KitLog pro

Powered By Kitlog Pro v2.0

Ron Lendon's Aircraft Mfg.
57 Logs Found 
 Date
Hours
Work Log Summary

Details

 05-10-2012
2.0
Shop repairs
Details
       

 05-06-2012
2.5
Clean up and re-arrange hangar
Details
       

 05-05-2012
6.0
Moved bench and tool table to hangar
Details
       

 12-03-2011
2.0
Unpacking and building wire spool rack
Details
     

 05-16-2011
2.0
Move english wheel from basement to Garangar
Details
       

 03-20-2011
2.5
Rearrange the garangar
Details
       

 12-15-2009
1.3
Make table to do the upgrade on
Details
       

 05-16-2009
1.0
Store Rear Fueslage
Details
       

 07-11-2008
3.0
Make Rack to hold welding wire
Details
       

 06-28-2008
1.0
Clean up garage
Details
       

 06-28-2008
1.0
Clean up and load the bins I got at SnF 2008
Details
       

 02-25-2008
1.0
Hung storage racks on door
Details
       

 12-31-2007
1.5
Foot Platform for Machining
Details
       

 11-11-2007
6.0
Clean and oil Smithy
Details
     

 11-10-2007
2.0
Final leveling of the Smithy Granite 1324
Details
       

 11-10-2007
1.5
Drawers for the Smithy bench
Details
       

 11-10-2007
3.0
Clean and oil Smithy
Details
       

 11-09-2007
2.0
Face leg shims for Smithy Granite 1324
Details

 11-08-2007
1.0
Setup Smithy Granite 4 of 4
Details
 

 11-08-2007
1.0
Setup Smithy Granite 3 of 4
Details
       

 11-08-2007
1.0
Setup Smithy Granite 2 of 4
Details
       

 11-08-2007
1.0
Setup Smithy Granite 1 of 4
Details
       

 11-06-2007
1.0
Picked up Smithy Granite 1324 - 4 of 4
Details
     

 11-06-2007
1.0
Picked up Smithy Granite 1324 - 3 of 4
Details
       

 11-06-2007
1.0
Picked up Smithy Granite 1324 - 2 of 4
Details
       

 11-06-2007
2.0
Picked up Smithy Granite 1324 - 1 of 4
Details
       

 09-20-2007
3.0
Air Compressor
Details
       

 08-22-2007
1.0
Hanging the T Dollies
Details
     

 08-07-2007
4.0
Install Ground Rod for Welder
Details
       

 06-04-2007
2.0
Tool Table
Details
       

 06-03-2007
2.0
Working on the tool table
Details

 05-28-2007
8.0
Made table to hold the tools
Details
       

 05-25-2007
1.0
Belt Sander
Details

 05-24-2007
1.0
6" Belt 9" faceplate grinder
Details
     

 05-23-2007
2.0
Setting up 10" Delta Band Saw
Details
     

 04-29-2007
4.0
Clean up and hang parts drawers
Details
       

 09-12-2006
4.0
Shopping and setting up Drill Press
Details
       

 09-05-2006
3.0
Hang Ailerons & Paint inside of Garage Door
Details
       

 08-03-2006
6.0
Building a Clamp Rack
Details
       

 05-01-2006
3.0
Leaf brake
Details

 03-03-2006
4.0
Building Table
Details
       

 03-02-2006
1.5
Building Table
Details
     

 03-01-2006
3.0
Building Table
Details
     

 02-28-2006
2.0
Building Table
     

 02-27-2006
4.0
Building Table
Details
     

 02-26-2006
6.0
Building Table
Details
     

 02-24-2006
3.0
Building table
Details
       

 02-12-2006
3.0
Hook up Air Brush and test
Details

 01-02-2006
7.0
Build material rack to hold sheets on edge
Details
       

 12-27-2005
4.0
Made portable workbench
Details
       

 12-19-2005
3.0
Hung Conduit in garage
Details

 12-18-2005
8.0
Blow in Insulation
Details

 12-14-2005
3.0
Pulled wire for electrical in garage

 12-11-2005
3.0
Raised cabinets to clear material rack
Details
     

 11-15-2005
15.0
Soffit Vents and Can Lights
Details
     

 08-13-2005
5.0
Attic Ladder in Garage
Details

 02-27-2005
8.0
Reznor UDAP75, a 75000 BTU garage furnace
Details
       











Copyright © 2001-2013 Matronics. All Rights Reserved.