KitLog pro

Powered By Kitlog Pro v2.0

Ron Lendon's Aircraft Mfg.
' style=
Date:  12-11-2005
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Raised cabinets to clear material rack

The cabinets had to be raised 6" to clear the material rack and electrical conduit run. One man job with floor jack and custom 2 x 4.
' style=

Cabinets behind bench raised 6

Cabinets behind bench raised 6"

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.