have core for D&G rebuild
Details

 10-23-2009
1.0
Buy material for Intake system
Details
       

 10-21-2009
1.5
Layout New Points Plate for Dual Points
Details
       

 10-18-2009
1.0
Tear down Distributor
Details
       

 10-11-2009
3.0
Material list & Engine Mount
Details
       

 08-31-2007
1.0
Clean threads on Crank Safety Shaft
Details
       

 05-20-2007
3.0
Designing Flat Blank for Oil Pan
Details
       

 05-09-2007
1.0
Designing flat blank for the oil pan
Details
       

 05-02-2007
1.0
Develop blank for the oil pan
Details

 01-11-2007
1.0
Check Diameters and prep for storage
Details
       

 01-09-2007
1.0
Picked up the crankshaft from Moldex
Details
       

 01-09-2007
0.1
Picked up the crankshaft from Moldex
Details
       

 01-09-2007
0.1
Picked up the crankshaft from Moldex
     

 11-11-2006
2.0
Tear Down Core 2
Details
       

 11-08-2006
4.0
Tear down Core #2
Details
       

 11-07-2006
2.0
Tear down Core #2
Details
       

 10-02-2006
3.5
Corvair core 2
Details
       

 07-21-2006
3.0
Safety Shaft
Details
       

 07-19-2006
3.0
Tried to make a safety Shaft
Details

 07-05-2006
5.0
Corvair core 1 tear down
Details
       

 07-03-2006
3.0
Corvair core 1 tear down
Details
       

 06-30-2006
2.0
Corvair core 1 tear down
Details
       

 06-29-2006
2.5
Corvair core 1 tear down
Details
     

 06-28-2006
3.5
Corvair core 1
Details
       

 06-27-2006
3.5
Pickup Corvair Core 1
Details
       











Copyright © 2001-2013 Matronics. All Rights Reserved.