KitLog pro

Powered By Kitlog Pro v2.0

Ron Lendon's Aircraft Mfg.
91 Logs Found 
 Date
Hours
Work Log Summary

Details

 05-28-2012
2.5
Final entry of the build process, in maintenance m
Details
       

 05-24-2012
1.5
Rivet horzontal stabilizer tips
Details
       

 05-08-2012
2.5
Reset upper hinge
Details
       

 05-07-2012
0.6
Re-make upper rudder hinge
Details
     

 05-07-2012
3.0
Prepare upper rudder hinge placement
Details
       

 05-01-2012
3.0
Stabilizer and rudder
Details
       

 04-23-2012
1.0
Rudder attach and Numbers
Details
       

 04-23-2012
3.0
First work session at hangar
Details
       

 04-23-2012
0.5
Adding the tail numbers
Details
       

 03-04-2012
3.0
Wire the trim tab on the elevator
Details
       

 06-03-2006
2.0
Rivet Elevator Trim Tab
Details
       

 06-02-2006
1.0
Prime mating surfaces of Trim Tab/Elevator
Details
     

 05-31-2006
2.0
EAA Inspection Stabilizer/Elevator
Details
     

 05-30-2006
1.5
Elevator Trim Tab
Details
       

 05-25-2006
2.0
Elevator Trim Tab
Details
     

 05-23-2006
4.0
6T6 Trim tab Assembly
Details
       

 05-22-2006
4.0
Elevator Trim Tab
Details
       

 05-20-2006
1.5
Final trim for ressesed Elevator Trim Tab
Details
       

 05-19-2006
1.0
Cutout Elevator for Trim Tab
Details
       

 05-18-2006
3.0
Resessed Elevator Trim Tab
Details
       

 05-17-2006
3.0
Remake Elevator trim tab
Details
       

 05-15-2006
2.0
Finished bottom side of Elevator
Details
     

 05-14-2006
5.0
Prime Elevator, Rivet Elevator
Details
       

 05-13-2006
2.0
Deburring elevator, prep for primer
Details
     

 05-12-2006
3.0
Elevator hinge to Stabilizer
Details
       

 05-10-2006
1.0
Elevator rivet holes
Details

 05-09-2006
3.0
Trim Rudder clearance in Elevator
Details

 05-08-2006
3.0
Elevator Horns & Cutout for Rudder
Details
       

 05-04-2006
2.0
Cut triangular holes in elevator
Details
       

 05-03-2006
4.0
Drill and Cleco Elevator skin
Details
       

 05-02-2006
5.0
Layed out Elevator and pilot drilled skin.
Details
       

 05-01-2006
2.0
Form elevator skin and trim tab
Details

 04-29-2006
3.0
Cutting metal for Elevator Skin
Details
       

 04-25-2006
3.0
Elevator
Details
       

 04-23-2006
2.0
Elevator Construction
Details
     

 03-27-2006
1.0
Hang Stabilizer from ceiling
Details
       

 03-26-2006
3.0
Close up Stabilizer Top
Details
       

 03-25-2006
5.0
Ready to deburr and Prep for primer
Details
       

 03-24-2006
2.5
Drill & Cleco Top Stabilizer Skin
Details
       

 03-23-2006
3.0
Top Stabilizer skin
Details
       

 03-22-2006
2.0
Rivet bottom of Stabilizer, Layout top
Details
     

 03-22-2006
2.0
Layout Top Stabilizer Skin
Details
       

 03-21-2006
2.0
Deburr Stabilizer and Skeleton, Prime bottom
Details
       

 03-20-2006
5.0
Fitting Stabilizer Skin
Details
       

 03-19-2006
1.0
Forming Stabilizer Skin step 4
Details
       

 03-19-2006
1.0
Forming Stabilizer Skin step 3
Details
       

 03-19-2006
1.0
Forming Stabilizer Skin step 2
Details
       

 03-19-2006
1.0
Forming Stabilizer Skin step 1
Details
       

 03-19-2006
1.0
Fitting Stabilizer Skin
Details
       

 03-17-2006
2.0
Rear Stabilizer Spar
Details

 03-16-2006
3.0
Front & Rear Stabilizer riveting
Details
       

 03-15-2006
2.0
Front & Rear Stabilizer assembly
Details
       

 03-14-2006
2.0
Front & Rear Stabilizer assembly
Details

 03-13-2006
4.0
Front & Rear Stabilizer priming
Details

 03-09-2006
4.0
Front & Rear Stabilizer assembly
Details
       

 03-08-2006
3.0
Front & Rear Stabilizer Spars
Details

 03-06-2006
2.0
Front & Rear Stabilizer Spars
Details

 03-06-2006
3.0
Front & Rear Stabilizer Spars
Details

 02-25-2006
2.0
Front & Rear Stabilizer Spars
Details

 02-24-2006
2.0
Front & Rear Stabilizer Spars
Details

 02-23-2006
3.0
Stabilizer Front Spar & Doublers
Details

 02-22-2006
5.0
Cutting .040 sheet
Details
     

 02-14-2006
3.0
Made the .040 stabilizer doublers
Details

 02-13-2006
3.0
Filed edges flat
Details
       

 02-13-2006
1.0
Cut blanks from flat stock for Stabilizer Spars
Details

 02-13-2006
1.0
Clean up Rudder and Hang from Ceiling
Details
       

 02-09-2006
2.0
Trim Rudder Nose and Prime Rudder
Details
       

 02-08-2006
2.0
Remove Marine Zinc Chromate
Details
       

 02-07-2006
3.0
Fitting Rudder Nose
Details

 02-06-2006
2.0
Rivet Rudder frame together
Details
     

 02-04-2006
2.0
Forming Rudder Nose
Details
       

 02-04-2006
3.0
Deburr Skin and ribs clean up and prime rudder
Details
       

 02-03-2006
3.0
Rivet rudder together

 02-01-2006
2.0
Final trim of lower edge of Rudder skin
Details

 01-29-2006
1.0
Layout trim and rivet lines on the Rudder Skin
     

 01-29-2006
0.5
Form Skin for rudder trailing edge
Details
       

 01-29-2006
2.0
Fitting Skin to Rudder Skeleton
Details
       

 01-29-2006
3.5
Deburr Rudder Skeleton, Trim Skin from Sheet.
Details
       

 01-28-2006
3.0
Rudder Skeleton ready to deburr holes
Details

 01-28-2006
2.0
Building Rudder Skelton
Details

 01-25-2006
2.0
Begin assembly of Rudder Skeleton
Details
     

 01-24-2006
3.0
Bend, Trim, Holes, Deburr
Details

 01-24-2006
3.0
6T4-5, 6T4-3
Details

 01-23-2006
2.0
Sheared and formed Tail section parts
Details

 01-22-2006
1.5
Trimmed rest of 2nd sheet.
Details

 01-22-2006
3.0
Layout the rest of the 2nd sheet
Details

 01-22-2006
1.5
Formed Rudder tip and leading edge ribs.

 01-21-2006
2.0
Finished 6T1-1, EAA Tech Counselor visit
Details

 01-20-2006
2.0
Cut .025 sheet today
Details

 01-17-2006
4.0
Corrected missread of Print for Form 6T1-1 & 2
Details

 01-15-2006
5.5
Layout and Cut first sheet of .016
Details
       











Copyright © 2001-2013 Matronics. All Rights Reserved.