KitLog pro

Powered By Kitlog Pro v2.0

Ron Lendon's Aircraft Mfg.
' style=
Date:  2-25-2006
Number of Hours:  2.00
Manual Reference:  6T-1A & 1B
Brief Description:  Front & Rear Stabilizer Spars

Drilled #30 through while fitting the doublers to the spars. Have them held with clecos and finished drilling half the holes to #20. I didn't have the large clecos with me so I will drill the other half later.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.