Brief Description: Layout rivet holes on Cabin Floor
Started with the Heel Support 6B8-8, 10mm in from outboard end of 6B8-8 at 40mm pitch.
Next layed out the brake parts (going with dual) on the 6B8-3 part first then transfered the holes to the cabin floor. Made a 13mm spacer to locate the outboard brake cylinder locations.