KitLog pro

Powered By Kitlog Pro v2.0

Ron Lendon's Aircraft Mfg.
' style=
Date:  11-3-2010
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Move rear fuselage back and start front build up

Moved the rear fuselage back so the front will be all on the table. Reset the level and checked with laser light and level.

Built up the front floor and got it mostly riveted.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.