KitLog pro

Powered By Kitlog Pro v2.0

Ron Lendon's Aircraft Mfg.
' style=
Date:  2-1-2009
Number of Hours:  2.00
Manual Reference:  6b8
Brief Description:  Layout and locate 6b8-11 & 6b8-10

Clamping pre drilled 6b8-11 to 6b7-1. Using flat blocks to keep everything in line prior to drilling through 6b7-1.

The rivet from 6b8-10 will hit the 12mm flange on 6b8-1. So I used pliers to bend the flange away locally.

Cleared out the 2" hole where it passe through 6b8-11

Open rivets holes for the A5's.
' style=

Clamping 6b8-11

Clamping 6b8-11

' style=

Bent 12mm flange to clear rivet

Bent 12mm flange to clear rivet

' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.